55b7eb88e40cf880e35a0a97f9560da9.ppt
- Количество слайдов: 44
This Briefing is Classified UNCLASS KEEN EDGE 2009 CPX Logistics Mr. Nolan Alvarado / TSgt Lewis This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS J 73 Timeline 05 JAN • SET UP TRANSPORTATION • INVENTORY ADP EQUIPMENT • TRACK ARRIVALS OF PACOM PERSONNEL • DEVELOP PERSONNEL ROSTER 08 JAN JWFC(6) ARRIVES 15 JAN TY ARRIVES 15 DEC ADP EQUIPMENT CONFIRMED RECEIPT @ YOKOTA DEC 09 Jan PACOM/KBSC STAFF (20) ARRIVES JAN 02 JAN Nolan arrive in Country S T A R T 04 JAN TSgt Lewis Arrive in Country 11 Jan DET 120 Kelly Kirk Arrives (6) 28 JAN Ichigaya Participants, TSgt Lewis/ Nolan Leaves E X JAN 18 06 Jan TECH TEAM(8) Arrives 15 DEC CONFIRM RETURN TRIP ON FEDEX SHIPMENT 25 JAN END EX PPM/AAR TRANSPORT PACOM PERSONNEL TO ICHIGAYA(6) 26 JAN Participants Leave (31) JAN 25 JAN 28 23 JAN Col Davis Arrives 25 JAN BEGIN PACK OUT FOR ADP EQUIPMENT IN PREPARATION FOR SHIP OUT DATE This Briefing is Classified UNCLASS 26 Jan COMPLETE PACK OUT STAGE TO PALLETIZE 27 JAN Build Pallets SHIP OUT FEDEX ADP EQUIPMENT BACK TO PACOM
This Briefing is Classified UNCLASS Event Schedule • 14 DEC: ADP Equipment received at USFJ • 18 DEC: RETURN Shipment confirm on 27 Jan 2009 • 02 Jan: Nolan arrive in country • 04 Jan: TSgt Lewis arrive in country • 05 Jan: » » Set – up transportation Inventory ADP Equipment Track Arrivals of KE participants Set-up arrival Desk for KE USPACOM participants This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS ARRIVALS • • • 06 JAN: TECH Team(8) 08 JAN: JWFC(6) 09 JAN: PACOM/KBSC Staff(20) 11 JAN: DET 120/Kirk/Kelly(6) 15 JAN: Ty Arrives 23 JAN: Col Davis arrives This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS Lodging Tracker This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS TRANSPORTATION • • • POC: TSgt Lewis Base Shuttle ‘Kanto Express” USFJ – 2 nine-pax vehicles – POC CPL DARAMY – 225 -5939 OFFICE – 646 -957 -9380 ROOM – andrew. daramy@usfj. mil DISPATCH – GOV Vehicles > 15 pax and 9 pax – Able to be given 2 vehicles – POC Chief Dispatch TSgt Cohen/SSgt Pittman – 225 -4125 office – Reservations can be made in November 4 Vehicles – Drivers • TSgt Lewis • Nolan • Herman • Brandon • SGM Agustin This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS LODGING • Kanto Lodge – Final Count for PACOM Personnel at 47 – Maj Luyando blocked Rooms – POC TSgt Lewis This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS RETURN SHIPMENT OF ADP EQUIPMENT • What – ADP Equipment on 7 Pallets – 15 Hard drives • How – FEDEX (TRANSCOM Funded) – Entered into TPFFD – Current Status • Schedule pick up POC: J 02 HQ 2 - SK 2 Smith • When – 27 January 09 • Who – TSgt Lewis POC – Nolan – Jeff Little (USFJ) • Where – Equipment will be staged for re-shipping in USFJ BECG This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS AAR / PPM • Participants – – – Col Davis Ty Wooldridge Jerry Giles Herman Ancheta Charlie Snyder Brandon Tokumoto • Transportation – Participants leave 25 Jan from Yokota AB – TSgt Lewis working with USFJ for Transport • Lodging – Maj Luyando POC • Made reservations at the Grand Hills Ichigaya • Credit Card Information received – 25 – 28 January – Col Davis leaves on 27 January This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS KEEN EDGE 2009 CPX Questions? This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS KEEN EDGE 2009 CPX Simulations Mr. Larry Tran This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS Requirements • Network Infrastructure will be in place and fully operational • USFJ J 6 TOP COP and subordinate GCCS will be fully functional • Phone directories for role players and training audience will be available • MDA will provide backup BMD systems for missile injects This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS Sim/C 4 I Architecture This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS Event Test 3 • Review / Validate C 4 I architecture – Primary path – Alternate path – JOI feed • Review / Validate / Functional JTLS database Testing – Day 1, 2 Review / Validate / Functional US Forces – Day 3, 4 Review / Validate / Functional JSO Forces – Day 3, 4, 5 Japanese JTLS OJT training • BMD testing – Day 1 and Day 2 of ET 3 • Reinforce Response Cell Operating Procedures This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS BECG Training Products due out: • Training material for C 2 PC and ICSF • Provide simulation • Provide COP • Provide missile shots This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS Warm Start Process This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS Execution These procedures will be used: • • • Model controller change procedures Shadow game procedures Checkpoint procedures Simulation Crash procedures Hardware failover procedures COP inject procedures This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS KEEN EDGE 2009 CPX Questions? This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS KEEN EDGE 2009 CPX Network / Technical Support Mr. Brandon Tokumoto This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS BECG SET-UP TIMELINE Monday Tuesday Wednesday Thursday Friday Saturday Sunday 5 -Jan 6 -Jan 7 -Jan 8 -Jan 9 -Jan 10 -Jan 11 -Jan TECH / SIM DEPLOY FROM HNL 12 -Jan 13 -Jan BECG SET-UP 14 -Jan ET 3 19 -Jan 20 -Jan 15 -Jan ET 3 16 -Jan 22 -Jan 18 -Jan COMMEX / MINIEX BECG Training 21 -Jan 17 -Jan CPX 23 -Jan 24 -Jan 25 -Jan 30 -Jan 31 -Jan 1 -Feb CPX 26 -Jan 27 -Jan 28 -Jan 29 -Jan PACKOUT / REDEPLOY AAR ICHIGAYA This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS ADVON Team • • • Jerry Giles (OIC) Brandon Tokumoto (IM/KM) Will Yip (IM/KM) Robert Chang (Systems / Network Tech) Ken Winter (COMMS / Tech / C 4 I) Mike Harraway (Systems Engineer) Larry Tran (Senior Model Control) Joe Lacalamito (COMMS / C 4 I) TSgt Lewis (BECG Admin) Nolan Alvarado (Logistics) This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS Requirements • J 73 Logisitics will have equipment available for setup within BECG spaces • J 73 Logisitics will have access badges available for setup team and access to the facility • J 73 Logisitics will have Classified hard drives available for setup • Per discussions with USFJ J 6, support will be provided as needed within normal business hours (0730 -1730) • Email and user accounts will be provided by USFJ J 6 This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS DAY 1 (JAN 7) • Validate badging and acquire access to facility • Familiarize setup team with facility • Validate equipment • Distribute tasking to setup team • Begin setup of network infrastructure • Setup servers and clients This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS DAY 2 (JAN 8) • • • Network HOT! Setup printers, projectors and peripherals Create and post signage Test and confirm all IMKM toolsets Test access to IMKM toolsets from external sites This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS DAY 3 (JAN 9) • All systems HOT! • Finalize any open issues • Assist with any additional requirements for ET#3 • Detailed POAM will be provided to all staff members This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS Event Test #3 • Support will be provided throughout ET#3 • Develop Help Desk SOP • Revisit roles and responsibilities and finalize with USFJ J 6 This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS Training / Mini. Ex • Support will be provided during both venues • Assist with training • Assist with user accounts • Assist with white cell briefings This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS CPX Support • One Network / Tech Support per shift – USFJ J 6 will also provide 1 Help Desk staff member – IM / KM will also provide support, if needed • Network / Tech Support Shifts – Mr. Robert Chang (Day Shift) – Mr. Kirk Fehn (Night Shift) This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS KEEN EDGE 2009 CPX Questions? This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS KEEN EDGE 2009 CPX Information Assurance Mr. Brandon Tokumoto This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS Security Requirements • C 2 for KE 09 CPX is CENTRIX-JAPAN – Secret releasable network • Access to SIPR – All SIPR request, must be processed through USFJ J 6 and validate by BECG Senior Control • IA briefing by USFJ J 6 will be given to all participants • USFJ J 6 is the overseeing authority for all IA issues and concerns This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS Security Guidelines • • • NO Personal Laptops NO Government Laptops NO USB NO Air Gapping of files NO Cell Phones NO PDAs This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS CENTRIX JAPAN Account • USFJ CENTRIX-JAPAN Account Request Form – Instructions available on KE 09 APAN and EPIC sites • Signed and Completed IA Certificate This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS KEEN EDGE 2009 CPX Questions? This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS KEEN EDGE 2009 CPX Information Management Mr. Brandon Tokumoto This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS IM Toolsets • EPIC – Open to all BECG members – User name and password required to access – Each BECG cell group will have a dashboard • CBT – Open to all BECG members – User name and password required to access – Two views response cell view and senior control view • Lessons Learned – Open to all BECG members – User name and password required to access • JMSEL – Open to all BECG members – User name and password required to access This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS Setup Days 1, 2, 3 • Fully engaged with setup • Coordinate with USFJ J 6 IM lead to finalize BECG and training audience directories This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS Event Test #3 • Support will be provided throughout ET#3 • Revisit roles and responsibilities and finalize with USFJ J 6 This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS Training / Mini. Ex • Support will be provided during both venues • Deliver training – EPIC – CBT – Lessons Learned • Assist with user accounts – Email • Assist with white cell briefings This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS CPX Support • One IM / KM per shift – Available to assist Network / Tech as needed • IM / KM Support Shifts – Mr. Brandon Tokumoto (Day Shift) – Mr. William Yip (Night Shift) This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS KEEN EDGE 2009 CPX Life Support / Misc Mr. Tony Mesa This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS Life Support • Passport and CAC • Military ID and Orders under SOFA • Emergency Contact – Will be provided on site • Weather - Current conditions - High 49 degrees F - Low 33 degrees F - Anticipated January weather COLDER - Bring warm clothing This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS Miscellaneous • Medication – Fill all prescriptions prior to departure and make sure they can get through customs • Bills – Coordinate all financial responsibilities prior to departure • Power of Attorney This Briefing is Classified UNCLASS
This Briefing is Classified UNCLASS KEEN EDGE 2009 CPX Questions? This Briefing is Classified UNCLASS
55b7eb88e40cf880e35a0a97f9560da9.ppt