BACKGROUND § 39 YEARS GOV’T SERVICE § 30 YEARS CIVIL SERVICE § FIELD ARTILLERY TACTICAL DATA SYSTEMS § 25 YRS MANAGEMENT – (FIRE SUPPORT SWE CENTER) § 5 YRS COMPUTER SPECIALIST - (TACFIRE OS) (FT. SILL, FT. BELVOIR) § 9 YEARS MILITARY § SUPPLY, FINANCE, LOGISTICS, PERSONNEL § 4 YRS - COMPUTER SYSTEMS PROGRAMMER (IBM OS) § 3 YRS - COMPUTER OPERATOR/PROGRAMMER § 2 YRS - PUNCH CARD MACHINE OPERATOR (GERMANY, FRANCE, OKINAWA, FT. POLK/BELVOIR)
FSSE COST - SCHEDULE - PERFORMANCE TRANSITIONED 15 TACTICAL SYSTEMS, 5 UNIQUE PSE’s DEVELOPED 11 NEW TACTICAL SYSTEMS, 19 SPECIAL PURPOSE DEVELOPED 12 FS PACKAGES, 120 MAJOR SOFTWARE VERSIONS DEVELOPED 27 NEW SUPPORT SYSTEMS, 68 MAJOR SOFTWARE VER DEVELOPED 218 VERSIONS, 10, 527, 648 LOC, USING 9 LANGUAGES NEVER MISSED A DELIVERY SCHEDULE NEVER OVERRAN BUDGET NEVER IMPACTED A WEAPON, MUNITION, PROPELLANT, COMP SYS
FIRE SUPPORT SYSTEM OF SYSTEMS COMMAND & CONTROL FIRE DIRECTION FIRE CONTROL TACTICAL AIR NAVAL GUN FIRE AFATDS ACQUISITION SYSTEMS ATACMS SPAPS MLRS (FCS) FDDM CORPS MMS BATTALION BATTERY PLATOON BATTALION BATTERY OBSERVATION (AERIAL/GROUND) Q 36 Q 37 V 8 MDS DIVARTY FA BRIGADE FIREFINDER FO-MSR ATHS FIST DMD TFDMD FO-CC FOS IMBC CANNONS (GDU) BATTALION LTACFIRE PLATOON BATTERY IFSAS MLRS-FMS PALADIN (AFCS)
FIRE SUPPORT PACKAGE DEVELOPMENT 1 2 3 4 5 IFSAS PROJECT PLANNING MLRS PROJECT PLANNING BCS PROJECT PLANNING 6 7 8 SYS REQUIREMENTS ANANYSIS & DESIGN 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 DETAILED PLANNING INCREMENT 1 SA SD DC TOOLS FOS PROJECT PLANNING SYS REQUIREMENTS ANANYSIS & DESIGN DETAILED PLANNING INCREMENT 1 SA SD DC MMS PROJECT PLANNING SYS REQUIREMENTS ANANYSIS & DESIGN DETAILED PLANNING INCREMENT 1 SA SD DC ATACMS PROJECT PLANNING DETAILED PLANNING INCREMENT 1 SA SD DC FF-Q 37 PROJECT PLANNING DETAILED PLANNING INCREMENT 1 SA SD DC FF-V 8 SYS REQUIREMENTS ANANYSIS & DESIGN TOOLS PROJECT PLANNING SYS REQUIREMENTS ANANYSIS & DESIGN DETAILED PLANNING INCREMENT 1 SA SD DC CTS PROJECT PLANNING SYS REQUIREMENTS ANANYSIS & DESIGN DETAILED PLANNING INCREMENT 1 SA SD DC FF-V 8 -TD PROJECT PLANNING SYS REQUIREMENTS ANANYSIS & DESIGN DETAILED PLANNING INCREMENT 1 SA SD DC FF-Q 37 -TD RCM SRR TOOLS INCREMENT 2 SA SD DC INCREMENT 3 SA SD DC FINALIZATION FQT 1 YR - FIELDING FQT 1 YR - FIELDING FQT 1 YR - FIELDING TEST TOOLS TEST INCREMENT 2 SA SD DC INCREMENT 3 SA SD DC FINALIZATION TEST TOOLS TEST TOOLS TEST INCREMENT 2 SA SD DC INCREMENT 3 SA SD DC FINALIZATION TEST TOOLS TEST INCREMENT 2 SA SD DC INCREMENT 3 SA SD DC FINALIZATION TEST TOOLS TEST TOOLS TEST RIPR TIPR RIPR TRR
FIRE SUPPORT MILESTONES & EVENTS FY 00 FY 01 FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 1 2 3 4 1 2 3 4 1 2 3 4 MILESTONES CER DCX T 1 FDD DCX 2 MACS REQUIRED CCX N FDC 6. 2 X 7. X 8. X 9. X ABCS 10. X 11. X 12. X P 11 NSTT – 11 FS VERSION NSTT . X FS VERSION 12 – 12 FS VERSION - 7 NSTT 7. X FS VERSION - 8 NSTT 8. X NSTT FS VERSION - 9 9. X NSTT FS VERSION - 10 10. X FS VERSION - 11 AFATDS TRANSITION FS VERSION - 12 NSTT 11. X 12. X 1 2 3 4 1 2 3 4 1 2 3 4 FY 00 FY 01 FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08
PROCESS POLICIES, PROCEDURES, AND STANDARDS (PPS) 15 13 7 14 1 8 7 20 15 ORGANIZATIONAL OPERATIONS SOFTWARE ENGINEERING TESTING CONFIGURATION MANAGEMENT SOFTWARE QUALITY ASSURANCE SECURITY TRAINING LOGISTICS AND OFFICE AUTOMATION BUDGET AND ADMINISTRATION 100 TOTAL PPS’s GOVERNMENT OWNS THE PROCESS
COST & RISK DRIVERS § § REQUIREMENT VOLATILITY FUNDING INSTABILITY HARDWARE CHANGE TECHNOLOGY TRANSFER
CONTINUOUS RE-PLANNING § MULTIPLE FUNDING CUTS § CHANGING REQUIREMENTS § HARDWARE BEING ADDED/MODIFIED § CRITICAL ITEM DELAYS § EXTERNAL SYSTEM DELAYS/SLIPS
IMPACTS § § § EFFECTS SCHEDULES DRIVES UP COST INCREASES RISK EFFECTS QUALITY WASTES EFFORT
REQUIREMENT VOLATILITY § REQUIREMENT VOLATILITY • • • MULTIPLE SOURCES OF REQUIREMENTS UNCOORDINATED REQUIREMENTS INCONSISTENT UNDERSTANDING OF REQ. INTEROPERABILITY CHANGES REQUIREMENT INSTABILITY (ADD, MOD, DEL) LATE REQ. INTRODUCED THROUGHOUT DEVELOPMENT § IMPACT • • • INTEROPERABILITY PROBLEMS ARE IDENTIFIED LATE CHANGES & REDESIGN INCREASES RISK EFFECTS QUALITY SCHEDULES GET COMPRESSED, END DATE DOESN’T MOVE MULTIPLE SYSTEMS IMPACTED INDIVIDUAL SYSTEM TESTS ARE REDUCED • INSUFFICIENT TIME TO CONDUCT INTEROP TESTING
UNVERIFIED HARDWARE CHANGES § HARDWARE • NEW OFF-THE-SHELF HARDWARE • NEWLY DEVELOPED HARDWARE • CHANGED HARDWARE COMPONENTS § PROBLEM • INTRODUCED WITHOUT ADEQUATE VERIFICATION § IMPACT • RESOURCES DIVERTED TO CHANGE LEGACY SYSTEMS
FUNDING INSTABILITY § FUNDING • OMA FUNDED • CUSTOMER FUNDED FOR CUSTOMER CHANGES § PROBLEM • • MULTI-YEAR DEVELOPMENT - SINGLE YEAR FUNDING CUTS ARE TOO OFTEN AND TOO DEEP UNPLANNED CHANGES ARE OUT OF HIDE NO DISCRETIONARY FUNDING § IMPACT • CONTINUOUS RE-PLANNING
TECHNOLOGY TRANSFER PROBLEM § LEGACY SYSTEMS • OLD TECHNOLOGY (ADA 83) • SCO OPERATING SYSTEM VER 5. 02 • REACH SIZE LIMITATIONS (DISK, MEMORY, SPEED) § REUSE COMPONENTS • NO ADA 95 COMPILER FOR SCO OPERATING SYSTEM • COMPONENTS TOO LARGE FOR LEGACY REUSE • NO FUNDING TO UPGRADE LEGACY SYSTEM HDW/SW § IMPACT • UNABLE TO REDUCE COST & RISK THROUGH REUSE
AUTOMATED TEST ENVIRONMENT AUTOMATED BALLISTICS TEST AND VERIFICATION SYSTEM AUTOMATED REGRESSION TEST AND VERIFICATION SYSTEM AUTOMATED INTEROP TEST AND VERIFICATION SYSTEM AUTOMATED EFFECTS TEST AND VERIFICATION SYSTEM AUTOMATED STRESS TEST SYSTEM AUTOMATED TIMING TEST SYSTEM
S&T RECOMMENDATIONS § FORMAL PROCESS FOR MANAGING REQUIREMENTS FOR SOFTWARE BLOCKS § FORMAL PROCESS FOR MANAGING FUNDING FOR SOFTWARE BLOCKS § FORMAL PROCESS FOR VALIDATING HARDWARE