WP 5 ILC Siting in Europe Work Package Report ILC-Hi. Grade Scientific and Annual Mtng. Laboratoire de l’Accélérateur Linéaire · LAL Orsay · France · March 6, 2009 Wilhelm Bialowons · DESY & GDE LAL · Orsay, March 6, 2009 ILC-Hi. Grade Annual Meeting Global Design Effort 1
RDR Executive Summary A second European sample site near DESY, Hamburg, Germany, has also been developed. This site is signicantly different from the three reported sites, both in geology and depth (25 m deep), and requires further study. In addition, the Joint Institute for Nuclear Research has submitted a proposal to site the ILC in the neighbourhood of Dubna, Russian Federation. LAL · Orsay, March 6, 2009 ILC-Hi. Grade Annual Meeting Global Design Effort 2
Outline • Introduction • Mission or justification for Work package 5 • The last ILC-Hi. Grade Meeting was August 29, last year. What happened in the meantime? • W. B. is GDE contact person for the investigation of the Russian sample site near JINR in Dubna – The plan was to visit Dubna several times to support their site investigation – First and currently last visit September 28 to October 1, 2008 for XXI. Ru. Pac 08 • Legal Issues Visit of LBA with Frank Lehner LAL · Orsay, March 6, 2009 ILC-Hi. Grade Annual Meeting Global Design Effort 3
The International Linear Collider From RDR to TDP XXI. Russian Particle Accelerator Conference Zvenigorod · September 29 to October 3, 2008 Wilhelm Bialowons · GDE LAL · Orsay, March 6, 2009 ILC-Hi. Grade Annual Meeting Global Design Effort 4
GDE Project Structure for TDP Associate Project Manager LAL · Orsay, March 6, 2009 ILC-Hi. Grade Annual Meeting Global Design Effort 5
Potential ILC Site at Dubna in Russia Siting Studies in Europe The Joint Institute of Nuclear Research (JINR) in Dubna has proposed a site near their institute, south of the Volga river. That proposal comprises a machine close to the surface but constructed using tunnel-boring machines. Sufficient power from the Russian national grid is available. The project will assess the potential of such a site and conclude on the benefits and risks. LAL · Orsay, March 6, 2009 ILC-Hi. Grade Annual Meeting Global Design Effort 6
General Layout of the Site Near Dubna LAL · Orsay, March 6, 2009 ILC-Hi. Grade Annual Meeting Global Design Effort 7
Geological Cut of the Dubna Sample Site LAL · Orsay, March 6, 2009 ILC-Hi. Grade Annual Meeting Global Design Effort 8
XXI. Ru. Pac 08 in Zwenigorod, Russia • (Short) Meeting with Grigori Shirkov, JINR – Discussion on Dubna site investigation – He reported that JINR needs approval for this design work from the Russian Funding Agency – Additionally Intellectual Property Rights must be guarantied! – Some Test drillings along the route were made. Contract with GSPI over 1 M Rubel (~ 30 k€) for ground investigations – No additional manpower and money for further design work for a shallow single tunnel is available at JINR – Results are confidential – Grigori S. asked for money for drilling additional wells – W. B. sees presently and in the near future no chance for a shallow site investigation at Dubna – Bur perhaps money could help to improve this situation LAL · Orsay, March 6, 2009 ILC-Hi. Grade Annual Meeting Global Design Effort 9
Visit of Plan Approval Authority LBA • Frank Lehner and W. B. visited the XFEL Plan Approval Authority LBA Landesbergamt (Mining Autority of Lower Saxony) in Clausthal-Zellerfeld on September 16, 2008 – We discussed an international approval procedure and the possibility of using mining rules – No results – We will continue this work • Additionally W. B. is participating the (bi-) weekly GDE CF&S meetings LAL · Orsay, March 6, 2009 ILC-Hi. Grade Annual Meeting Global Design Effort 10
List of Beneficiaries Beneficiary number 1 (Coordinator) Beneficiary name Stiftung Deutsches Elektronen-Synchrotron Beneficiary short name Country DESY Germany CEA France 2 Commissariat à l’Energie Atomique 3 European Organization for Nuclear Research CERN Switzerland 4 Centre National de la Recherche Scientifique CNRS France 5 Istituto Nazionale di Fisica Nucleare INFN Italy 6 The Chancellor, Masters and Scholars of the University of Oxford UOXF. DL UK LAL · Orsay, March 6, 2009 ILC-Hi. Grade Annual Meeting Global Design Effort 11
Summary • An important part of the Technical Design Report in 2012 is a new cost estimate with (hopefully) reduced cost • A key item for cost reduction are the Conventional Facilities and the Siting • Shallow sites and single tunnel designs are promising significant cost reduction • In Total Cost savings of more than 500 MILCU are possible for the CFS • Europe can (and should) bid to host and has the choice between several sites and deep and shallow tunnels • Next step: Set up a working group LAL · Orsay, March 6, 2009 ILC-Hi. Grade Annual Meeting Global Design Effort 12