VA PUGET SOUND PROJECT OVERVIEW - MAY 22, 2012 PUGET SOUND HEALTH CARE SYSTEM VA PUGET SOUND PROJECT OVERVIEW - MAY 22, 2012 PUGET SOUND HEALTH CARE SYSTEM CORRECT SEISMIC DEFICIENCIES BUILDING 100, NURSING TOWER AND COMMUNITY LIVING CENTER

VAPSHCS CORRECT SEISMIC DEFICIENCIES BUILDING 100, NT & CLC OUR PRINCIPLES DURING DESIGN AND VAPSHCS CORRECT SEISMIC DEFICIENCIES BUILDING 100, NT & CLC OUR PRINCIPLES DURING DESIGN AND DOCUMENTATION: • CONSIDER THE NEEDS OF THE VETERAN FIRST, • PROVIDE CALM AND PEACEFUL ENVIRONMENTS, • PROVIDE FOR THE NEEDS OF THE STAFF ADDITIONALLY, WE WOULD ADD: • CONSIDER THE PHASING NEEDS AND CONSTRAINTS OF THE STATION PRIOR TO, DURING, AND AFTER CONSTRUCTION PROJECT PRINCIPLES

VAPSHCS CORRECT SEISMIC DEFICIENCIES BUILDING 100, NT & CLC DESIGN TEAM VA TEAM Ian VAPSHCS CORRECT SEISMIC DEFICIENCIES BUILDING 100, NT & CLC DESIGN TEAM VA TEAM Ian Lawlor Project Director / Stantec Warren Yip Project Manager / VA CFM Robert Shurell Project Manager/ Stantec Ronald Ferrer Contracting Officer / VA CFM Walter Lehle Project Architect/ The Design Partnership Reginald Berry Contracting Specialist / VA CFM David Gonzalez Structural Lead / Degenkolb Stephen Knapowski Senior Resident Engineer / VA CFM Cale Ash Structural Engineer/ Degenkolb Peter Eberle Mechanical Lead / Stantec Rowe Moyle Electrical Lead / Sparling Jeff Peterson Civil Lead / Coughlin Porter Lundeen TEAM

VAPSHCS CORRECT SEISMIC DEFICIENCIES BUILDING 100, NT & CLC EXISTING FACILITIES NT – Nursing VAPSHCS CORRECT SEISMIC DEFICIENCIES BUILDING 100, NT & CLC EXISTING FACILITIES NT – Nursing Tower CLC – Community Living Center D&T – Diagnostics & Treatment B 1 – Old Main Building B 16 – Auxiliary Generator CUP – Central Utility Plant ED – Emergency Department MHR NT DEMOLISHED FACILITIES B 18 – Administration Building B 20 – Retail Store B 22 – Canteen Building B 24 – Temp Office Building NEW FACILITIES MHR – Mental Health & Research PS – Parking Structure (1000 Car) CLC ED D&T CUP PS B 16 B 18 B 20 B 24 B 22 N SITE PLAN

VAPSHCS CORRECT SEISMIC DEFICIENCIES BUILDING 100, NT & CLC PROJECT BACKGROUND BUILDING 100 - VAPSHCS CORRECT SEISMIC DEFICIENCIES BUILDING 100, NT & CLC PROJECT BACKGROUND BUILDING 100 - MULTI-PART BUILDING CONSTRUCTED IN 1985 • NURSING TOWERS (NT) - EAST AND WEST • CENTRAL CORE (CC) • COMMUNITY LIVING CENTER (CLC) • DIAGNOSTIC AND TREATMENT (D&T) – SEISMIC UPGRADE DONE PREVIOUSLY - NOT PART OF THIS PROJECT GENERAL SCHEDULE & PROJECT PARAMETERS • OVERALL SCHEDULE COORDINATION WITH VA MINOR PROJECTS FOR DEPARTMENT MOVES • PHASE-BY-PHASE SCHEDULE TO PERFORM ALL ASPECTS OF WORK WITHIN ALLOWABLE DURATION • EACH PHASE WORK AREA MUST BE COMPLETED BEFORE CONTRACTOR TAKES POSSESSION OF NEXT PHASE WORK AREA • MAINTAINING UTILITIES, ACCESS, AND EXITING DURING CONSTRUCTION

VAPSHCS CORRECT SEISMIC DEFICIENCIES BUILDING 100, NT & CLC STRUCTURAL UPGRADE - NT • VAPSHCS CORRECT SEISMIC DEFICIENCIES BUILDING 100, NT & CLC STRUCTURAL UPGRADE - NT • STRUCTURAL BRACE REPLACEMENT • ADD BRACES AT SELECTED LOCATIONS • COLUMN BASE STRENGTHENING • LINK BUILDINGS IN INTERSTITIAL • DETACH UNNECESSARY BRACES IN CENTRAL CORE STRUCTURAL UPGRADE - CLC • STRUCTURAL BRACE REPLACEMENT • ADD BRACES AT SELECTED LOCATIONS • REMOVE BRACES AT SELECTED LOCATIONS • COLUMN BASE STRENGTHENING • COLUMN / ROOF STRENGTHENING NONSTRUCTURAL UPGRADE • CORRECT THE SEISMIC DEFICIENCIES OF SELECTED UTILITY SYSTEMS IN THE MECHANICAL AREAS AND INTERSTITIAL FLOORS OF NT, CC, & CLC BASIC SCOPE OF WORK

VAPSHCS CORRECT SEISMIC DEFICIENCIES BUILDING 100, NT & CLC GENERAL CONCEPT VAPSHCS CORRECT SEISMIC DEFICIENCIES BUILDING 100, NT & CLC GENERAL CONCEPT

VAPSHCS CORRECT SEISMIC DEFICIENCIES BUILDING 100, NT & CLC SEISMIC UPGRADE TO MEET IMMEDIATE VAPSHCS CORRECT SEISMIC DEFICIENCIES BUILDING 100, NT & CLC SEISMIC UPGRADE TO MEET IMMEDIATE OCCUPANCY • STRUCTURAL AND NONSTRUCTURAL UPGRADE • REPLACEMENT OF EXISTING QUAD-ANGLE BRACES WITH BUCKLINGRESTRAINED BRACES (BRBs) • TIE TWO NURSING TOWERS TO CENTER CORE BUILDING • TOP-DOWN APPROACH TO AVOID SOFT-STORY CONDITION • RESTRICTION TO NOT REMOVING MORE THAN TWO BRACES AT A TIME PER LEVEL • INTERSTITIAL LEVEL RESUPPPORT AND BRACING • MAINTAIN INTEGRITY OF EXTERIOR METAL WALL PANELS NONSTRUCTURAL UPGRADE • LASER SCANNING DOUCMENTATION AND COORDINATION • LIMITED TO INTERSTITIAL SPACES, MECHANICAL ROOMS, & DISTRIBUTION LINES AT BASEMENT SUPPLIERS MUST MEET BUY AMERICA ACT • BRB FRAMES • MECHANICAL & ADHESIVE ANCHORS D&T HAD SIMILAR SEISMIC UPGRADE

VAPSHCS CORRECT SEISMIC DEFICIENCIES BUILDING 100, NT & CLC HARD SEISMIC INSTALLATION VAPSHCS CORRECT SEISMIC DEFICIENCIES BUILDING 100, NT & CLC HARD SEISMIC INSTALLATION

VAPSHCS CORRECT SEISMIC DEFICIENCIES BUILDING 100, NT & CLC INTERSTITIAL SPACE VAPSHCS CORRECT SEISMIC DEFICIENCIES BUILDING 100, NT & CLC INTERSTITIAL SPACE

VAPSHCS CORRECT SEISMIC DEFICIENCIES BUILDING 100, NT & CLC NONSTRUCTURAL INSTALLATION VAPSHCS CORRECT SEISMIC DEFICIENCIES BUILDING 100, NT & CLC NONSTRUCTURAL INSTALLATION

VAPSHCS CORRECT SEISMIC DEFICIENCIES BUILDING 100, NT & CLC AREAS OF WORK • AREA VAPSHCS CORRECT SEISMIC DEFICIENCIES BUILDING 100, NT & CLC AREAS OF WORK • AREA OF WORK – AREAS OF NURSING FLOOR & INTERSTITIAL WITHIN THE NEGATIVE PRESSURE DUST BARRIER • PHASE WORK AREA – APPROXIMATELY HALF FLOOR, SECURED BY DRYWALL BARRIOR & INTERSTITIAL FLOOR ABOVE • ACCESS TO WORK AREA – WITHIN THE PHASE WORK AREA WHERE CONTRACTOR MAY PERFORM STAGING & MATERIAL MOVEMENT (NOTE, NO DUST PRODUCING ACTIVITIES)

VAPSHCS CORRECT SEISMIC DEFICIENCIES BUILDING 100, NT & CLC SITE ACCESS & STAGING • VAPSHCS CORRECT SEISMIC DEFICIENCIES BUILDING 100, NT & CLC SITE ACCESS & STAGING • UPGRADE FIRE LANE FOR CONTRACTOR & CRANE ACCESS (IF NECESSARY) • CONTRACTOR STAGING AT NORTH SIDE OF BUILDING MATERIAL ACCESS • LIKELY VIA WINDOW OR EXTERIOR METAL WALL PANELS (CAUTION - WALL PANELS ARE INTERLOCKING) • THROUGH ONE OR MULTIPLE LOCATIONS FOR EACH PHASE WORK AREA • SMALLER MATERIALS VIA FREIGHT ELEVATOR BRB MOVEMENT • ONE OPTION SHOWN, BUT CONTRACTOR MAY SUGGEST OTHER OPTION • 25 TO 30 FT. BRBs MUST BE MANEUVERED INTO PLACE • BRB SPANS INTERSTITIAL DECK – CUT SLOTS IN DECK TO ALLOW HOISTING INTO PLACE FROM NURSING FLOOR BELOW • INTERSTITIALS CAN BE CONGESTED