SC B 5 - Protection and Automation Report to the Canadian National Committee of CIGRÉ 2010 -19 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie 2, Complexe Desjardins, tour Est 9 ième étage C. P. 10000 Montréal, QC H 5 B 1 H 7 Simon R. Chano, Hydro Québec TransÉnergie 1
SC B 5 - STRATEGIC ACTIVITIES • New or Improved concepts of SAS • Network of the future and Distributed generation • New System Integrity Protection Schemes to • • • improve network stability (Load Shedding/Restoration/SPS) Requirements from users Process Bus (architecture, reliability, transients and testing) New approaches, tools and system to eliminate human errors 2010 -19 Simon R. Chano, Hydro Québec TransÉnergie 2
SC B 5 - NETWORK OF THE FUTURE • The network of the future will give rise to significant challenges for the protection and automation systems. • Significantly enhanced complexity (intelligence) for automation, control, operation and metering will be necessary • Higher levels of reliability and flexibility from protection 2010 -19 Simon R. Chano, Hydro Québec TransÉnergie 3
SC B 5 - Main Challenges • New Wide area Protection concepts for Transmission networks. • Protection coordination & Standardization of schemes • Communication in 61850 between substations (interoperability) • Consideration of Cyber Security Constraints 2010 -19 Simon R. Chano, Hydro Québec TransÉnergie 4
SC B 5 - Main Challenges • Data management innovative applications. • New systems and procedures will be required to • • cope with huge amount of data. New data modeling standard should be developed at network level. Non-real time applications will be developed for engineering, automated disturbance data analysis, monitoring and maintenance for transmission and distribution networks 2010 -19 Simon R. Chano, Hydro Québec TransÉnergie 5
SC B 5 Advisory Group Membership AG 51 AG 52 AG 53 AG 54 V. Leitoff (FR) S. Chano (CA) R. Adams (UK) I. Mesmaeker (CH) Substation Automation and Remote Control Protection & Monitoring of Main Plant and Circuits Monitoring, Tutorials Metering, Recording and Overall Power System Protection 2010 -19 Simon R. Chano, Hydro Québec TransÉnergie 6
AG B 5 -51 Substation Automation and Remote Control WG B 5 -38: Impact of security requirements D. Holstein (US) Finished WG B 5 -12: Engineering guidelines for IEC 61850 based systems J. Castellanos (ES) 2010 -19 WG B 5 -36: Applications for protection schemes based on 61850 D. Tholomier (FR) 2010 WG B 5 -06: Maintenance strategies for SAS V. Leitloff (FR) WG B 5 -31: Management of protection settings P. Crossley (UK) 2010 Finished WG B 5 -39: Documentation requirements from design to operation to maintenance of DSAS R. Hughes (AU) 2013 Simon R. Chano, Hydro Québec TransÉnergie 7
AG B 5 -52 Protection & Monitoring of Main Plant and Circuits WG B 5 -05: Transformer protection, monitoring & control M. Sachdev (CA) Finished WG B 5/B 4 -25: Impact of HVDC on protection of AC systems X. Zhao(CH) 2012 2010 -19 WG B 5 -37: Protection, control & monitoring of shunt reactors. S. Roxenborg (SE) 2012 WG B 5 -04: Tech‘s for protection & monitoring generator plant G. Benmouyal (CA) WG B 5 -24: Protection requirements on transient response of voltage and current acquisition chain J. Jakonjsek (RU) 2013 WG B 5 -40: Education, Qualification and professional develop. of engineers in protection and control M. Kezunovic (US) 2013 Finished Simon R. Chano, Hydro Québec TransÉnergie WG B 5 -07: Tech‘s for protection & monitoring transmission lines S. Chano (CA) Finished WG B 5 -23: Protection of composite lines Luc Uyttersprot (BE) 2012 8
AG B 5 -53 Monitoring, metering, recording & overall System Prot. WG B 5 -21: New local P&C approaches to minimise impact of system disturbances A H. Abu Bakar (MY) 2011 WG B 5 -14: WA P & C Technologies V Terzija (UK) 2012 WG B 5 -41: Investigation of possibilities to improve metering systems for billing purposes in substations H. Lenting (NL) 2013 2010 -19 Simon R. Chano, Hydro Québec TransÉnergie 9
NEWLY FORMED WG SC B 5: Four new Working Groups • B 5. 42 Experience concerning availability and reliability of DSAS • B 5. 43 Coordination of protection and control of future network • B 5. 44 Protection Schemes for Special Transformers • B 5. 45 Acceptance, Commissioning and Field Testing Techniques for Protection and Automation 2010 -19 Simon R. Chano, Hydro Québec TransÉnergie 10
PREFERENTIAL SUBJECTS (2011) • PS 1 - IEC 61850: Which tools for which user • PS 2 - Protection of Hybrid Line/Cable Circuits • PS 3 - Performance of Protection Systems Whilst the Network is under Stress 2010 -19 Simon R. Chano, Hydro Québec TransÉnergie 11
PREFERENTIAL SUBJECTS (2012) • PS 1 - Coordination of protection and control for the network of the future • PS 2 - Use of remote access for protection and automation systems-Application and developments 2010 -19 Simon R. Chano, Hydro Québec TransÉnergie 12
TUTORIAL SUBJECT FOR 2011 • MAINTENANCE OF IEC 61850 SYSTEMS 2010 -19 Simon R. Chano, Hydro Québec TransÉnergie 13
Canadian participation-2010 • Leadership roles – Simon Chano (HQ) • B 5 Canadian Representative • B 5 -52 Advisory group convenor • Convenor WG B 5 -07 • B 5 -23 WG member • Corresponding member WG B 5 -19 • Corresponding member B 5 -05 – Gabriel Benmouyal (SEL) • Convenor WG B 5 -04 2010 -19 Simon R. Chano, Hydro Québec TransÉnergie 14
Canadian participation • Leadership roles – Mohindar S. Sachdev (U of Saskatchewan) • Convenor WG B 5 -05 • Member WG B 5 -07 – Brian Sparling • Corresponding Member WG B 5 -05 2010 -19 Simon R. Chano, Hydro Québec TransÉnergie 15
Canadian participation • Bogdan Kasztenny (SEL Inc. ) • Member WG B 5 -12 – John Ciufo ( Hydro One) • Member WG B 5 -14 – Ioni T. Fernando (Manitoba Hydro) • Member WG B 5 -25 – F Rahmatian (Quanta Technology Canada ULC) • Member WG B 5 -40 – S Tang (BC Hydro) • Member WG B 5 -41 2010 -19 Simon R. Chano, Hydro Québec TransÉnergie 16
Concluding Remarks • Study committee actively examines protection and automation issues • Discusses the issues and provides reports on those issues • Promotes power engineering education • Conducts tutorials at the SC meetings • B 5 tries to get participation from utility engineers, consultants and academia 2010 -19 Simon R. Chano, Hydro Québec TransÉnergie 17
Web site • SC address : web site is http: //www. cigre-b 5. org • Pour information additionnelle /For additional information, me contacter / you can contact me: Chano. simon@hydro. qc. ca 2010 -19 Simon R. Chano, Hydro Québec TransÉnergie 18