PORTUGAL GREENHILLS PORTUGAL LDA The Application of New Mineral Processing Technologies for the Improved Recovery of Refractory Gold in Portugal PETER SULLIVAN OPERATIONS DIRECTOR PDAC CONVENTION 2011 TORONTO, 7 th March 2011
Company Relationships MAELGWYN MINERAL SERVICES UK MAELGWYN MINERAL SERVICES AFRICA GREENHILLS TECHNOLOGIES INTERNATIONAL MAELGWYN MINERAL SERVICES AUSTRALIA : AGENTS IN GERMANY, PORTUGAL CHILE, RUSSIA, GREENHILLS PORTUGAL LTD
Greenhills Portugal LTD Greenhills Portugal Limited • Greenhills Portugal is strategically involved in the Gralheira concession licence application • To install and operate the advanced proprietary gold extraction and cyanide destruction technologies of associated company Maelgwyn Mineral Services Ltd (MMS).
TM Greenhills Portugal LTD The Leachox Process is the integration of “in house knowledge” plus a range of established and innovative unit process steps HPGR investigations Imhoflotation Ultra-fine grinding of the flotation concentrate Partial oxidation of sulphides Leaching in a leach column to replace conventional open to atmosphere leach tanks. Low cost cyanide destruction process Safe handling of concentrate tails
Greenhills Portugal LTD Ore Milling • Investigating the potential of High Pressure Grinding Rolls for ore preparation • Initial findings indicate greatly reduced Energy Requirements (up to 60% reduction)
Aachen Reactor TM
FLOTATION Imhoflot G-Cell TM Aachen reactor Aerated slurry Distributor Concentrate Tailings
Greenhills Portugal LTD MMS IMHOFLOT TM FLOTATION • Shorter residence times than conventional flotation • Requires a smaller “footprint” in plant design • Reduces capex and opex significantly • No moving parts • Lower energy requirement as there is no rotor/stator required to keep the pulp in suspension
Imhoflot G-cell –Cleaning a gold pyrite/arsenopyrite ore TM
Greenhills Portugal LTD Leachox TM • Intensive oxygenation to oxidize cyanide consuming species: reduces cyanide consumption and enhances leach kinetics • Leach columns can result in significant reductions in residence times for refractory gold ores
Leachox Process: Columns and Aachen reactors TM TM
Aachen Reactors TM
Greenhills Portugal LTD Cyanide Destruction Economically reduce WAD cyanide levels to comply with the most rigorous emission limits
Greenhills Portugal LTD Concentrate Tails Handling Contubes safely store and dewater concentrate tails, creating a dry product for reuse or safe disposal TM Arsenic left in a stable form
Contubes TM Safe Storage of Concentrate Tails
Greenhills Portugal Ltd Background of the Gralheira-Jales deposits • The Jales mine produced 830, 000 ounces of gold and almost 3, 000 ounces of silver during its 50 year life, mostly from high grade shoots. Gold grades averaged about 12. 9 g/t Au. The mine was developed only to depth of 600 meters. At the time of closing there were several blocks of mineralisation developed and ready for mining. • The Company believes the Gralheira deposit also contains equivalent or similar conditions.
Greenhills Portugal Ltd Highlights of the Jales - Gralheira Property • Concession includes the past producing Jales Mine covering 5. 2 km² • Environmental base line studies complete. • NI 43 -101 Resource Calculation shows all category resource at 3. 0 g/t cut off in excess of 240, 000 ounces gold (900, 000 oz silver) to a depth of 300 m. • Government support, positive local interest. • Competent mining conditions • Geophysics shows the “structure” reaches 1, 200 meters in depth. • Deepest drill hole 520 meters below surface intersects the vein structure.
Greenhills Portugal LTD Highlights of the Jales - Gralheira Property Metallurgical studies indicate 90% gold dore recovery possible for the refractory ore utilising advanced state processing (gravity, pneumatic flotation, Leachox , CN-D ). TM TM Arsenic component left in stable form and separated from main tailings. Possibility to be placed in backfill in the stopes.
TECHNOLOGIES INTERNATIONAL LTD Greenhills PLANS FOR 2011 Gralheira - Jales • Expand the dimensions of the identified “high grade shoots” to depth and western extension. • Full Mining Licence Application in first quarter 2011. • Confirm metallurgical and environmental testwork in progress to confirm design critiera of Leachox™ process and MMS CN-D™ cyanide destruction process (April 2011). • Feasibility study including detailed engineering to be complete by May 2011. • Decision for mine development expected end 2011.
PORTUGAL GREENHILLS PORTUGAL LDA www. maelgwyn. com Psullivan @gtiprocess. com PETER SULLIVAN OPERATIONS DIRECTOR PDAC CONVENTION 2011 TORONTO, 7 th March 2011