RIGHTS OF ENGINEERS
What is whistleblowing?
6. 4. 1 Types of whistleblowing
Acknowledged whistleblowing
6. 4. 2 When should whistleblowing be attempt?
WHEN SHOULD WHISTLEBLOWING ONLY BE ATTEMPTED ? (CONDITIONS)
Publicity:
How Do You Stop This Type Of Damage ?
Four Steps To Solve Whistleblowing:
Four Steps To Solve Whistleblowing:
* When the roofing subcontractor reported this in writing, he was told the sagging was to be expected.
Vandivier become aware that some of the test result had been rigged to meet the Air Force’s specifications. Vandivier was concerned about the safety of the brake and wondered What his legal responsibility might be. He was cooperate with Lawson, and they contacted with FBI.
The Therac-25 was a radiation therapy machine produced by the atomic energy commission Ltd, a Canadian company. The Terac-25 was a dual-mode linear accelerator design to deliver X-ray photons at 25 Me. V , or electrons over a rage of energies.
The accident involving the Therac-25 data back to the months between 19851987 s. Comprising at least six known event of improper dosing of patients. The six accident involved overdosing of patients receiving radiation therapy for various types of cancer.
The prescribed treatment was to be 180 rads of 2 Me. V electrons over a 10 * 17 cm area of his upper back. As the treatment was started, the machine shutdown, giving the operator error code labeled “Malfunction 54”. The meaning of this code was not identified in the manual that came with the machine.
The machine also showed a “Treatment Pause” and an under dose, indicating that only about 3% of the requested does hag been delivered. Thinking that the treatment was incomplete, the operator told the machine to proceed, but it immediately shutdown again, because the video monitor was not working.