SC B 5 – Protection and Automation Presidente: G. J. Amantegui (SP) Segretario: Iony Patriota (BR) Scopo … ê facilitate and promote the progress of engineering and the international To exchange of information and knowledge concerning principles, design, applications, coordination, performance and asset management of System Protection, Substation Control and Automation, Remote Control Systems and Equipment, Metering Systems and Equipment. Membership Ø Ø Ø 24 membri regolari 13 membri osservatori Membro italiano: G. Vianello (giuseppe. vianello@terna. it) SC website: www. cigre-b 5. org Milano 25 -11 -2008, Riunione CNI
SC B 5 – Risultati principali della Conferenza ü Impact of IEC 61850 -9 -2 process bus on protection and substation automation systems (39 contributi) - discussi i problemi: accesso al sistema per le prove, concetto di prova, interoperabilità ancora un obiettivo - implementazione ancora a livello di sviluppo, non di realizzazione ü Life Cycle Management of Protection and Control Systems (48 contributi) - Tendenze: ruolo sempre più spinto del software e quindi virtualizzazione e distribuzione di IED; standardizzazione hardware - Necessità : Strumenti per la gestione di modelli, versioni e configurazioni; per la personalizzazione da parte degli utenti (specificazione e prove); per l’accesso remoto (security) Milano 25 -11 -2008, Riunione CNI
SC B 5 – Advisory Groups attivi Type Number Title Name of Conv. Cr. AG B 5. 51 Substation Automation & Remote Control J. Ordacgi (BR) 2007 /8 AG B 5. 52 Protection & Monitoring of Main Plant & Circuits S. Chano (CA) 2007 /8 AG B 5. 53 Monitoring, metering, recording & R. Adams (UK) 2007 Overall System Protection /8 Milano 25 -11 -2008, Riunione CNI Disb.
SC B 5 - Working Groups attivi Type Number Title WG B 5. 04 Modern Techniques for Protecting and Monitoring Generating Plants G. Benmouyal (CA) 2005 2008 WG B 5. 05 Modern Techniques for the Protecting, Monitoring and Control of Power Transformers M. S. Sachdev (CA) 2001 2009 WG B 5. 06 Maintenance Strategies for Digital V. Leitloff (F) Substation Automation Systems 2008 2010 WG B 5. 07 Modern Techniques for Protecting and Monitoring of Transmission Lines S. Chano (CA) 2006 2009 WG B 5. 08 Refurbishment Strategies based on (Total) Cost of Ownership, Operational Risk and Technical Constrains P. Leushuis (NL) 2005 2008 Milano 25 -11 -2008, Riunione CNI Name of Conv. Cr. Disb.
SC B 5 - Working Groups attivi Type Number Title WG B 5. 10 Protection, monitoring and control of series compensated networks J. Zakonjsek (SE) 2002 2008 WG B 5. 12 Engineering Guidelines for IEC 61850 Based Substation Automation Systems J. Castellanos (ES) 2007 2009 WG B 5. 14 Wide Area Protection and Control Technologies V. Terzija (UK) 2008 2010 WG B 5. 15 Distance Protection Functions for Modern Applications D. Tziouvaras (US) 2000 2008 WG B 5. 16 Modern Techniques for Protecting Busbars in HV Networks Z. Gajić (SE) 2004 2008 WG B 5. 19 Protection Relay Coordination H. Kameda (JP) 2004 2008 Milano 25 -11 -2008, Riunione CNI Name of Conv. Cr. Disb.
SC B 5 - Working Groups attivi Type Number Title WG B 5. 20 New Trends for Automated Fault and Disturbance Analysis M. Kezunovic (US) 2005 2008 WG B 5. 21 New Local Protection & Control Approaches To Minimise The Impact Of System Disturbances A. H. Abu Bakar (MY) 2005 2010 WG B 5. 31 Lifetime management of relay settings P. Crossley (UK) 2006 2010 WG B 5. 32 Functional Testing of IEC 61850 Based Systems I. Patriota (ES) 2007 2008 WG B 5. 34 The Impact of Renewable Energy Sources and Distributed Generation on Substation Protection and Automation J. A. González (ES) 2006 2009 Milano 25 -11 -2008, Riunione CNI Name of Conv. Cr. Disb.
SC B 5 - Working Groups attivi Type Number Title WG B 5. 36 Application for Protection Scheme Based on IEC 61850 D. Tholomier (FR) 2006 2009 WG B 5. 37 Protection, Monitoring Control of Shunt Reactors and P. Naisani (CA) 2007 2010 WG B 5. 38 The Impact of Implementing Security Requirements using IEC 61850 D. Holstein (US) 2007 2009 WG B 5. 94 High Impedance Faults I. Ojanguren(ES) 2005 2008 Milano 25 -11 -2008, Riunione CNI Name of Conv. Cr. Disb.
SC B 5 - Working Groups attivi Milano 25 -11 -2008, Riunione CNI
SC B 5 - Nuove attività e futuri W. Groups Sono stati decisi i seguenti nuovi W. G. : • “Impact of HVDC on Protection & Control”’ (JWG (SC B 5/B 4) Proposta una partecipazione italiana (corrispondente) • “Protection of hybrid line/cable circuits in transmission networks” • ‘‘JWG (B 5/D 2) Application Guide on digital inter-S/S comm. s for protection’’ (JWG (SC B 5/B 4) Proposta una partecipazione italiana (membro regolare) • “Protection requirements on transient response of voltage and current digital acquisition chain’’ Proposta una partecipazione italiana (corrispondente) • “Standardised protection schemes’’ Occorre individuare i nominativi dei due membri corrispondenti. Milano 25 -11 -2008, Riunione CNI
SC B 5 - Prossimi meetings Ø Jeju Island, Korea, colloquium 2009, 19 -23 Oct Ø P. S. : Ø Ø Ø Protection & Control of FACT devices and impact on Protection Systems Wide Area Monitoring, Control & Protection Technologies PS 1 - Strategies for the Lifetime Maintenance of SAS Systems Ø Synopses: entro Feb 2009 Ø Full papers: entro Giu 2009 Ø Tutorial Topic: Experience in the protection of multi-circuit & multiterminal lines and power transformers Milano 25 -11 -2008, Riunione CNI
Notizie aggiuntive del regular meeting Ø JWC B 5/D 2 – E’ stata proposta una common session (Parigi 2010) sul tema ‘’Practical implementation of IEC 61850 in electric power systems” Ø Advantages for implementation outside the substation Ø Impact on Substation Automation (security, Wi. Fi, teleprotection requirements) Ø Architecture and Information Technology aspects between Substation Automation and Remote Communication Ø Communication needs for System Protection Schemes an Wide Area Measurements Milano 25 -11 -2008, Riunione CNI
SC B 5 -Soggetti preferenziali per la Sessione 2010 APPROVATI • Protection Control & Monitoring Beyond 2015 - allocation of P&C funcs– architecture of SAS - new concepts -new requirements –recording • Impact of renewable energy sources and new generation on protection and automation of substations (WG 34) – controlled islanding – impact on WAP & SIPS connection protection -IEC 61850 on generator protection – restoration policies – distribution protection Milano 25 -11 -2008, Riunione CNI