Smart Grid and Advanced Applications Wieslaw Jerry Olechiw Vice President of International Sales &System Sales Dranetz and Electrotek Concepts Dan Sabin Monitoring Application Systems Architect Electrotek Concepts, Inc.
Smart Grid What does it mean.
Achieving Smart Grid Objectives
Achieving Smart Grid Objectives
Achieving Smart Grid Objectives
Achieving Smart Grid Objectives
Achieving Smart Grid Objectives
Achieving Smart Grid Objectives
Achieving Smart Grid Objectives
Agenda
Agenda
Historical Perspective
Historical Perspective
Historical Perspective
Historical Perspective
Agenda
IEC 61850
IEC 61850
Agenda
Overview of Data Integration
Overview of Data Integration
Historian Data. Base
Agenda
Capacitor Switching Answer Module
Example of Answer Module Output
Example of Answer Module Output
Sag Directivity Answer Module
Agenda
Automatic Bus Fault Analysis
Components of a Fault Location System
Example Single-Phase Fault
Fault Locating Process
Fault Location Performance
Agenda
Electrotek GIS Fault Visualizer: UI Mockup feature review (aerial view)
Electrotek GIS Fault Visualizer: UI Mockup (street view)
Agenda
Topology of an Area Substation
Area Substation Intelligent Devices TR #1 TR #2 TR #3 TR #4 TR #5
Area Substation SCADA Data
Linking PQView and PI Together
Area Substation Voltage Control
Area Substation Voltage Control
Area Substation Voltage Control
Histogram Charts with Relative and Cumulative Probability
Development of Control Charts
Voltage Control Results
Voltage Control Results
Station. SPe. C Challenges
Area Substation Voltage Control
Simple Application of Statistical Process Control (SPC) Methods
Simple Application of Statistical Process Control (SPC) Methods
SPC Assessment in Weekly Reports
Area Substation Voltage Control Summary
Area Substation Tap Changer Summary
Agenda
Transformer Magnetizing Inrush
Fault Current versus Inrush Current
Agenda
PI Data Integration
SDG&E Condition Based Maintenance CBM Visualization and Reporting
Example Correlation
Example Correlation
Agenda
Digital Fault Recorders
Email Fault Notification
W 72 Line Trip - Email Notification
W 72 Line Trip - Email Notification
W 72 Line Trip – Max RMS Values
Agenda
New PQView Project
New PQView Projects
New PQView Projects
New PQView Projects
Conclusions
PQView. com