Senior Architect (WZ)I C. P. W. D. Mumbai
MULTIPURPOSE HALL FOR SPORTS AUTHORITY OF INDIA GANDHINAGAR
MULTI PURPOSE TRAINING HALL FOR SPORTS AUTHORITY OF INDIA AT GANDHINAGAR. q q TOTAL COST STATUS q THE HALL IS DESIGNED FOR TRAINING FACILITIES FOR INDOOR GAMESLIKE GYMNASTICS, BATMINTON, BASKET BALL, TABLE TENNIS, VOLLEYBALL, HAND BALL, JUDO, WRESTLING ETC. q THE MAIN HALL HAS ATTACHED CONDITIONING HALL, CHANGING ROOMS WITH TOILETS FOR LADIES AND GENTS. q THE MAIN HALL AND TABLE TENNIS HALL ARE PROVIDED WITH SECOND CLASS TEAK WOOD FLOORING IN TWO LAYERS FOR NECESSARY SPRING EFFECT WHILE PRACTICING THE VARIOUS GAMES. q THE VENTILATION SYSTEM IS DESIGNED TO PROVIDE FRESH AIR WITHOUT ANY DIRECT DRAFT. VENTILATING SHAFTS ARE PROVIDED ON WALLS TO PUSH FRESH AIR INSIDE THE HALL AND REMOVE STALE AIR. ADJUSTABLE q ALUMINIUM LOOVERS ARE PROVIDED TO CONTROL FLOW OF AIR AS PER REQUIREMENT OF DIFFERENT GAMES. 355. 21 LAKHS BUILDING COMPLETED AND HANDED OVER IN 2004
q. ACCOUSTICAL TREATMENT HAS BEEN PROVIDED ON WALLS TO MINIMISE NOISE LEVEL. q TWO NUMBER OF VIEWING GALLERIES ARE CONSTRUCTED FOR WATCHING INDOOR GAMES AS WELL AS OUTSIDE ATHLETIC EVENTS OF THE ATHLETIC TRACK IN FRONT OF THE HALL. q A T. V. MONITORING ROOM IS LOCATED AT THE CENTRE FOR LIVE TELECAST OF INDOOR GAMES AS WELL AS THE GAMESON ATHLETIC q THE ROOF IS OF SILICON MODIFIED POLYSTER COAT PRE PAINTED STEEL SHEETS. PROVISION IS MADE FOR CATWALKS FOR MAINTENANCE PURPOSE OF ESSENTIAL FLOOD LIGHT FITTINGS. `` TRACK
LAYOUT PLAN
FRONT ELEVATION SIDE ELEVATION
FRONT SIDE FACING
LEFT SIDE FACING
INDOOR VIEW
NATIONAL INSTITUTE FOR MENTALLY HANDICAPPED AT KHARGHAR NAVI-MUMBAI
SOUTH EAST VIEW -1 ESTIMATED COST PRESENT STATUS : 270. 00 LAKHS : UNDER CONSTRUCTION
SOUTH EAST VIEW -2
SOUTH EAST VIEW -3
FRONT (EAST) SIDE ELEVATION
REAR (WEST) SIDE ELEVATION
LEFT (SOUTH ) SIDE ELEVATION
RIGHT (NORTH ) SIDE ELEVATION
OFFICE BUILDING FOR INCOME TAX DEPARTMENT AT AMBAWADI, AHMEDABAD
OFFICE BUILDING FOR INCOME TAX DEPARTMENT AT AMBAWADI, AHMEDABAD v v TOTAL COST PRESENT STATUES v THIS IS A MULTISTOREYED STRUCTURE WITH BASEMENT, STILTS AND FIVE UPPER FLOORS. THE BASEMENT CATERS FOR PARKING AND ELECTRICAL SERVICES. THE BUILDING HAS THREE BLOCKS CONNECTED BY TWO SERVICE CORES. THE OFFICES LOCATED ON FIVE FLOORS OVERLOOK CENTRAL LANDSCAPED GREEN AREA. THE BUILDING IS DESIGNED AS CENTRALLY AIR CONDITIONED. v THE ENTRANCE HALL WITH DOUBLE HEIGHT ADDS ELIGANCE TO THE BUILDING. v A PERMANENT EXTERNAL FINISH OF SYNTHETIC PLASTER IS PROVIDED TO MINIMISE MAINTENANCE. v ANODIZED ALUMINIUM WINDOWS WITH TINTED GLASS ARE PROPOSED TO REDUCE LOAD ON AIRCONDITIONING. 1468 LAKHS NIT UNDER PREPARATION
LAYOUT PLAN
SOUTH SIDE VIEW
NORTH WEST SIDE VIEW
SOUTH SIDE VIEW 2
FRONT (SOUTH WEST ) SIDE ELEVATION
LEFT (NORTH WEST ) SIDE ELEVATION
RIGHT (SOUTH EAST ) SIDE ELEVATION
LABORATORY FOR NRCMAP AT BORIAVI ANAND GUJRAT
LAB BUILDING FOR NRCMAP, BORIYAVI, ANAND SENIOR ARCHITECT(WZ)I • • ESTIMATED COST PRESENT STATUS =248. 00 LAKHS COMPLETED
RESIDENTIAL QUARTERS for Income Tax Department, at Vejalpur, Ahemedabad
RESIDENTIAL QUARTERS FOR INCOME TAX DEPARTMENT AT VEJALPUR, AHMEDABAD. q q TOTAL COST PRESENT STATUS q THIS IS A MULTI STOREYED RESIDENTIAL COMPLEX FOR TYPE IV, V AND VI QUARTERS. q THE LAYOUT IS OF THREE NINE STOREYED BLOCKS WITH A LARGE CENTRAL RECREATIONAL GARDEN SPACE. q THE QUARTERS ARE PLANNED WITH MODERN INTERNAL ROADS ARE PROVIDED FOR EASY TRAFFIC FLOW. 1419 LAKHS UNDER CONSTRUCTION
LAYOUT PLAN
TYPE-IV TYPICAL FLOOR PLAN
TYPE-IV FRONT ELEVATION
TYPE-V TYPICAL FLOOR PLAN
TYPE-V FRONT ELEVATION
TYPE-VI TYPICAL FLOOR PLAN
TYPE-VI FRONT ELEVATION
63c89e62f0a500402b82fcc9b142933c.ppt