Tier-2 Status Report T 2_IN_TIFR of all-of-us, for all-of-us, by some-of-us March 27, 28 Tier-2 Status Report T 2_IN_TIFR of all-of-us, for all-of-us, by some-of-us March 27, 28 2009 India. CMS Meeting, Delhi 1

Hardware Resources (Computing) 80 K equivalent of SI 2 K • Dual Xeon@3. 6 Hardware Resources (Computing) 80 K equivalent of SI 2 K • Dual Xeon@3. 6 GHz, 1 U servers • 1 GB/core memory • Additionally, 45 Blade Servers • Quad Core Clovertown (E 5355@2. 66 GHz) • 2 GB/core memory: 72 GB HDD (15 K rpm) • 16 Blades/enclosure • Occasionally some of the servers are failing, under investigation. March 27, 28 2009 India. CMS Meeting, Delhi 2

CPUs. C CPUs CPUs. C CPUs

T 1_ASGC in Taiwan had an unfortunate fire accident, has been down for more T 1_ASGC in Taiwan had an unfortunate fire accident, has been down for more than 1 month. Official MC simulation jobs , ie, Production at our T 2, is supposed to be initiated by ASGC.

Hardware Resources (Storage) DPM (Disk Pool Manager) with SRM (storage server module) support. 34 Hardware Resources (Storage) DPM (Disk Pool Manager) with SRM (storage server module) support. 34 TB of RAID-6 with 2 GB FC (HP EVA 8 K). + 350 TB of RAID-6 pledged, available currently about 100 TB In storage boxes: • 4 U, 24 Hot Swap bays, quad core 2 processors • 2 GB/core memory • Enterprize class 1 TB SATA 2 HDDs • SLC(X 86_64, 64 -bit), xfs • Multiple NICs. • For India-CMS user, storage set aside ~ 20 TB 0. 5 TB/user. • If you want to make use of this T 2, and don’t have assigned directory, contact us. • Minimal ‘how to’ has been circulated already (must have valid grid certificate). March 27, 28 2009 India. CMS Meeting, Delhi 5

Network 1 Gbps LAN for the farm. Dedicated 300 Mbps/1 Gbps link to CERN Network 1 Gbps LAN for the farm. Dedicated 300 Mbps/1 Gbps link to CERN (1: 1). 45 Mbps internet link (GEANT) to CDAC, about to be upgraded to 100 Mbps. CDAC to Milano: 100 Mbps GEANT link. Recently CERN link has been peered with GEANT link connectivity of our T 2 with various T 1 s and outside world has improved dramatically! èCrucial Milestone achieved = Load Test Success (we had succeeded already only with CERN) Hardware Firewall Units (Gbps). March 27, 28 2009 India. CMS Meeting, Delhi 7

Tier 0/1 Centre Tier 2 Centre and CMS users 300/1000 Mbps Internet Tier 2 Tier 0/1 Centre Tier 2 Centre and CMS users 300/1000 Mbps Internet Tier 2 and Alice users VECC TIFR 2/10 Mbps • Tier 2/3 Centers in India CERN/ GEANT 100 Mbps 4 Mbps 34/100 Mbps 2/10 Mbps POP in Mumbai Tier 3 and CMS Users 34/100 Mbps Uses WLCG tools ALICE: Universities & Institutes Tier 3 BARC CMS: Universities & Institutes Tier 3 DAE/DST/ERNET: Geant link operational since August 2006

Infrastructure • Sufficient Power. Air conditioning. UPS to support upto 50 KW for 3 Infrastructure • Sufficient Power. Air conditioning. UPS to support upto 50 KW for 3 hours. Site load will be approx 35 KW. Control cabin. • Sound proofing under consideration. • To be done: instructions to use. March 27, 28 2009 India. CMS Meeting, Delhi 12

Plans User Interface for Tier 3 almost done. Testing of jobs going on. Pledge Plans User Interface for Tier 3 almost done. Testing of jobs going on. Pledge for computing and storage resources for 2010 under consideration. March 27, 28 2009 India. CMS Meeting, Delhi 13

Site Status • Site is up and running! Please visit 1. CMS-dashboard which gives Site Status • Site is up and running! Please visit 1. CMS-dashboard which gives Sam test results in terms of site availability: overall health of the site, CE, SRMv 2. CMS Grid Map: http: //gridmap-cms. cern. ch/cms/ (click on T 2_IN_TIFR block) 2. Site Report: http: //twiki. cern. ch/twiki/bin/view/CMS/Facilities. Ops. Site. Report. Blackboard Provides Job status, Success rate, Service availability. Get familiar with Ph. EDex regarding availibility of data, transfers etc. : http: //cmsweb. cern. ch/phedex Site details in: https: //cmsweb. cern. ch/sitedb/sitelist/ (needs login) March 27, 28 2009 India. CMS Meeting, Delhi 14

March 27, 28 2009 India. CMS Meeting, Delhi 16 March 27, 28 2009 India. CMS Meeting, Delhi 16

March 27, 28 2009 India. CMS Meeting, Delhi 17 March 27, 28 2009 India. CMS Meeting, Delhi 17

March 27, 28 2009 India. CMS Meeting, Delhi 18 March 27, 28 2009 India. CMS Meeting, Delhi 18

March 27, 28 2009 India. CMS Meeting, Delhi 19 March 27, 28 2009 India. CMS Meeting, Delhi 19

Wtaunu/Summer 08_IDEAL_V 9_v 1/GEN-SIM-RECO / Hosting data /QCD_BCto. Mu_Pt 30 to 50/Summer 08_IDEAL_V 9_v Wtaunu/Summer 08_IDEAL_V 9_v 1/GEN-SIM-RECO / Hosting data /QCD_BCto. Mu_Pt 30 to 50/Summer 08_IDEAL_V 9_v 1/GEN-SIM-RECO /Tauola. TTbar/Summer 08_IDEAL_V 9_v 1/GEN-SIM-RECO • We have requested many transfers via Phedex. • Mostly Summer 08 fullsim, • Will also try to host also winter 09 fastsim samples. /QCD_BCto. Mu_Pt 120 to 170/Summer 08_IDEAL_V 9_v 1/GEN-SIM-RECO /Inclusive. PPmu. X/Summer 08_IDEAL_V 9_v 4/GEN-SIM-RECO /Inclusive. Mu 5 Pt 150/Summer 08_IDEAL_V 9_v 1/GEN-SIM-RECO /Inclusive. Mu 5 Pt 350/Summer 08_IDEAL_V 9_v 1/GEN-SIM-RECO • Some of the sample names are given. • If you need anything else, make a request in Phedex and send a mail with justification. /Ztautau/Summer 08_IDEAL_V 9_v 1/GEN-SIM-RECO /Inclusive. Mu 5 Pt 250/Summer 08_IDEAL_V 9_v 1/GEN-SIM-RECO /Inclusive. Mu. Pt 15/Summer 08_IDEAL_V 11_redigi_v 1/AODSIM /Inclusive. Mu 5 Pt 50/Summer 08_IDEAL_V 9_v 1/GEN-SIM-RECO /Zmumu/Summer 08_IDEAL_V 2_v 1/RECO /DYmumu. M 200/Summer 08_IDEAL_V 9_v 1/GEN-SIM-RECO /Wmunu/Summer 08_IDEAL_V 9_v 1/GEN-SIM-RECO