Schedule V 34. 1 RE 1048 RE 1049 HALF: RE 1/2 + and RE Schedule V 34. 1 RE 1048 RE 1049 HALF: RE 1/2 + and RE 1/3 ready for installation RE 2, 3 installed on YE+ April 05 Sep 05 2004 Milestones 2005 Milestones 3 RE 1/2 & 1 RE 1/3 pre production chambers tested Korean gaps deliveries ISR Assembly Lab on schedule CSC+RPC+LB Beam Tests Cosmic QC 20 RE 1/2 +10 RE 1/3 Production 18 RE 1/2 and 18 RE 1/3 Installation April end 60 RE 1/2 & 60 RE 1/3 Installation October-November Cosmic Tests / Magnet Test Preparation CMS Week March 14 -18, 2005 On behalf of Peking University Colleagues And all at ISR AS

Dec. 2004 HV connector Last step Cosmic stand DAQ RE 1/2 Completed chambers ready Dec. 2004 HV connector Last step Cosmic stand DAQ RE 1/2 Completed chambers ready for quality control tests in the cosmic stand CMS Week March 14 -18, 2005 AS

Production Status: 20 RE 1/2 + 30 RE 1/3 Assembled Preparation C h a Production Status: 20 RE 1/2 + 30 RE 1/3 Assembled Preparation C h a m b er s 36 needed @ X 5 April 2005 gas pipes – 120 chambers Cables – 60 chambers Mechanics. . Cover closing Alu plates Planned Chamber production rate Expected 5 per week Constructed March 20 RE 1/2 mass production re-launch GOAL: June RE 1/2 complete April end RE 1/3 Gaps expected mass production re-launch GOAL: Sept 30 RE 1/2 complete GOAL: Dec 05 All certified! CMS Week March 14 -18, 2005 AS

Database developed to store RPC production information http: //forwardrpc/cms_forward_rpc/production_db/Main_db. htm CMS Week March 14 Database developed to store RPC production information http: //forwardrpc/cms_forward_rpc/production_db/Main_db. htm CMS Week March 14 -18, 2005 AS

Create plots from cosmic test data Strip response profile CMS Week March 14 -18, Create plots from cosmic test data Strip response profile CMS Week March 14 -18, 2005 AS

Cosmic QC See Andrey’s talk % HV 9. 2 k. V m. A Noise Cosmic QC See Andrey’s talk % HV 9. 2 k. V m. A Noise < 10 Hz/cm 2 CMS Week March 14 -18, 2005 AS

4 Checklists At different stages of production Cosmic Tests : Andrey Waiting for Final 4 Checklists At different stages of production Cosmic Tests : Andrey Waiting for Final Destination: Point 5 CMS Week March 14 -18, 2005 AS

Barrel and Forward (Endcap) RPC’s Configuration and Condition database requirements for CMS Core DB Barrel and Forward (Endcap) RPC’s Configuration and Condition database requirements for CMS Core DB Team Document history - Following DB Workshop Jan 24 -28 Version Number Description 0. 1 First draft about RPC sub-detector description and related database requirements after having discussion with Frank Glege, Anil Kumar, Saima Iqbal and Marcello Abbrescia 0. 2 Initial draft provided by Archana Sharma is edited to add the configuration database requirements jointly for Forward (Endcap) RPC (requirements given by Archana Sharma) and for Barrel (given by Marcello Abbrescia) and on the basis of discussions with Frank Glege, Andrew Branson and Norbert Zoltan Toth. Saima Iqbal 14 -Feb-2005 0. 3 Comments to v 0. 2 by Archana Saima + Archana 15 -Feb-2005 0. 4 Comments to v 0. 3 by Marcello Saima + Marcello 17 -Feb-2005 0. 5 Ambiguities mentioned in v 0. 2 resolved. Add Configuration database schema (Initial version is provided after editing discussion based on requirements among Norbert, Andrew, Saima and Marcello ) and add condition database schema requirements as provided by Marcello Saima 06 -Mar-2005 0. 6 Question mentioned in V 0. 5 are resolves Saima 13 -Mar-2005 CMS Week March 14 -18, 2005 Author Archana Sharma Date 31 -JAN-2005 AS

Schema for RPC Barrel and Endcap See Marcello’s talk – DB meeting Wednesday 16 Schema for RPC Barrel and Endcap See Marcello’s talk – DB meeting Wednesday 16 at 8. 30 CMS Week March 14 -18, 2005 AS

Magnet Tests SX 5 Cables & Services 18 m horizontal distances inside SX 5 Magnet Tests SX 5 Cables & Services 18 m horizontal distances inside SX 5 HB 15 m YE+1 YE+2 magnet test position YE 1 CMS Week March 14 -18, 2005 10 m 49 m HB Counting House (see next 10 m page) 20 m 6 RE 1/2 Chambers (One sector 60 o) 6 Link Boards available AS

SX 5 Cable Paths to be defined on nc ct o de te 8 SX 5 Cable Paths to be defined on nc ct o de te 8 m m ag ne t rs ru D A Q tr ol horizontal distances Counting House only 15 m Counting House The Green Barrack CMS Week March 14 -18, 2005 AS

Summary and Conclusions • Mass production gas gaps Korea full steam • Assembly RE Summary and Conclusions • Mass production gas gaps Korea full steam • Assembly RE 1 ramped up @ ISR lab and has reached 5 chambers per week • The final RE 1/2 RPC has been mated to ME 1/2 • RE 1/3 installation exercise performed • Preparation for magnet tests started RE 1 production expects to meet the CMS master schedule for its installation and commissioning CMS Week March 14 -18, 2005 AS