Tracker November System Manager Meeting R. P. Johnson U. C. Santa Cruz November 17, Tracker November System Manager Meeting R. P. Johnson U. C. Santa Cruz November 17, 2004 Tracker 1

Tracker Estimated Cost at Completion Actual Cost of Work Performed (ACWP), end of September Tracker Estimated Cost at Completion Actual Cost of Work Performed (ACWP), end of September ‘ 04 September outstanding commitments $15, 155, 000 $1, 537, 000 Professional Services still to go (COI, Parlex, Tackes, etc. ) $230, 000 Travel forecast $143, 000 Budgeted Cost of Work Scheduled for Labor through July ’ 05 $492, 000 Stellar Solutions Manpower (CR 4837) $552, 000 Estimated liens $2, 467, 000 Estimated cost at completion (sum of all lines above) $20, 576, 000 Current budgeted cost at completion $17, 126, 000 Estimated overrun (difference of the above 2 lines) November 17, 2004 Tracker $3, 450, 000 2

Liens Tungsten tile etching and priming at GSFC Quote $138, 000 Introduction of new Liens Tungsten tile etching and priming at GSFC Quote $138, 000 Introduction of new processes at Teledyne (bakeout, ESD ionizers, etc) Quote $73, 000 Payment to Teledyne for MIP-1 failures due to CFM Quote $40, 000 Increase term for source inspector at Teledyne Quote $53, 000 More pitch adapters for MCM production Est. $42, 000 More Omnetics connectors Quote Purchase surplus SSDs from Hamamatsu PO $62, 000 More carbon-carbon closeout material Est. $30, 000 Out-of-house work required because of safety stand-down Est. $50, 000 November 17, 2004 Tracker $127, 000 3

Liens Overrun on flex-circuit cables (incl. 2 nd source) Wag $290, 000 Various GSE, Liens Overrun on flex-circuit cables (incl. 2 nd source) Wag $290, 000 Various GSE, and upgrade to the CMM area (next slide) Est. $34, 000 TQCM for T/V testing Quote $27, 000 Sidewall prepreg Quote $16, 000 EMI testing Wag $50, 000 Continuation of Stellar Solutions labor through Sept. Quote $330, 000 Continuation of SLAC over-budget labor through Sept. Est. $855, 000 Misc. parts and materials to support Italian production Wag $150, 000 November 17, 2004 Tracker 4

GSE Items Tower support stand $10, 000 TEM/PS support $1000 Dark box $1000 Lifting GSE Items Tower support stand $10, 000 TEM/PS support $1000 Dark box $1000 Lifting hoist $5000 Lift sling $1000 Cable bending tool $5000 Pitch-adapter test fixture $3000 Upgrade to CMM area for contamination control $8000 November 17, 2004 Tracker 5

Descopes • Build only 16 or 17 flight towers? – Tower-0 used up a Descopes • Build only 16 or 17 flight towers? – Tower-0 used up a lot of flight material that we have to replace if we want to build the 18 th tower. – We are having yield problems with other parts, in particular the MCMs. • This potentially could require painful actions such as making more ASICs in order to built 18 more towers. • We are already going out to purchase more long-lead material such as the carbon-carbon for tray fabrication, and we are considering building more bottom-tray closeouts (all U. S. expense). – Tower-0 probably could be refitted to make an acceptable beam-test tower by replacing or reworking the layers that are dead using good, but non-flight parts. – Such a beam-test tower would not require environmental testing, resulting in some more savings. November 17, 2004 Tracker 6