Single Meter Supply Points Discussion Points for Workstream 0428 27 September 2012
Population of meter points by SPAQ band National SPAQ (k. Wh) MP Count 0 -73, 200 11, 455 73, 201 - 293, 000 28, 149 293, 001 - 732, 000 18, 237 732, 001 - 2, 196, 000 17, 661 2, 196, 001 - 5, 860, 000 7, 447 5, 860, 001 - 14, 650, 000 2, 649 14, 650, 001 - 29, 300, 000 885 29, 300, 001 - 58, 600, 000 390 >58, 600, 001 359 Total 87, 232 11, 455 13. 13% 46, 386 53. 18% 29, 391 66. 31% 33. 69% 100. 00% 2
Population of meter points by SPAQ band grouping size National 2 1) Multi meter sites with 'x' meter point reference numbers 2 MPRN 3 MPRN 4 MPRN 5 MPRN 6 MPRN 7 MPRN 8 MPRN 9, 510 1, 200 324 145 114 35 24 36 30 37 11, 455 73, 201 - 293, 000 19, 820 5, 022 1, 404 490 306 147 128 126 120 586 28, 149 293, 001 - 732, 000 8, 996 4, 083 2, 084 960 504 245 224 180 120 841 18, 237 732, 001 - 2, 196, 000 5, 168 3, 228 2, 300 1, 485 1, 110 756 632 360 330 2, 292 17, 661 2, 196, 001 - 5, 860, 000 1, 496 906 680 580 414 336 320 216 190 2, 309 7, 447 5, 860, 001 - 14, 650, 000 492 342 144 120 156 77 120 72 50 1, 076 2, 649 14, 650, 001 - 29, 300, 000 158 84 48 65 42 35 40 9 10 394 885 29, 300, 001 - 58, 600, 000 92 45 16 25 18 21 8 0 20 145 390 >58, 600, 001 134 72 44 25 0 7 8 36 0 33 359 45, 866 14, 982 7, 044 3, 895 2, 664 1, 659 1, 504 1, 035 870 7, 713 87, 232 SPAQ (k. Wh) 0 -73, 200 Total 10 MPRN >10 MPRN Total 3
Form of System Capacity Charge 4
Interesting points to note ¾ SP < 73, 200 k. Wh ¾ No interesting points of note!! ¾ All MPRNs keep the same capacity rate aggregated or disaggregated ¾ SP > 73, 200 k. Wh and < 293, 000 k. Wh ¾ Average increase 18% ¾ Largely due to capacity rate moving “up the step” ¾ Where Supply Points are EUC WAR banded – Meter Point SOQ has been calculated using the same EUC WAR but corresponding with the lower AQ ¾ SP > 293, 000 k. Wh and <732, 000 k. Wh ¾ Average low (1%) but wide range between -24% and +34% ¾ Largely due to move from a “WAR band” SOQ to EUC bands 1 & 2 ¾ Positives result from moving from High LF EUC bands to lower, default EUC bands - e. g. 42. 0% to 31. 3% ¾ Negatives result from a counter-positional move ¾ SP > 732, 000 k. Wh ¾ Average, across the entire bands – 25% increase ¾ All percentages based on a random sample 5
Bishop Stortford Mprn MPAQ SPAQ 1, 655, 014 Meter 480500 xx 195, 998 MDA 16 – 16 480487 xx 252, 930 MDA 16 – 16 480488 xx 111 G 4 – 6 480487 xx 252, 930 MDA 16 – 16 480489 xx 77, 348 U 6 R 5 – 212 480490 xx 76, 021 U 6 – 212 480489 xx 77, 348 U 6 R 5 – 212 480503 xx 269 8 C 125 – 800 480493 xx 121 G 4 – 6 480499 xx 87, 177 MDA 16 – 16 480498 xx 7, 653 G 4 – 6 480502 xx 434, 571 U 40 – 1412 480501 xx 311, 501 U 65 – 2296 480495 xx 1 U 6 R 5 – 212 480494 xx 21, 218 U 6 R 5 – 212 480496 xx 1 U 6 R 5 – 212 480497 xx 189, 651 MDA 25 – 25 6
Canada Life House SPAQ 1, 396, 057 Mprn MPAQ Meter 10279 xx 18, 042 U 6 - 212 10274 xx 15, 575 U 6 - 212 10275 xx 22, 138 U 16 – 565 10276 xx 16, 447 U 6 – 212 10283 xx 58, 430 U 40 – 1412 10278 xx 16, 063 U 6 – 212 10277 xx 18, 372 U 6 – 212 10282 xx 762, 990 7 M 125 – 7000 10284 xx 468, 000 11 M 125 - 11000 7
Proposed Phased Approach ¾ Immediately – no new configurations ¾ Phase 1: Within 3 months of implementation ¾ All aggregations with AQs up to 73, 200 k. Wh to be disaggregated ¾ Accounts for 11. 5 k supply points or 13% ¾ Phase 2: From 1 st April 2014 to 1 st July 2014 ¾ All aggregations with AQs above 73, 200 k. Wh & up to 732, 000 k. Wh to be disaggregated ¾ Accounts for 46 k supply points or 53% ¾ Phase 3: From 1 st April 2015 to 1 st July 2015 ¾ All aggregations with AQs above 732, 000 k. Wh to be disaggregated ¾ Accounts for remaining 29 k supply points or 36% 8