Trig. - Estimate to Complete US CMS DOE/NSF Review: April 11 -13, 2000 1 Trig. - Estimate to Complete US CMS DOE/NSF Review: April 11 -13, 2000 1

CSC Trigger Overview From DT Track-Finder (Vienna) 12 Sector Processors MB 1 DT TF CSC Trigger Overview From DT Track-Finder (Vienna) 12 Sector Processors MB 1 DT TF 1 Muon Sorter SP ME 4 OPTICAL (Vienna) ME 2 -ME 3 To Global Muon Trigger ME 1 SR PC From CSC Port Cards 3 / port card (Rice) SP 36 Sector Receivers (UCLA) MS 3 / sector 12 sectors (Florida) 4 (Rice) GMT 4 From DT 8 Track-Finder RPC US CMS DOE/NSF Review: April 11 -13, 2000 2

Prototype Crate Layout SR SR SP SR CCB One sector is half of Track. Prototype Crate Layout SR SR SP SR CCB One sector is half of Track. Finder crate Six crates for entire system US CMS DOE/NSF Review: April 11 -13, 2000 3

Sector Receiver Status Schematics near complete, Long lead-time parts ordered US CMS DOE/NSF Review: Sector Receiver Status Schematics near complete, Long lead-time parts ordered US CMS DOE/NSF Review: April 11 -13, 2000 4

Trigger - BCWS and BCWP US CMS DOE/NSF Review: April 11 -13, 2000 5 Trigger - BCWS and BCWP US CMS DOE/NSF Review: April 11 -13, 2000 5

Slides (Slides before here are extras not to be shown) US CMS DOE/NSF Review: Slides (Slides before here are extras not to be shown) US CMS DOE/NSF Review: April 11 -13, 2000 6

CSC Front End &Trigger EMU System Trigger System Strip LCT + Motherboard card LCT CSC Front End &Trigger EMU System Trigger System Strip LCT + Motherboard card LCT Strip FE cards FE (OSU) FE (CMU) Port Card WBS 3. 1. 1. 1 (UCLA) (Rice) RPC Interface Module In peripheral crate WBS 3. 1. 1. 3, 3. 1. 1. 4 SR (UCLA) (Rice) RIM (Rice) US CMS DOE/NSF Review: April 11 -13, 2000 WBS 3. 1. 1. 2 PC TMB LCT Sector Receiver Sector Processor OPTICAL (UCLA) Wire LCT card Wire FE cards On chamber CSC Track-Finder SP (Florida) 3 / port card 2 / chamber 3 / sector In counting house RPC 4 CSC Muon Sorter (Rice) DT 4 Global Trigger (Vienna) 4 Global L 1 4 7

Muon Port Card Design & Optical Link Tests Muon Proto. Port Card passed design Muon Port Card Design & Optical Link Tests Muon Proto. Port Card passed design review in Oct. Will be produced for summer pilot test (Rice) Optical component test board based on HP G-Link demonstrated synchronous 1 Gbit/sec using 40 MHz clock with bit error rate < 10 -14 for connection from Muon Port Card in peripheral crates on detector to Sector Receiver in counting Room track finder crate (Rice) US CMS DOE/NSF Review: April 11 -13, 2000 8

Standard VME Sector Processor Prototype VME/JTAG interface (under development) Bunch Crossing Analyzer Final Extrapolation Standard VME Sector Processor Prototype VME/JTAG interface (under development) Bunch Crossing Analyzer Final Extrapolation Track Units Assembler Selection Units XCV 50 BG 256 XCV 400 BG 560 SRAM Assignment Units • 12 layers XCV 150 BG 352 XCV 50 BG 256 Custom Channel. Link backplane SRAM US CMS DOE/NSF Review: April 11 -13, 2000 • Layout complete • Tests set for 6/1/00 9

Trigger - BCWS and BCWP Cumulative BCWP/BCWS = 85% indicating little schedule slippage. Trigger Trigger - BCWS and BCWP Cumulative BCWP/BCWS = 85% indicating little schedule slippage. Trigger subsystem has completed BCWP/EAC = 22% of the project. Schedule slip for Muon Trigger boards corrected this year by new personnel Schedule slip for ASIC development corrected by securing vendor contract Obligation of ASICs under contract, not invoiced Corrected for DAQ attribution to Trigger US CMS DOE/NSF Review: April 11 -13, 2000 10

Trigger Resource Usage Engineering and Technical resources are compared to the people called out Trigger Resource Usage Engineering and Technical resources are compared to the people called out in the annual SOW. This tracking ensures that the needed labor is deployed. US CMS DOE/NSF Review: April 11 -13, 2000 11

TRIDAS - Contingency Use No significant contingency use thus far (note scale) Obligation of TRIDAS - Contingency Use No significant contingency use thus far (note scale) Obligation of ASICs under contract at small increase over original estimate Schedule advanced for ASIC purchases, reducing escalation US CMS DOE/NSF Review: April 11 -13, 2000 12

Trig. - Estimate to Complete Trigger Cost to Complete: $5. 7 M EDIA M&S Trig. - Estimate to Complete Trigger Cost to Complete: $5. 7 M EDIA M&S 35% 65% US CMS DOE/NSF Review: April 11 -13, 2000 13

Trigger - Yearly BCWS Costs ramp up until production, the bulk of which happens Trigger - Yearly BCWS Costs ramp up until production, the bulk of which happens in FY 02. M&S costs dominate at 65% of the ETC. US CMS DOE/NSF Review: April 11 -13, 2000 14

Trigger - Milestones Critical Level 1 Milestone is TDR, planned for year end. TDR Trigger - Milestones Critical Level 1 Milestone is TDR, planned for year end. TDR will have schedule for trigger project with tie points to CMS subsystems approved by CMS management & LHCC. Status: first draft exists. US CMS DOE/NSF Review: April 11 -13, 2000 15

Last Review Concerns Increase Physicist Effort • Calorimeter Trigger: Wisconsin: • Faculty Search involving Last Review Concerns Increase Physicist Effort • Calorimeter Trigger: Wisconsin: • Faculty Search involving CMS Trigger Effort • Muon Trigger • Florida & UCLA: support for postdoc continuing • UCLA: Prof. Bob Cousins joins Increase Engineering Effort • • Wisconsin: add engineer (now 4 FTE available) Florida: add engineer + 3 PNPI visitors (3. 5 FTE*) Rice: add 1/2 engineer (2. 5 FTE*) (*shared w/EMU) UCLA: add engineer + FPGA consultant (1 FTE) US CMS DOE/NSF Review: April 11 -13, 2000 16

Issues from Last Review Calorimeter Trigger: • Serial link from E/HCAL readout • Test Issues from Last Review Calorimeter Trigger: • Serial link from E/HCAL readout • Test results provide proof of principle • Vendor Support for ASICs • Contract signed with Vitesse for all ASICs • Final Algorithms & Tower Geometry • Agreed and being written up in TDR Muon Trigger • Peripheral Crates: • Plan developed: crate electronics & mounting • Overlap Region btw. CSC & Drift Tube • Agreement with Vienna on design US CMS DOE/NSF Review: April 11 -13, 2000 17

Plans for this year Muon Trigger: • Construct & test prototype port card, sector Plans for this year Muon Trigger: • Construct & test prototype port card, sector receiver, sector processor, clock card, backplane • Integration test of above components with each other and EMU prototypes Calorimeter Trigger • Complete & test prototype Phase, Boundary Scan, Sort, Electron ID ASIC’s w/Vitesse • Produce and test 2 nd prototype Receiver Card, Backplane, Electron ID Cards w/ ASICs Trigger Group • Write TDR US CMS DOE/NSF Review: April 11 -13, 2000 18

Conclusions - Trigger Calorimeter Trigger Prototype Program • Adder ASIC tested and in production Conclusions - Trigger Calorimeter Trigger Prototype Program • Adder ASIC tested and in production • Phase, Bscan ASIC passed design review • Prototype Receiver Card, Electron ID Card, Backplane tested Muon Trigger Prototype Program • Ready by June: Port Card, Sector Receiver, Sector Processor, Backplane, Clock Board • Track-finder integration test this summer Project Management: • Good cost experience thus far • Effective action taken to recover schedule US CMS DOE/NSF Review: April 11 -13, 2000 19