Practical Measures to Tackle Climate Chaos David Somervell, Energy & Sustainability Manager University of Edinburgh – Estates & Buildings Department 13 Infirmary Street, Edinburgh EH 1 1 LT Tel 0131 650 2073 http: //www. eso. ed. ac. uk David. Somervell@ed. ac. uk
Universities and Colleges 1. Crisis? What Crisis? [It is for real] 2. How will this affect our institution? 3. Developing a Strategic Approach 4. Invest now in Utilities Infrastructure 5. Decentralised Energy on Campus
Facts & Trends IPCC Scenarios °C 6 - 14 2050 6 -7 Gt. C reduction 12 10 5 - Global Carbon Emissions, Gt. C BAU Pathways to 2050 550 ppm 4 Facts & Trends 9 Gt. C world 8 3 WRE 1000 (IPCC) WRE 550 (IPCC) WRE 450 (IPCC) 1000 ppm Further rises to 2300 16 450 ppm 6 24 13 1 - 2 2025 1. 3 Gt. C reduction 11 1990 2000 2010 2020 2030 9 7 2000 2010 2020 2030 2040 2050 2100 range By 2050 we must cut CO 2 emissions by 7 Gt. C with a 1. 3 Gt. C cut by 2025, against projected ‘Business as Usual’. Global Carbon Emissions, Gt. C Projections & Required Reductions
Extreme droughts will plague sub-Saharan Africa. Children stand behind one of thousands of livestock that died from thirst in southern Ethiopia. [REUTERS March 2006]
What’s needed? 1. Interested, Enthusiastic People 2. Senior Management Support 3. Allocation of Resources (Money) PLUS … Some Measure of Luck / Timing!
George Sq 1. 6 MWe CHP Pollock Halls 526 k. We CHP King’s Bldgs 2. 7 MWe CHP … invested £ 12 million in Decentralised Energy / CHP 2002 -2005 Edinburgh: “University in the City”
Edinburgh’s 3 CHP Projects 1. Pollock Halls: 526 k. We engine serving student residences as lead boiler – 2003 2. The King’s Buildings: 2. 7 MWe engine displaced old steam system + 2 new 7. 5 MW LTHW boilers serving high base load – 2004 3. George Square: 1. 6 MWe engine again replaced steam system – plus 75 tonne Heat Store and 600 k. W Absorption Chiller to even out load – 2005
UK Energy Flows – 50% wasted
Combined Heat and Power
George Sq: Trigeneration
George Square Energy Centre
George Sq buildings now linked:
First remove old steam boilers…
1. 6 MWe Alternator bolts on
High Efficiency, Low NOx Boiler
75 cubic metre Thermal Store
• GE Jenbacher 612 Engine 12 cylinder Jenbacher Engine
600 k. W Absorption Chiller
Thanks to our CHP Partners • Energy Saving Trust – for funding support • PB Power – for Scheme Design • Crown House Technologies – Main Contractor • Estates & Bldgs Works Div’n – implementation • Clarke Energy – Jenbacher Maintenance www. eso. ed. ac. uk
Rankine Engineering Building
Building Integrated Photo. Voltaics
Why we have done this …? • Save money long-term • Invest in infrastructure • Annual Carbon savings • Leadership role
…because there is only 1 planet