Скачать презентацию SITE LOCATION AND DESIGN APPROVAL FOR DOMESTIC WASTEWATER Скачать презентацию SITE LOCATION AND DESIGN APPROVAL FOR DOMESTIC WASTEWATER

4b591ccbda3e07ee649bb49f1cbee3ca.ppt

  • Количество слайдов: 24

SITE LOCATION AND DESIGN APPROVAL FOR DOMESTIC WASTEWATER TREATMENT WORKS GARY SOLDANO, P. E. SITE LOCATION AND DESIGN APPROVAL FOR DOMESTIC WASTEWATER TREATMENT WORKS GARY SOLDANO, P. E. SOUTHEAST REGIONAL OFFICE SUPERVISOR TECHNICAL SERVICES UNIT CDPHE-WQCD CWWUC – PERMITTING SEMINAR MAY 18, 2005

REFERENCE DOCUMENTS q Colorado Water Quality Control Act q Regulation No. 22 (Site Application/Design REFERENCE DOCUMENTS q Colorado Water Quality Control Act q Regulation No. 22 (Site Application/Design Review) q q Effective June 30, 2004 Guidance Document http: //www. cdphe. state. co. us/wq/tech/reg 22/guide/22 guide. pdf q Policy 96 -1 (Design Criteria) http: //www. cdphe. state. co. us/op/wqcc/General. Info/Statutes. Regs. Policies/policy 96 -12002. pdf q Utility Plan Guidance Documents q Other? ü www. cdphe. state. co. us/wq/wqhom. asp

SITE LOCATION APPROVAL PROCESS q Preliminary Effluent Limitations (PELs) q Engineering Report (Utility Plan) SITE LOCATION APPROVAL PROCESS q Preliminary Effluent Limitations (PELs) q Engineering Report (Utility Plan) q Application for Site Approval New DWWTW q Expansion of Existing DWWTW q Lift Station / Interceptor q Amendment q

WATER QUALITY CONTROL ACT q Section 25 -8 -702 q “No person shall commence WATER QUALITY CONTROL ACT q Section 25 -8 -702 q “No person shall commence the construction of any domestic wastewater treatment works or the enlargement of the capacity of an existing domestic wastewater treatment works, unless the site location and the design for the construction or expansion have been approved by the division. ”

DESIGN APPROVAL PROCESS q Process Design Report (1. 3. 0) q Final Design Submittal DESIGN APPROVAL PROCESS q Process Design Report (1. 3. 0) q Final Design Submittal (1. 4. 0) q Lift Stations and some Amendments q Site Application and Design Reviews can be conducted concurrently ü www. cdphe. state. co. us/wq/techhom. html

DEFINITION q Domestic Wastewater Treatment Works (DWWTW) q “…a system or facility for treating, DEFINITION q Domestic Wastewater Treatment Works (DWWTW) q “…a system or facility for treating, neutralizing, stabilizing, or disposing of domestic wastewater which system or facility has a designed capacity to receive two thousand gallons of domestic wastewater per day or more. ”

DEFINITION q Domestic Wastewater Treatment Works (DWWTW) “…includes appurtenances…such as outfall sewers…” q “…does DEFINITION q Domestic Wastewater Treatment Works (DWWTW) “…includes appurtenances…such as outfall sewers…” q “…does not include industrial wastewater treatment plants…, notwithstanding the fact that human wastes generated incidentally to the industrial process are treated therein. ” q

PELs (NEW AND EXPANSION) q “…developed in coordination with the Division. ” q Impacted PELs (NEW AND EXPANSION) q “…developed in coordination with the Division. ” q Impacted by changes in: q q q water quality standards stream flows ambient water quality q 18 month “shelf life” q Capacity/Discharge point/Fees/Time? ü www. cdphe. state. co. us/wq/Permits. Unit/PELBrochure. PDF

PELs (AMENDMENT) q Change from “other types” of disinfection to any form of chlorination. PELs (AMENDMENT) q Change from “other types” of disinfection to any form of chlorination. q A decrease or increase in design capacity as long as no construction is to take place. q Change in the type of discharge employed where there is no change in the treatment process.

PELs q Questions? q Contact the Division’s Permits Unit at 303 -6923524 (Gary Beers, PELs q Questions? q Contact the Division’s Permits Unit at 303 -6923524 (Gary Beers, Work Group Leader)

ENGINEERING REPORT (NEW) q “…shall be considered the culmination of the planning process. ” ENGINEERING REPORT (NEW) q “…shall be considered the culmination of the planning process. ” q Content q q q q Service Area Issues Site and Treatment Alternatives PELs Analysis of Facilities in Service Area Consolidation Opportunities Natural Hazards Effects Soils Testing

ENGINEERING REPORT (NEW) q Content (cont. ) q q q Description of Selected Alternative ENGINEERING REPORT (NEW) q Content (cont. ) q q q Description of Selected Alternative Control of Site Institutional Arrangements Management Capabilities Financial System Implementation Plan and Schedule

ENGINEERING REPORT (EXP. ) q “…documents the need for the project, consistency with local ENGINEERING REPORT (EXP. ) q “…documents the need for the project, consistency with local long-range comprehensive plans and any approved water quality management plans…” q Content q q q Changes (service area/pop. /loading projections) PELs Analysis of Existing Treatment Works Alternatives for Treatment (consolidation) Changes in Financial System Implementation Plan and Schedule

APPLICATION FOR SITE APPROVAL q Types/Forms New – Section 22. 4 q Expansion – APPLICATION FOR SITE APPROVAL q Types/Forms New – Section 22. 4 q Expansion – Section 22. 5 q Lift Station/Interceptor – Section 22. 7 q Amendment – Section 22. 8 q ü www. cdphe. state. co. us/wq/tech/reg 22/Site App. FORMS/SAForms. html

REGULATION NO. 22 HIGHLIGHTS q Review Agency Recommendations New/Expansion - comments from all appropriate REGULATION NO. 22 HIGHLIGHTS q Review Agency Recommendations New/Expansion - comments from all appropriate local governments, 208 planning agencies and State agencies prior to submission to Division q Amendment – list the review authorities to whom the amendment proposal has been provided q

REGULATION NO. 22 HIGHLIGHTS q Posting requirements – New DWWTW and Lift Stations q REGULATION NO. 22 HIGHLIGHTS q Posting requirements – New DWWTW and Lift Stations q “Modifications” are no longer grouped with “Expansions” q Amendment – Regulation No. 22 is much more definitive of the types of changes and the associated application requirements

REGULATION NO. 22 HIGHLIGHTS q Lift Station/Interceptor Requires confirmation in writing from the wastewater REGULATION NO. 22 HIGHLIGHTS q Lift Station/Interceptor Requires confirmation in writing from the wastewater treatment entity that it will have the capacity necessary to treat the projected discharge q Proposed treatment plant phased construction must be shown in the WQMP or by appropriate planning and engineering studies. q

REGULATION NO. 22 HIGHLIGHTS q Guidance Document q q q Formulated by a stakeholder REGULATION NO. 22 HIGHLIGHTS q Guidance Document q q q Formulated by a stakeholder group Intent is to help applicants and consultants Approved by WQCC (November 2004) q Policies and Procedures q q Designed to aid in the interpretation and implementation of Regulation No. 22 Existing policies have been revised ü www. cdphe. state. co. us/wq/techhom. html

PROCESS DESIGN REPORT q Prior to final design preparation of new or expanded WWTF PROCESS DESIGN REPORT q Prior to final design preparation of new or expanded WWTF q Basis of design for each unit process Demonstrate conformance with the design criteria or explain deviations q “Shall/Should/May” q Variance or New Technology Reviews q

PROCESS DESIGN REPORT q Content General information q Design calculations q Technical elements q PROCESS DESIGN REPORT q Content General information q Design calculations q Technical elements q Preliminary Operating Plan q

FINAL DESIGN SUBMITTAL q Stamped and signed documents q q q Detailed plans Technical FINAL DESIGN SUBMITTAL q Stamped and signed documents q q q Detailed plans Technical specifications Addenda and change orders q Approval required before commencement of construction (WQCA 25 -8 -702) q Capacity evaluation q Permitting requirements

COLORADO FACTS q Surface area = 104, 247 sq. mi. q Greater than 1, COLORADO FACTS q Surface area = 104, 247 sq. mi. q Greater than 1, 500 active permits q 10 District Engineers > 10, 000 sq. mi. / D. E. (avg. ) q > 150 facilities / D. E. (avg. ) q

D. E. RESPONSIBILITIES q Planned Activities q q Inspections (WW and DW) Site Applications D. E. RESPONSIBILITIES q Planned Activities q q Inspections (WW and DW) Site Applications Design Reviews (WW and DW) SRF Support (WW and DW) q Unplanned Activities q q q Acute Situations (WW and DW) Public Assistance / Spill Duty Technical Assistance (WW and DW)

QUESTIONS? q. Denver n n Tom Armitage Cary Pilon Dennis Pontius Forrest Vaughn q. QUESTIONS? q. Denver n n Tom Armitage Cary Pilon Dennis Pontius Forrest Vaughn q. Pueblo q q Dave Knope Tim Vrudny q. Grand Junction n n Mike Havens Mark Kadnuck q. Steamboat Springs q Andy Poirot q. Durango q Greg Brand q. Coordinator – Kent Kuster (303 -692 -3574) ü www. cdphe. state. co. us/wq/tech/TSUlist. pdf