SUSTAINABLE SITE DEVELOPMENT at SIMPSON 10 Hassacarr Close, Chessingham Park, Dunnington Before and After
Briese Soleil & Window Film reduces Solar Gain Hybrid Cars Grasscrete & Sustainable underground drainage System Grey Water from roofs stored and used in toilets – Saving approx. 200 m 3 of Mains Water per year Newt Fence FSC Timber Waste Wood chipped and blown into Silo Biomass Boiler Photo voltaic layer to run air conditioning Zone Control of low energy light fittings Solar Panels for domestic heating Recycled and Re -use warehouse Re used materials • Computer Floors • Glass • Radiators • Ironmongery Building management system & Air to Air Heat Recovery BMS conditions air and introduces ambient air on demand Eliminate Waste Wood
BEFORE
SOUTH ELEVATION OF UNIT C - FORMER WAREHOUSE OWNED BY GENUS
VIEW SOUTH OF UNIT C LOOKING WEST ALONG SOUTH ELEVATION
VIEW OF WEST ELEVATION OF UNIT B, LOOKING SOUTH TOWARDS CHESSINGHAM PARK ROAD
OTHER SITE VIEWS SHOWING UNIT B AND NEW OFFICE AREA
CURRENT
PHOTO VOLTAIC ROOF PANELS
FRONT ELEVATION OF NEW SIMPSON OFFICE, FORMERLY UNIT C 10
VIEW OF DEVELOPMENT FROM ENTRANCE GATE UNIT C – 10 HASSACARR CLOSE UNIT B CONCEPT SHOWING COMPLETED ENTRANCE NEW OFFICE UNITS 1 - 5 NEW OFFICE UNITS 6 - 9 11
MAIN ENTRANCE TO NEW OFFICE
RECEPTION AND INTERIORS OF NEW OFFICE
ENERGY SAVINGS
Energy Performance Certificate Breeam Certificate
PHOTO VOLTAIC ROOF PANELS
DISPLAY CONSOLE SHOWING POWER GENERATED AND CO 2 SAVED, AND TOTAL ENERGY GENERATED