Скачать презентацию Point Engineering Limited Corporate Profile A Mark of Скачать презентацию Point Engineering Limited Corporate Profile A Mark of

51d4d1c972237b9fed017a14fd3beec9.ppt

  • Количество слайдов: 64

Point Engineering Limited Corporate Profile A Mark of great impact 1 www. pointengineering. com Point Engineering Limited Corporate Profile A Mark of great impact 1 www. pointengineering. com

Point Engineering Limited CONTENTS v. COMPANY CONTACT ADDRESSES v. COMPANY OVERVIEW v. CORPORATE MISSION Point Engineering Limited CONTENTS v. COMPANY CONTACT ADDRESSES v. COMPANY OVERVIEW v. CORPORATE MISSION & VISION STATEMENTS v. CORPORATE STRUCTURE & AFFILIATIONS v. SCOPE OF ENGINEERING SERVICES v. CASHES POLICY v. QUALITY POLICY v. ULTRAMODERN OFFICE FACILITIES v. PROJECT EXPERIENCES A Mark of great impact 2 www. pointengineering. com

Point Engineering Limited COMPANY CONTACT ADDRESSES Point Engineering Limited (PEL)’s head office is located Point Engineering Limited COMPANY CONTACT ADDRESSES Point Engineering Limited (PEL)’s head office is located in Port Harcourt, Rivers State with Liaison Offices in Lagos and Eket, Akwa-Ibom State. Main Office: Point Engineering Limited FONTE House, 1 Temple Ejekwu Close Behind Texaco Filling Station First Artillery, Port Harcourt Rivers State P. O. BOX, 13595 Port Harcourt Tel: 234 – 84 - 611963 Fax: 234 – 84 - 612008 E-mail: Info@pointengineering. com Website: www. pointengineering. com Lagos Address: Eket Address: Point Engineering Limited 2 nd Floor, NIM Building Plot 22, Idowu Taylor Street, Victoria Island Lagos Tel: 234 – 1 – 5558602, 2626635, 2626636 Fax: 234 – 1 – 5558602 E-mail: Info@pointengineering. com Website: www. pointengineering. com Point Engineering Limited Block 3, Usua Amanam Estate Eket – Oron Road, Eket, Akwa-Ibom State Tel: 234 – 8023469400 Fax: 234 – 84 - 612008 E-mail: Info@pointengineering. com Website: www. pointengineering. com A Mark of great impact 3 www. pointengineering. com

Point Engineering Limited COMPANY OVERVIEW Point Engineering Limited (PEL) is an independent and wholly Point Engineering Limited COMPANY OVERVIEW Point Engineering Limited (PEL) is an independent and wholly (100%) indigenous engineering consultancy company dedicated to providing responsive high quality and cost-effective services to clients, who are mainly in the oil and gas production, gas processing and oil refining industries. Point Engineering Limited was formed in 1995, started business in 1997 and active operations in 2000 with a dedicated team of mechanical, process, civil/structural, instrumentation and electrical engineers. Since then, the company has evolved into a full multi-disciplinary consultancy group working on contracts varying in size from individual assignments to over 20, 000 man-hours. Our philosophy is to provide innovative, cost effective solutions, on time, within budget and develop a relationship with our clients for mutual respect, whereby our professional approach places us first on the list when considering new tasks or technologies. We undertake a wide range of Engineering and Project management tasks for oil exploration and production facilities, gas production and processing facilities, separation, liquefaction and oil refining. Projects executed include study, analysis, engineering (front-end and detailed), procurement assistance and project management services. We have worked and can still work under a number of contractual arrangements including Reimbursable, Target Price, Lump Sum, Service and Frame Contracts depending on the nature of the project assignment and clients’ preference. Our approach is always flexible and whilst we prefer to be contracted directly with the main client, in order to achieve the clients’ goal, we do engage in sub-contract and/or consortium arrangements in order to draw synergy together in meeting clients’ requirements. A Mark of great impact 4 www. pointengineering. com

Point Engineering Limited CORPORATE MISSION & VISION STATEMENTS OUR VISION IS: To be a Point Engineering Limited CORPORATE MISSION & VISION STATEMENTS OUR VISION IS: To be a reference POINT in turning Engineering Concepts into Reality in the Nigerian Oil and Gas Sector. OUR MISSION IS: To prove a POINT for indigenous participation in the Nigerian Oil and Gas Sector by providing complete; quality assured engineering services capable of satisfying the most stringent requirements of our clients wherever it is required using the best available technical skills. A Mark of great impact 5 www. pointengineering. com

Point Engineering Limited CORPORATE STRUCTURE & AFFILIATION A Mark of great impact 6 www. Point Engineering Limited CORPORATE STRUCTURE & AFFILIATION A Mark of great impact 6 www. pointengineering. com

Point Engineering Limited Our Corporate Structure is as follows: BOARD OF DIRECTORS MANAGING DIRECTOR Point Engineering Limited Our Corporate Structure is as follows: BOARD OF DIRECTORS MANAGING DIRECTOR CORPORATE AUDITORS QUALITY SYSTEM MANAGER CORPORATE ADMINISTRATION MANAGER FRONT-END ENGINEERING MANAGER ELECTRICAL ENGINEERS A Mark of great impact SAFETY MANAGER ENGINEERING MANAGER CORPORATE FINANCE MANAGER DETAIL/FACILITY ENGINEERING MANAGER PROCESS ENGINEERS PROCESS TECHNOLOGY HYDRAULIC DESIGN ENGINEERS CIVIL / STRUCTURAL ENGINEERS COMPANY SECRETARY PROJECT SERVICES MANAGER COST PLANNING/ ESTIMATE SCHEDULING ENGINEERS INSTRUMENTATION ENGINEERS 7 POINT ENGINEERING’s FOREIGN PARTNERS MECHANICAL ENGINEERS www. pointengineering. com PROPOSALS/ CONTRACTS ENGINEERS PIPING / PIPELINE ENGINEERS

Point Engineering Limited AFFILIATES: In order to pull synergy for effective execution of projects Point Engineering Limited AFFILIATES: In order to pull synergy for effective execution of projects in the Nigerian Oil and Gas Industry, Point Engineering has enter into strategic technical alliances with the following companies: §Berwanger Inc. , of 4615 Southwest Freeway, Suite 900, Houston, Texas, USA §MSL Services Corporation, of 11111 Katy Freeway, Suite 620, Houston, Texas 77079, USA §Foster Wheeler (Nigeria) Limited, 12 A (Plot 296 B), Akin Olugbade street, Victoria Island, Lagos A Mark of great impact 8 www. pointengineering. com

Point Engineering Limited SCOPE OF ENGINEERING SERVICES We have the capability to handle projects Point Engineering Limited SCOPE OF ENGINEERING SERVICES We have the capability to handle projects from initial feasibility phase right through to design, implementation and commissioning. Also, we can provide assistance at a particular stage of the project cycle according to clients’ requirements. We undertake various kinds of projects which are categorized as follows: Process / Front-End Engineering Detailed Engineering Design Project Management / Consultancy Services • Field Development Studies • Mechanical / Piping Design & Isometrics • Plant Technical Appraisal / Audit. • Feasibility & Concept Selection Studies • Corrosion Prevention & Cathodic Protection Design. • Software Development / Training. • Debottlenecking, Upgrade / Revamp Studies. • Design of Electrical Systems. • Economic Studies. • Pipeline Hydraulic Studies. • Detailed Instrumentation Design. (OPEN SYSTEM ARCHITECTURE DESIGN) • Flow Assurance & Riser Analysis. • Pipeline Mechanical Design. • Complete Basic Engineering / FEED Packages. • As-built Drawings. A Mark of great impact • Design & Safety Reviews (HAZOP, HAZID, FIREPRAN, etc. ) • Operational Assistance / Support. • Discipline Support to EPC Projects. 9 • Design Verification / Audit. • Multi-disciplined Project Management. • Technical Support www. pointengineering. com

Point Engineering Limited CASHES POLICY The management of Point Engineering Limited is totally committed Point Engineering Limited CASHES POLICY The management of Point Engineering Limited is totally committed to the following Community Affairs, Safety, Health, Environment and Security (CASHES) Policy: • to take all reasonable measures to make personnel, information and facilities secure; minimize the effect of any operation to the host community, minimize injuries at the workplace and minimize environmental damage. • to be sensitive to the needs and concerns of all host communities. • to establish and maintain standards for community affairs, safety, health, the environment and security within the Company which adhere to all relevant aspects of applicable laws and meet the high standards applicable to the industry. • to ensure that all Company personnel are given the necessary information, instruction and training to enable them to work in a secure and safe manner so that they understand can fulfill their responsibilities with regard to Community Affairs, Safety, Health, Environmental and Security requirements. • to ensure that safety is an integral part of all the work performed by the Company. A Mark of great impact 10 www. pointengineering. com

Point Engineering Limited QUALITY POLICY The management of Point Engineering Limited is totally committed Point Engineering Limited QUALITY POLICY The management of Point Engineering Limited is totally committed to the following Quality Policy and Objectives: • • to achieve a quality service by meeting customers’ requirements. to define and document the Quality System for all functions of the company to comply with the requirements of ISO 9001 latest edition. to develop and use qualified personnel, trained with the necessary skills and experience to perform their duties. to perform in accordance with the documented Quality System with the aim of developing all products and services correctly the first time. to ensure that services and products provided by Point Engineering are in accordance with the contract, safety and legislative requirements. to ensure that quality activities are specified to suppliers to maintain the overall level of quality of the project. to continually evaluate the Quality System’s suitability and monitor its operation to improve its effectiveness. A Mark of great impact 11 www. pointengineering. com

Point Engineering Limited ULTRA MODERN FACILITIES OFFICE STRUCTURE: Point Engineering Limited currently operates and Point Engineering Limited ULTRA MODERN FACILITIES OFFICE STRUCTURE: Point Engineering Limited currently operates and executes projects in an ultramodern office in the central city of Niger Delta region, Port Harcourt, Rivers State. This office, which is the head office is conveniently located along the Port Harcourt – Aba Express Road. PEL also operates in a well-equipped branch office at Eket, Akwa-Ibom State, and Victoria Island, Lagos, mainly for Mobil, projects. We currently occupy about 600 m 2 of space at FONTE House (1 st & 2 nd floors), Port Harcourt and 200 m 2 of space at the Usua Amanam Estate (Block 3), Eket. The offices are fully furnished and equipped with state-of-the-art facilities including complete communication systems, computer software and hardware facilities with a Local Area Computer Network system. The offices (Head and Branch) are provided with a standby 40 KVA and 27 KVA power generator sets respectively, to power the office facilities whenever there is power supply failure from NEPA. We also have four brand new executive cars and available for use as official/pool cars. A Mark of great impact 12 www. pointengineering. com

Point Engineering Limited The following Tables summarize various categories of our office facilities: A Point Engineering Limited The following Tables summarize various categories of our office facilities: A Mark of great impact 13 www. pointengineering. com

Point Engineering Limited A Mark of great impact 14 www. pointengineering. com Point Engineering Limited A Mark of great impact 14 www. pointengineering. com

Point Engineering Limited A Mark of great impact 15 www. pointengineering. com Point Engineering Limited A Mark of great impact 15 www. pointengineering. com

Point Engineering Limited PEL’s COMPUTER FACILITIES - SOFTWARE CONT’D A Mark of great impact Point Engineering Limited PEL’s COMPUTER FACILITIES - SOFTWARE CONT’D A Mark of great impact 16 www. pointengineering. com

Point Engineering Limited E-Mail Facilities: info@pointengineering. com Website: www. pointengineering. com Engineering Library: Comprises Point Engineering Limited E-Mail Facilities: info@pointengineering. com Website: www. pointengineering. com Engineering Library: Comprises of: Professional Textbooks and Journals Engineering Standards and Codes - API, DEP’s, etc. Regulatory Guidelines - DPR, FEPA, etc. QA/QC Procedures & Training Manuals, etc. Sample Project Deliverables Others/Miscellaneous: 40 KVA Perkins Power Generating Set 27 KVA Perkins Power Generating Set 15 Qty of 2 HP Air conditioners 10 Qty of 1 HP Air conditioners Computer Network System A Mark of great impact 17 www. pointengineering. com

Point Engineering Limited PROJECT EXPERIENCE Point Engineering Limited has a proven track record in Point Engineering Limited PROJECT EXPERIENCE Point Engineering Limited has a proven track record in providing qualitative and cost effective engineering and project management services to clients specifications, on schedule and within budget. We have worked on various engineering projects for major oil and gas companies both on / offshore in Nigeria. The following are some major companies we have either worked directly or indirectly (as sub-contractor) for in Nigeria: • Mobil Producing Nigeria Unlimited (both Lagos and Eket Divisions) • Shell Petroleum Development Company (both Western and Eastern Divisions) • Shell Nigeria Gas Limited • Nigeria Agip Oil Company • AMNI International Limited • Daewoo Nigeria Limited • ELF Nigeria Limited • Ozono Nigeria Limted • Oiltest Well Service Limited • ENERCO Nigeria Limited The table overleaf provides a list of some projects successfully executed by Point Engineering Limited. A Mark of great impact 18 www. pointengineering. com

Point Engineering Limited The sheets attached overleaf contain brief description of some of the Point Engineering Limited The sheets attached overleaf contain brief description of some of the key projects previously executed by Point Engineering Limited: A Mark of great impact 19 www. pointengineering. com

Point Engineering Limited The Etim field is located offshore Akwa Ibom State, Nigeria in Point Engineering Limited The Etim field is located offshore Akwa Ibom State, Nigeria in the OML 67 area of the Bight of Biafra. It is south of Company's, Qua Iboe Terminal (QIT) shore base. Water depths range from 100 - 120 ft MLW. Etim D is a wellhead platform installed by MPN in its OML 67. It is planned that production from Etim D wells will be transported through a 14” Full Well Stream pipeline to the Etim Production Platform (Etim PP) for primary separation. The Etim D production stream will thus co-mingle with other production streams (Etim A and B) at Etim PP upstream of the production separator. Etim PP Top Sides and Tie-in Study for Pig Receiver Client Name: MPN, Lagos Location: Etim Offshore Platform Date: Sept. 2004 – January 2005 Contract Type: Reimbusable, Basic Engineering The project objective is to: Develop "Issue for Design" (IFD) quality drawings, calculations, analyses, studies, and reports for the topsides piping, deck extension to accommodate 14” receiver, and riser location at Etim PP for the 14" Etim D to Etim PP full well stream pipeline. Consider the FEED for some other projects (EAPM LP FEED) previously completed that affect Etim PP and develop the design to be compatible with the planned modifications. Client Contact: Deepesh Kaushish Deepesh. kaushish@exxonmobil. com A Mark of great impact 20 www. pointengineering. com

Point Engineering Limited The SPDC Server Consolidation & Upgrade as well as the Enterprise Point Engineering Limited The SPDC Server Consolidation & Upgrade as well as the Enterprise Storage Systems (ESS) projects were initiated to provide hosting for SPDC applications and databases, while reducing the total cost of ownership of the server & storage infrastructure. These projects are introducing new high-end servers and storage devices that need to be hosted within the P-Harcourt data center. The resultant load requirements for these high-end servers and storage infrastructures cannot be accommodated by the existing utilities Detailed Design of Electrical Utilities for Port Harcourt Data Center configuration. The work involves capacity check of the existing power system in order to ascertain its adequacy to meet the additional load requirement of the proposed power network, carry out detailed design of a reliable system that will efficiently accommodate the required loads with reasonable level of spare capacity, identify the best tie-in points and propose a modification that would minimize shut down time for the operating loads before hook up to the new system. Client Name: SPDC, Eastern Division Location: Shell IA, Port Harcourt Date: October 2004 – February 2005 Contract Type: Lumpsum, Detail Engineering Client Contact: Ali Mastrouk Ali. mastrouk@shell. com A Mark of great impact 21 www. pointengineering. com

Point Engineering Limited Detailed Design for Extension Work for BRT Diesel Refill System This Point Engineering Limited Detailed Design for Extension Work for BRT Diesel Refill System This is a follow up to the basic engineering earlier carried out for MPN in 2002 by Point Engineering. This scope of the project is the provision of detailed engineering design for the replacement / relocation of BRT Diesel re-fill piping and accessories from the small Boat Dock to the products Loading Dock. The work entails piping modifications, and civil/structural designs. Client Name: MPN Lagos Location: Bonny Point Engineering Limited carried out necessary piping hydraulics, civil/structural, designs that will enable the replacement / relocation of BRT Diesel re-fill piping and accessories from the small Boat Dock to the products Loading Dock River Terminal Date: Dec. 2004 – February 2005 Contract Type: Reimbursable, Detail Engineering Client Contact: Deepesh Kaushish Deepesh. kaushish@exxonmobil. com A Mark of great impact 22 www. pointengineering. com

Point Engineering Limited The objective of this detailed engineering is for the restoration of Point Engineering Limited The objective of this detailed engineering is for the restoration of the Glycol Dehydration Unit (GDU), located on Edop Production Platform offshore Eket, to its original design intent and in compliance with MPN Master Specification, DIM and industry standards where practical. Detailed Engineering Design for Edop TEG Restoration MPN contracted Point Engineering Limited (PEL) to carry out the Detailed Design Engineering works necessary for the restoration of the Tri-ethylene Glycol (TEG) Dehydration Unit. The detailed engineering design works performed by PEL reviewed the Edop Glycol Unit Assessment Report of June 2003 in addition to carrying out detailed engineering activities to provide a fit-forpurpose IFC package necessary for obtaining cost and schedule estimates for the Construction Contractor. Client Name: MPN, Lagos Location: Edop Offshore Platform Date: June. 2004 – September 2004 Contract Type: Reimbusable, Detail Engineering Client Contact: Deepesh Kaushish Deepesh. kaushish@exxonmobil. com A Mark of great impact 23 www. pointengineering. com

Point Engineering Limited Edop 12 is a minimum facility, single well, wellhead platform that Point Engineering Limited Edop 12 is a minimum facility, single well, wellhead platform that is supported from the single well conductor. This well produces over 4000 Barrels of crude oil per day, flowing through Edop C which is located in the Gulf of Guinea, Nigeria. The facility has a hexagonal shaped boat landing deck supported from the single conductor at an elevation of 5 ft above Mean Low Sea Level. The platform is also equipped with a 2 Long Ton lifting device and structure to transfer material from boats to the platform, and vise versa. However, the boat landing is fully submerged at the time of the year when the tide is high, thus preventing personnel access to the platform from a boat. Also the 2 Long Ton lifting device, of the well head platform appears marginal and as such not fit for purpose. Point Engineering Limited performed the detailed engineering design for the provision of additional, round the year, functional boat landings at respective levels and the modification of the lifting device to address its inefficiency Detailed Design for Edop 12 C Platform Lifting Device and Boat Landing Upgrade Client Name: MPN, Lagos Location: Edop 12 C Offshore Platform Date: August 2004 – November 2004 Contract Type: Reimbusable, Detail Engineering Client Contact: Deepesh Kaushish Deepesh. kaushish@exxonmobil. com A Mark of great impact 24 www. pointengineering. com

Point Engineering Limited Detailed Design for Oso RG LPA Turbine Replacement Client Name: MPN, Point Engineering Limited Detailed Design for Oso RG LPA Turbine Replacement Client Name: MPN, Lagos Location: Oso Offshore Platform Date: August 2004 – December 2004 Contract Type: Reimbusable, Detail Engineering In respect of the fire incident that occurred in April, 2003 on the OSO Gas Compression (RG) Platform main deck in which the LPA Turbine Package located on the south end of Oso RG Platform was damaged, MPN issued a work order to PEL to carryout detailed engineering design for the replacement of this damaged turbine package with an identical unit. The replacement of this LPA Turbine Package involve various work activities which were segregated into seven (7) workpacks as presented below: • Installation of new shutdown valve • Rerouting of start gas exhaust • Installation of seal leakage drain • Repair or replacement of damaged valves and piping • Piping demolition and reinstallation for skid replacement • Repair of exhaust duct insulation • Inspection and cleaning of equipment and piping The detailed design was successfully carried out on time and within budget. Client Contact: Mike Attah Michael. e. attah@exxonmobil. com A Mark of great impact 25 www. pointengineering. com

Point Engineering Limited The objective of the detailed engineering phase of the Oso Flare Point Engineering Limited The objective of the detailed engineering phase of the Oso Flare Segregation project is to provide a fit-for-purpose procurement/construction packages that will segregate the existing comined flare system. Detailed Engineering Designs for Oso Flare Segregation Piping and PSVs Modifications The design eliminate risk of back drafting on the flare systems and balanced the relief load of the flare systems to be within the re-rated capacity of 800 Mscf/D by rerouting the blowdown and relief valves from the 4 th and 5 th stage compressors from the RG flare to the RK flare. Some PSV's were also modified to Client Name: MPN, Lagos Location: Oso Offshore Platform Date: March 2004 – August 2004 Contract Type: Reimbursable, Detail Engineering achieve the design intent. Client Contact: Deepesh Kaushish Deepesh. kaushish@exxonmobil. com A Mark of great impact 26 www. pointengineering. com

Point Engineering Limited Escravos Production District is one of the 3 districts in the Point Engineering Limited Escravos Production District is one of the 3 districts in the SPDC-West Northern Swamp Production Area (NSA) with a logistics base located at Escravos Beach. It consists of four Flow-stations namely: Otumara, Saghara, Escravos, and Opuama. The combined production capacity of Escravos District is 180 Mobd of oil, which represents 40% of NSA installed production capacity. There are 8 principal communities in Escravos District. These communities are Ajudiabo, Madangho Ogidigben, Aruton, Ugboegungun, Degele, Opuama and Tsekelewu. SPDC planned to provide power to these host communities in 2 phases with phase 1 being to supply power to the 3 communities around the Escravos Logistic Base i. e. Ajudiabo, Madagho and Ogidigben. Each of the 3 communities identified in phase 1 have their own community distribution network that needs to be upgraded. Detailed Design for Power Generation, Transmission and Distribution to Forcados, Ogidigben, Communities Client Name: SPDC, Western Division Location: Forcados Date: January 2004 – June 2004 Contract Type: Lumpsum, Detail Engineering Point Engineering Limited perform preliminary engineering studies and detailed engineering design necessary for the proposed Escravos Communities Electrification scheme for the Escravos Logistics Base, Madangho, Ogidigben and Ajudiabo communities. Client Contact: Chris Anthony Chris. anthony@shell. com A Mark of great impact 27 www. pointengineering. com

Point Engineering Limited Preparation of Integrated Operating Standards The Integrated Operations Standards and Practices Point Engineering Limited Preparation of Integrated Operating Standards The Integrated Operations Standards and Practices are the Mandatory minimum requirement to control Operational and Maintenance Activities carried out in the Shell System. They provide the basic rules, procedures, work practices and routines when used with the Health, Safety and Environmental Management Systems, to maintain a safe, efficient working environment. The Integrated Operations Standards consist of mandatory Standing Instructions, Operation Instructions, Procedures, recommended Work Practices and Maintenance Job Routines. Client Name: Shell Nigeria Gas Limited Location: Agbara / Ota Date: October 2003 – January 2004 Contract Type: Lumpsum, Engineering Studies The work entails developing the following Standards and Work Practices: Standing Instructions Field Operations Maintenance Job Routines Point Engineering Limited developed the above Standards and Work Practices in line with SNG guidelines. . Client Contact: John Itimi elo. itimi@shell. com A Mark of great impact 28 www. pointengineering. com

Point Engineering Limited Preparation of Operating and Maintenance Manuals Shell Nigeria Gas Limited contracted Point Engineering Limited Preparation of Operating and Maintenance Manuals Shell Nigeria Gas Limited contracted to PEL the task of developing a comprehensive operating and maintenance manual for its Gas Distribution Network at Aba. Point Engineering Limited carried out these activities in line with SNG guidelines. . Client Name: Shell Nigeria Gas Limited Location: Agbara / Ota Date: October 2003 – December 2003 Contract Type: Lumpsum, Engineering Studies Client Contact: Chucks Ahiakwo Chukwuma. ahiakwo@shell. com A Mark of great impact 29 www. pointengineering. com

Point Engineering Limited Oso RG Damage Assessment and Restart Project Piping Works Design and Point Engineering Limited Oso RG Damage Assessment and Restart Project Piping Works Design and Drafting Package On April 29 th 2003, a fire occurred on one of MPN’s platforms, OSO, damaging an isolated portion of the platform structure. Point Engineering carried out the detailed drafting and design on the damaged cooler piping to enable necessary deliverables for procurement and construction Client Name: MPN Lagos Location: Oso Offshore Platform Date: May 2003 – July 2003 Contract Type: Lumpsum, Detail Engineering Client Contact: Tolu Okikiolu Tolulope. o. okikiolu@exxonmobil. com A Mark of great impact 30 www. pointengineering. com

Point Engineering Limited Elf Petroleum Nigeria Limited intends to improve its material recovery process Point Engineering Limited Elf Petroleum Nigeria Limited intends to improve its material recovery process by the Installation and construction of a Material Recovery Facility at Obagi in OML 58. The facility will have capability to segregate waste materials from the Obagi district area office/accommodation, recover useable wastes, incinerate discarded wastes and dispose the residues in an environmental friendly way. The facility will also have a sewage treatment plant for centrally treating human waste, a Guard House with Rest-room, a three-room Office block with male /female Rest-rooms, Overhead Water Tank with associated Borehole Pumps and Supporting Structures, Generator House with the Diesel Storage Tank, Waste Processing Shed, Waste Offloading Shed, Ash Shed and a Gas Bottle Shelter. The works also include the installation of a Waste Incinerator, a Sewage Treatment Facility with associated accessories including Block Wall Fence, Firewater System with Basic Engineering Studies and Design for the Material Recovery Facilities at Obagi Field – OML 58 Client Name: Elf Petroleum Nigeria Limited Location: Obagi Date: May 2003 – December 2003 Contract Type: Lumpsum, Detail Engineering associated hydrants Client Contact: David Fompun David. FOMPUN@total. com A Mark of great impact 31 www. pointengineering. com

Point Engineering Limited Detailed Design for 28” Pipeline Sectional Replacement by Hot Tapping Client Point Engineering Limited Detailed Design for 28” Pipeline Sectional Replacement by Hot Tapping Client Name: Oilserv Limited / SPDC Location: Krakama Date: August 2003 – Septeber 2003 Contract Type: Lumpsum, Detail Engineering This project is necessitated by the recommendation of SPDC-EAST IP report developed in 2001 for the 28” x 17 km NCTL from Krakama manifold to Cawthorne junction manifold. The IP report recommended the sectional replacement of a defective pipe section, about 4 km from Krakama manifold, which has undergone 76% wall loss. In order to carry out the sectional replacement, hot-tapping and stoppling operations are required. This project was awarded to Oilserv Limited who in turn subcontracted the design scope of the job to Point Engineering Limited Client Contact: Austin Uzoka oilserv 2@infoweb. abs. net A Mark of great impact 32 www. pointengineering. com

Point Engineering Limited In 2001, during the cleaning of 14” Okordia. Rumuekpe trunk line Point Engineering Limited In 2001, during the cleaning of 14” Okordia. Rumuekpe trunk line to enable intelligent pigging for integrity data acquisition, it was observed that the cleaning pig was stuck in the trunk line at Sambreiro river crossing as a result of obstruction in the trunk line. Similarly, a dent was revealed during the phase IV internal inspection program for pipelines in 2002 by a caliper survey of the 10” Diebu creek delivery line, approximately 6. 97 km away from a launcher manifold at Diebu creek flowstation. The dent lies within the river crossing section of the pipeline at Ekowe/Nange-ama. In view of this, planned replacement of these pipeline sections in line with SPDC’s standard is required. Detailed Designs for 14” Pipeline Sectional Replacement at Diebu River Crossing and 10” Pipeline Sectional Replacement at Okordia River Crossing The objective of the Design is to produce necessary engineering drawings to enable effective replacement of the dented or obstructed section of the delivery line and trunk line on the Ekowe/Nange-ama and Sambreiro River crossing sections respectively. These replacements will ensure steady flow of crude oil through these pipelines and allow intelligent pigging for data acquisition in line with DPR’s requirements Client Name: SPDC, easter Division Location: Diebu and Okordia Date: March 2003 – August 2003 Contract Type: Lumpsum, Detail Engineering Client Contact: Joe Dim Joe. dim@shell. com A Mark of great impact 33 www. pointengineering. com

Point Engineering Limited Detailed Design for Edop GIP Turbine Vent System Modification Client Name: Point Engineering Limited Detailed Design for Edop GIP Turbine Vent System Modification Client Name: MPN QIT, Eket Location: Edop Offshore Platform Date: May 2003 – July 2003 Contract Type: Reimbursable, Detail Engineering On the backdrop of the turbine blow-out that happened on Oso gas compression platform (RG), MPNU decided to carry out an EIT study on Edop’s Injection Gas Compressors (IGC A/B), to determine the modifications that would be required to forestall such an occurrence on QI. From the EIT recommendations, the following modifications are required: • Segregation of IGC A/B starter gas exhaust lines from existing LP vent header, and routing them to a safe location. • Installation of flame arrestors on new IGC A/B exhaust vent lines. • Installation of shutdown valves (SDV’s) upstream of IGC A/B starter gas control valves to provide automatic cut-off of starter gas supply to the system in the event of starter speed inhibition system failure. • Installation of device such as lube oil flow indicator or a means of confirming lube oil flow after start-up and at any other time. The device is to be installed such that it can be read from outside IGC A/B housing. • Connection of IGC A/B starter pickup speed signal into control room DCS Point Engineering Ltd performed the detailed engineering design to address these concerns raised by the EIT. Client Contact: Jim Morris James. m. morris@exxonmobil. com A Mark of great impact 34 www. pointengineering. com

Point Engineering Limited Detailed Design for Ubit & Ekpe Gas Spiking Project Client Name: Point Engineering Limited Detailed Design for Ubit & Ekpe Gas Spiking Project Client Name: MPN QIT, Eket Location: Ubit & Ekpe Offshore Platform Date: May 2003 – July 2003 Contract Type: Reimbursable, Detail Engineering Client Contact: Jim Morris James. m. morris@exxonmobil. com A Mark of great impact 35 Due to the reduction in MPN QIT’s daily crude production as a result of the reduced OPEC quota, QIT no longer produces enough fuel gas to supply all fuel gas users at the QIT. This has resulted in use of alternative fueling (diesel) of the QIT generators. Field Operations Technical Engineering (FOTE) carried out a conceptual study to evaluate different options with a view of identifying the most economical, effective and efficient way of increasing the fuel gas availability at QIT while still keeping the OPEC oil production quota and thereby reducing or eliminating the diesel usage at QIT. To achieve this, FOTE has identified an option involving a means of increasing the overall QIT GOR while the 1 st stage separator pressure of 30 Psig is being maintained by injecting up to 15 MMscfd of gas into the following Main Oil Lines (MOL): 16” Ekpe-Asabo oil pipeline 24” Ubit-QIT oil pipeline MPN has carried out pipeline hydraulic analysis for these oil lines (with the injected gas) and predicted that the potential of slug flow in the incoming pipeline is not likely. Therefore, PEL’s scope on this project is limited to the detailed design for the piping modifications required on Ubit and Ekpe platforms to enable connection of gas stream from a reasonable source to an appropriate point on the MOL location www. pointengineering. com

Point Engineering Limited A recent EIU SHE risk assessment conducted by MPNU on Inim Point Engineering Limited A recent EIU SHE risk assessment conducted by MPNU on Inim PP identified the present Instrument Gas system as a potential risk – fire hazard. Pneumatic systems continuously bleed off gas that power or pressurize them as part of the pneumatic system operations. Inim PP is a manned production platform and has electric powered equipment that are likely sources of ignition of any gathered gas cloud. For this reason and others highlighted in the EIU SHE risk assessment report, Mobil Producing Nigeria Unlimited embarked on the conversion of the Instrument Gas System to Instrument Air System. Preliminary Design for the Conversion of Inim PP Instrument Gas System to Instrument Air System Client Name: MPN QIT, Eket Location: Inim Offshore Platform Date: April 2003 – June 2003 Contract Type: Reimbursable, Engineering Study PEL carried out this study that considers a number of options for the installation of the proposed Instrument Air System, estimate the instrument air demand, develop equipment specifications, identify required structural modifications and tie-in to existing instrument air header, and develop cost estimates for renting as against outright purchase of compressor units for a period of five years Client Contact: Jim Morris James. m. morris@exxonmobil. com A Mark of great impact 36 www. pointengineering. com

Point Engineering Limited The project is necessitated by the need for MPN to carry Point Engineering Limited The project is necessitated by the need for MPN to carry out the complete replacement of some failed pipe supports on 36” and 48” pipeline headers transferring crude to and from tank 5008 respectively at QIT process area. Detailed Engineering Design for QIT 36” Inlet Header and 48” Outlet Header Supports Upgrade PEL’s scope of work is the provision of detailed engineering design, calculations, documentation and construction drawings to enable construction of an adequate reinforced concrete pipe support for the 36’’ & 48’’ pipelines. Client Name: MPN QIT, Eket Location: QIT, Eket Date: April 2003 – May 2003 Contract Type: Reimbursable, Detail Engineering Detailed soil investigation was carried out at the failed section on the pipelines route. Four new supports were designed to support the expansion loop section of the pipelines. Client Contact: Jim Morris James. m. morris@exxonmobil. com A Mark of great impact 37 www. pointengineering. com

Point Engineering Limited Detailed Design for Usari FB and FC Mezzanine Deck Installation The Point Engineering Limited Detailed Design for Usari FB and FC Mezzanine Deck Installation The scope of the project is the provision of detailed engineering design to enable the fabrication and installation of Mezzanine decks on Usari FB and FC platforms. The work entails the design of an adequate steel structure and grating access platform at both platforms to enable personnel have access to equipment during maintenance Client Name: MPN QIT, Eket Location: Usari Offshore Platform Date: Nov. 2002 – January 2003 Contract Type: Reimbursable, Detail Engineering Client Contact: Jim Morris James. m. morris@exxonmobil. com A Mark of great impact 38 www. pointengineering. com

Point Engineering Limited Preliminary Design for Replacement / Relocation of Diesel Refill System at Point Engineering Limited Preliminary Design for Replacement / Relocation of Diesel Refill System at BRT Mobil Producing Nigeria Unlimited intended to relocate the diesel refilling piping with the associated pumping and metering facilities at their Bonny River Terminal (BRT) from the present small Boat dock location to the product loading dock at the jetty. Client Name: MPN QIT, Eket Location: Bonny Point Engineering Limited (PEL) was engaged to carry out preliminary engineering design for the new piping systems. River Terminal Date: October 2002 – December 2002 Contract Type: Reimbursable, Basic Engineering Client Contact: Jim Morris James. m. morris@exxonmobil. com A Mark of great impact 39 www. pointengineering. com

Point Engineering Limited Detailed Design for Edop QI Atmospheric Vent Re-routing The scope of Point Engineering Limited Detailed Design for Edop QI Atmospheric Vent Re-routing The scope of the project is the provision of detailed engineering design to enable rerouting of the existing Edop vertical atmospheric vent stack to a horizontal stack in a safe location. The work also entails the design of an in-line detonation arrestor on the new stack and the resetting of the existing CO 2 automatic flooding system to be able to sense early fire. Client Name: MPN QIT, Eket Location: Edop Point Engineering Limited will carried out the necessary process and piping design that enable the above design intent to be achieved. Offshore Platform Date: Nov. 2002 – December 2002 Contract Type: Reimbursable, Detail Engineering Client Contact: Jim Morris James. m. morris@exxonmobil. com A Mark of great impact 40 www. pointengineering. com

Point Engineering Limited Inim PP Vent Gas Relief Header Modifications Detail Design The work Point Engineering Limited Inim PP Vent Gas Relief Header Modifications Detail Design The work entails the provision of engineering design services to generate all necessary detailed drawings and documentations required to carry out structural and piping works for installation of a temporary maintenance relief vent line at Inim Platform. Client Name: MPN QIT, Eket Location: Inim Offshore Platform Date: October 2002 – November 2002 Contract Type: Reimbursable, Detail Engineering Client Contact: Jim Morris James. m. morris@exxonmobil. com A Mark of great impact 41 www. pointengineering. com

Point Engineering Limited The work entails the provision of engineering design services to generate Point Engineering Limited The work entails the provision of engineering design services to generate all necessary detailed drawings/documentions required to carry out structural, piping, electrical and equipment installation works for upgrading the existing 3 tons hoist system to 5 tons hoist system. Detailed Design for Ubit MOL Pump Hoist & Monorail Track I Beam It also involves carrying out detailed load analysis that will enable the relocation of the existing diesel firewater engine and housing that may obstruct the planned MOL pumps hoist and monorail track I-beam installation. Client Name: MPN QIT, Eket Location: Ubit Offshore Platform Date: October 2002 – December 2002 Contract Type: Reimbursable, Detail Engineering Client Contact: Jim Morris James. m. morris@exxonmobil. com A Mark of great impact 42 www. pointengineering. com

Point Engineering Limited Etim A, B, and PP Flame Arrestor Installation Design The scope Point Engineering Limited Etim A, B, and PP Flame Arrestor Installation Design The scope of work is to provide detailed Engineering design, drawings and documentation for the installation of in-line flame arrestors on Etim ‘A’, Client Name: MPN QIT, Eket Location: Etim Offshore Platform Date: October 2002 – December 2002 Contract Type: Reimbursable, Detail Engineering ‘B’, & ‘PP’ sump tank vent lines Client Contact: Jim Morris James. m. morris@exxonmobil. com A Mark of great impact 43 www. pointengineering. com

Point Engineering Limited Detailed Design of Maintenance Platform on Power plant machine Hall for Point Engineering Limited Detailed Design of Maintenance Platform on Power plant machine Hall for Access to 20 Ton Hoist Due to lack of direct access to perform maintenance on the electrical/mechanical components of the 20 Tons Crane Hoist at the Mobil’s QIT power plant machine hall, a safely designed mezzanine deck was required. Point Engineering Ltd performed detail load analysis, weld/bolting details, deck layout and support details for the project. Construction scope of work, project schedule and cost estimate were produced for the project. Client Name: MPN QIT, Eket Location: QIT, Eket Date: October 2002 – December 2002 Contract Type: Reimbursable, Detail Engineering Client Contact: Jim Morris James. m. morris@exxonmobil. com A Mark of great impact 44 www. pointengineering. com

Point Engineering Limited Detailed Design of Ubit GY and GP Sump Tank Debottlenecking The Point Engineering Limited Detailed Design of Ubit GY and GP Sump Tank Debottlenecking The scope of the project is the provision of detailed engineering design for the complete debottlenecking of the Ubit GP / GY Sump system and in line with API RP 14 C, which requires that a Sump pump should run on auto mode, while a sump tank should not be a pressurized vessel. The work also entails the selection of a sump pump, capable of maintaining higher pressure that will overcome production Separator discharge pressure without backing out. Client Name: MPN QIT, Eket Location: Ubit Offshore Platform Date: August 2002 – October 2002 Contract Type: Reimbursable, Detail Engineering Client Contact: Jim Morris James. m. morris@exxonmobil. com A Mark of great impact 45 www. pointengineering. com

Point Engineering Limited Detailed Engineering Design for the Installation of Ubit BS&W Laboratory Upgrade Point Engineering Limited Detailed Engineering Design for the Installation of Ubit BS&W Laboratory Upgrade The work entails the provision of engineering design services to generate all necessary detailed drawings and documentations required to carry out structural, piping, and electrical equipment installation works for convert ion of the mini portakabin at Ubit PP to a BS&W laboratory, in line with MPN requirements (OIMS System 5 -4 (Personnel Safety Management) Client Name: MPN QIT, Eket Location: Ubit Offshore Platform Date: August 2002 – October 2002 Contract Type: Reimbursable, Detail Engineering Client Contact: Jim Morris James. m. morris@exxonmobil. com A Mark of great impact 46 www. pointengineering. com

Point Engineering Limited EA PROJECT Layout/Hazardous Area Classification of Granstaff Barge/DP-A Platform As part Point Engineering Limited EA PROJECT Layout/Hazardous Area Classification of Granstaff Barge/DP-A Platform As part of the activities for Well Clean out and Testing for the EA Project, SPDC issued a work order to Oiltest Services (NIG. ) Limited to carry out layout design to enable Oiltest and Halliburton Equipment hook-up on MV Lowell Granstaff Barge in line with safety requirements of API 15 (Hazardous Area Classification). The project scope also involves Preparation of Process Drawings of the preferred scheme to enable HAZOP of the Oiltest and Halliburton processes Client Name: SPDC, Eastern Division Location: EA Offshore Platform Date: October 2002 – November 2002 Contract Type: Lumpsum, Detail Engineering Client Contact: Mr. Ubani A Mark of great impact 47 www. pointengineering. com

Point Engineering Limited Design of Gas Line Scrapper Traps and Slug Catchers In 1992 Point Engineering Limited Design of Gas Line Scrapper Traps and Slug Catchers In 1992 Phase IV of Pipeline Internal Inspection Program was undertaken by SPDCEAST and modification of the scraper traps on the following three gas lines require immediate attention: 8” x 10. 52 Km Afam Gas Plant – Afam NEPA MANIFOLD Gas line 10” x 10. 60 Km Afam Gas Plant – Afam NEPA MANIFOLD Gas line Client Name: SPDC, Eastern Division Location: Afam and Kolocreek Date: April 2002 – October 2002 Contract Type: Lumpsum, Detail Engineering 6” x 1. 9 Km Kolocreek – Imiringi Gas line PEL scope includes modifications of the existing pig traps and design of new slug catchers for the above lines necessary to enable cleaning, flushing and internal inspection of the lines in readiness for resumption of gas supply from Afam Gas Plant to NEPA Power Plant after a prolong shutdown of the plants since 1999. Client Contact: Joe Dim joe. dim@shell. com A Mark of great impact 48 www. pointengineering. com

Point Engineering Limited The Agbara/Ota Gas Distribution System comprises of the following: Agbara/Ota Gas Point Engineering Limited The Agbara/Ota Gas Distribution System comprises of the following: Agbara/Ota Gas Distribution Systems (Operating Manual & Commissioning Assistance) * Custody Transfer Station (CTS). * Pressure Reduction & Metering Station (PRMS). * Customer Stations (CS) Shell Nigeria Gas Limited contracted to PEL the task of developing a comprehensive operating and maintenance manual for these systems. In addition to the manual preparation, PEL’s scope also include rendering commissioning assistance services for the plant commissioning group and standardization of various engineering drawings. Client Name: Shell Nigeria Gas Limited Location: Agbara / Ota Date: June 2002 – December 2002 Contract Type: Lumpsum, Detail Engineering Client Contact: Chucks Ahiakwo Chukwuma. ahiakwo@shell. com A Mark of great impact 49 www. pointengineering. com

Point Engineering Limited SPDC Planned to install a Remote Field Manifold (RFM) at Agbada Point Engineering Limited SPDC Planned to install a Remote Field Manifold (RFM) at Agbada Well, Location 20 as part of her efforts to reduce clusters of flowlines in the field. In addition to the RFM, installation of 3 Nos 6” x 1. 6 Km Bulklines, 1 Nos 4” x 1. 6 Km Testline and 1 Nos 2” x 1. 6 Km Airline were also involved in the project. Detailed Design of Remote Field Manifold – RFM (Agbada Loc. 20) PEL performed the detailed engineering phase of the project. The work includes preparation of Pipeline Alignment Sheets, Piping General Arrangement Drawings, Isometric Drawings with MTO’s, PEFS’s Instrument Design based on OPEN SYSTEM ARCHITECTURE etc. Client Name: SPDC, Eastern Division Location: Agbada Field Date: August 2002 – November 2002 Contract Type: Lumpsum, Detail Engineering Client Contact: Elisha Ezekiel-Hart Elisha. ezekiel-hart@shell. com A Mark of great impact 50 www. pointengineering. com

Point Engineering Limited Provision of Hazop Leader and Secretary Provided HAZOP Leader and Secretary Point Engineering Limited Provision of Hazop Leader and Secretary Provided HAZOP Leader and Secretary including reports and review services for the Obigbo to IA Gas Pipeline Project. Client Name: SPDC, Eastern Division Location: Shell IA Date: April 2002 Contract Type: Reimbursable, Engineering Services Client Contact: Badar S. Al-Sharjy b. al-sharjy@shell. com A Mark of great impact 51 www. pointengineering. com

Point Engineering Limited Preparation of Operating and Maintenance Manuals for 12 Land flowstations, 5 Point Engineering Limited Preparation of Operating and Maintenance Manuals for 12 Land flowstations, 5 swamp flowstations and 1 AGG Plant Client Name: SPDC, Eastern Division Location: Land Swamp Date: May 2001 November 2002 Contract Type: Lumpsum, Engineering Studies Client Contact: Felix Odusanya Felix. odusanya@shell. com A Mark of great impact 52 www. pointengineering. com

Point Engineering Limited SPDC embarked on various gas utilization projects as part of its Point Engineering Limited SPDC embarked on various gas utilization projects as part of its efforts to eliminate continous gas flaring in its oil production operations, and CCAGG was one of such projects. Cawthorne Channel AGG Pipeline Project (CCAGG) The EPC phase of the project was split into pipeline & facility scopes and awarded to Daewoo Nigeria Limited who subcontracted the detailed engineering works to Point Engineering Limited. There were eleven pipelines involved for transportation of gas to and from locations within the AGG node and third party facilities (e. g NLNG, ASCON). Client Name: Daewoo / SPDC Location: Cawthorne Channel Date: May 2001 November 2001 Contract Type: Lumpsum, Detail Engineering Point Engineering’s scope includes detailed engineering, Sub-Contracting Engineering Survey of the pipeline R. O. W in Swamps & river / creek terain with supervision and management of the surveyors, soil investigation and resistivity survey, etc. Conceptual Design verification, Pipeline relief, vent and blowdown design were done on the eleven pipelines. Corrosion and Cathodic Protection design was also carried out. Client Contact: Joon Ryoo Joon_ryoo@mail. dwconst. co. kr A Mark of great impact 53 www. pointengineering. com

Point Engineering Limited SPDC-E own and operate an existing Gas Plant at Afam located Point Engineering Limited SPDC-E own and operate an existing Gas Plant at Afam located about 40 km East of Port Harcourt, Nigeria (OML 11). The Gas Plant was seriously vandalised in 1999 to the extent that a complete refurbishment of various facilities such as export pumps, generators, instrumentation items, and electrical system etc. is required to bring the Gas Plant back on stream. Afam Gas Plant Rehabilitation Design In addition it is also required to debottleneck the Gas Plant to enable the processing of 75 MMscfd and at the same time meet the environmental upgrade requirements. The Process Automation System (PAS) is required to be upgraded to a novel OPEN SYSTEM ARCHITECTURE Technology. Client Name: SPDC, Eastern Division Location: Afam Date: Nov. 2001 November 2002 Contract Type: Lumpsum, Detail Engineering Point Engineering performed the conceptual design and full detailed engineering design for the rehabilitation/upgrade works. Client Contact: Elisha Ezekiel-Hart Elisha. ezekiel-hart@shell. com A Mark of great impact 54 www. pointengineering. com

Point Engineering Limited SPDC-E own and operate an existing Flowstation at Afam located about Point Engineering Limited SPDC-E own and operate an existing Flowstation at Afam located about 40 km East of Port Harcourt, Nigeria (OML 11). The Flowstation was seriously vandalised in 1999 to the extent that a complete refurbishment of various facilities such as export pumps, generators, instrumentation items, and electrical system etc. is required to bring the Flowstation back on stream. Afam Flowstation Rehabilitation Design In addition it is also required to debottleneck the Flowstation to enable the processing of 30, 000 bopd and at the same time meet the environmental upgrade requirements. The Process Automation System (PAS) is required to be upgraded to a novel OPEN SYSTEM ARCHITECTURE Technology. Client Name: SPDC, Eastern Division Location: Afam Date: Nov. 2001 November 2002 Contract Type: Lumpsum, Detail Engineering Point Engineering performed the conceptual design and full detailed engineering design for the rehabilitation/upgrade works. Client Contact: Elisha Ezekiel-Hart Elisha. ezekiel-hart@shell. com A Mark of great impact 55 www. pointengineering. com

Point Engineering Limited Gbaran/Kolo Creek Pipelines & Flowstation Expansion Design As part of the Point Engineering Limited Gbaran/Kolo Creek Pipelines & Flowstation Expansion Design As part of the Field Development plan of the Production Area ‘A’ of SPDC-E, installation of a 12” x 14 km crude pipeline is required for bulk production from Gbaran Field to Kolo Creek Flowstation for processing as there is no existing Flowstation at Gbaran. It is also necessary to carry out some modifications/expansion work at Kolo Creek flowstation to enable it to handle the additional fluid from Gbaran. Point Engineering on behalf of Ozono Nigeria Limited carried out the full detailed engineering design for this project. The design work involved Pipeline Hydraulic simulation, Pipeline Mechanical Design, Corrosion Engineering and Cathodic Protection System Design - Utilizing solar power system, etc. Client Name: SPDC, Eastern Division Location: Gbaran and Kolocreek Date: Dec. 1999 February 2000 Contract Type: Lumpsum, Detail Engineering Client Contact: Tayo Opanubi Tayo. opanubi@shell. com A Mark of great impact 56 www. pointengineering. com

Point Engineering Limited Flowstation Asbuilt Mark-ups Point Engineering carried out production of As-built Engineering Point Engineering Limited Flowstation Asbuilt Mark-ups Point Engineering carried out production of As-built Engineering Drawings for four SPDC Flowstations (Imo River 1 & 3, Obigbo North and Agbada-2) The following Engineering drawings were marked up on site to produce the As-built status of the facilities: Client Name: SPDC, Eastern Division Location: Imo River and Obigbo North Date: March 2000 August 2000 Contract Type: Lumpsum, As-built Documenation Process Flow Schemes. Process Engineering Flow Schemes. Piping General Arrangement Layout. Isometric Drawing etc. Client Contact: Elisha Ezekiel-Hart Elisha. ezekiel-hart@shell. com A Mark of great impact 57 www. pointengineering. com

Point Engineering Limited Electrification of Bille Community is required as Part of SPDC’s Community Point Engineering Limited Electrification of Bille Community is required as Part of SPDC’s Community Development Project in the Area. Bille Community Electrification Project Point Engineering carried out the Detailed Engineering Design of the Electrification Systems including 0. 415/11 KV and 11/0. 415 KV transformers, 500 KVA Gas Engine Power Generators, 14 k. M overhead Transmission line and Hook-Up System. Client Name: SPDC, Eastern Division Location: Bille Date: Feb. 2001 May 2001 Contract Type: Lumpsum, Detail Engineering Route Survey for pole locations and cable stringing was also performed by Point Engineering Limited. Client Contact: Chinedu B. Okoye Chinedu. okoye@shell. com A Mark of great impact 58 www. pointengineering. com

Point Engineering Limited Brass Terminal Gun Barrel Tank As a Sub Contractor of OISL, Point Engineering Limited Brass Terminal Gun Barrel Tank As a Sub Contractor of OISL, Point Engineering Limited executed detailed engineering design of Gun Barrel Tanks with the associated fire fighting Systems and tie-in to existing facilities located at NAOC’s Brass Terminal. The work entailed preparation of process drawings (PFD, P & ID etc. ), piping general arrangements and isometrics for transfer pumps, development of Valve List, Line List, MTO using NAOC’s Standard Engineering Specifications. Drawings were also prepared for all the associated instrumentations, Civil / Structural works, and electrical Systems. Client Name: NAOC / OIS Location: Brass Terminal Date: Feb. 2001 June 2001 Contract Type: Lumpsum, Detail Engineering Client Contact: Chris Akhigbe-midu pmnl@projectmasterng. com A Mark of great impact 59 www. pointengineering. com

Point Engineering Limited Engineering Evaluation of Failed Mooring System & Detailed Design of Replacement Point Engineering Limited Engineering Evaluation of Failed Mooring System & Detailed Design of Replacement Hose and Structure AMNI International Limited has an Offshore Storage vessel called AILSA CRAIG with associated Single Buoy Mooring System. This project required the assessment of the failed bridle and fish plate and to carry out detailed design for the replacement. Point Engineering performed mechanical engineering calculations ( stress & strength analysis) to investigate the most appropriate material for the mooring bridle/fish plate. Client Name: AMNI Location: Offshore Storage Platform Date: May 2001 August 2001 Contract Type: Lumpsum, Detail Engineering Client Contact: Wale Olafisan 234 -84 -239079 A Mark of great impact 60 www. pointengineering. com

Point Engineering Limited Engineering Evaluation of Existing 6” Gas Injection Line & Design of Point Engineering Limited Engineering Evaluation of Existing 6” Gas Injection Line & Design of New Gaslift Line AMNI’s IMA Field Platform comprise of a Processing Platform (PP), Well Production Platform (WPP), and interface linkage between WPP and PP. There is an existing 28 ft x 6” flexible hose between WPP of compressor discharge and the bridge interface to the Gas Injection Wells. No evaluation was done when this line was installed. To determine the suitability of this line to convey gas from Gaslift compressors to WPP, an evaluation was required. Client Name: AMNI Location: Langley Offshore Platform Date: Nov. 2000 January 2001 Contract Type: Lumpsum, Detail Engineering Point Engineering carried out engineering evaluation of the existing Gas Injection Line and designed a new Gaslift flowline to Ima 2 ST 4, Ima-7 B and additional two slots with a lift pressure of 1500 psi in addition to the existing gas injection manifold. Client Contact: Wale Olafisan 234 -84 -239079 A Mark of great impact 61 www. pointengineering. com

Point Engineering Limited Detailed Design for Aba Early Gas Supply and Tie-ins Client Name: Point Engineering Limited Detailed Design for Aba Early Gas Supply and Tie-ins Client Name: SPDC, Eastern Division Location: Imo Riv. , & Nkali F/station Date: January 2000 March 2000 Contract Type: Lumpsum, Detail Engineering The Project is required by SPDC to meet gas supply commitments to Aba customers before and after the AGG gas plant comes on stream in November 2000. Before the AGG comes on, 12 mmscf/d off-gas would be taken from Nkali XHP to Imo River 1 Flowstation through the 16” AGG gas pipeline, passed through the existing sales gas scrubber before getting to the customers at Aba. Point Engineering on behalf of Ozono Nigeria Limited carried out the full detailed engineering design for this project. Client Contact: Joseph Ike Joseph. ike@shell. com A Mark of great impact 62 www. pointengineering. com

Point Engineering Limited DESIGN MODIFICATIONS FOR CP INSTALLATIONS AT IMO RIVER 1, OBIGBO NORTH Point Engineering Limited DESIGN MODIFICATIONS FOR CP INSTALLATIONS AT IMO RIVER 1, OBIGBO NORTH AND OGUTA FLOWSTATIONS Shell Petroleum Development Company of Nigeria Limited plans to install 9 Centrifugal Pumps at Imo River 1, Obigbo North and Oguta flow stations to replace existing Reciprocating Pumps. SPDC issued an order (ED-054) to Ozono Nigeria Limited to carry out design modifications of 4 bays in each of these stations to enables flexibility in pump hook-up installation and future replacements. The project scope is also to carry out detail design / engineering and preparation of Approved-for-Construction drawings, construction workscope and materials take-off for pump and driver hook-up to existing facilities. The new Centrifugal Pumps and Client Name: SPDC, Eastern Division Location: Imo Riv. , Obigbo & Oguta Date: Dec. 1999 February 2000 Contract Type: Lumpsum, Detail Engineering Drivers will be vendor supplied. Point Engineering on behalf of Ozono Nigeria Limited carried out the full detailed engineering design for this project. Client Contact: Elisha Ezekiel-Hart Elisha. ezekiel-hart@shell. com A Mark of great impact 63 www. pointengineering. com

Point Engineering Limited Obigbo North Water Re-injection Pilot Project Client Name: Oiltest / SPDC Point Engineering Limited Obigbo North Water Re-injection Pilot Project Client Name: Oiltest / SPDC Location: Obigbo North Date: August 1998 September 1998 Contract Type: Lumpsum, Detail Engineering The Obigbo North field has an existing Water Injection Plant (WIP) with an installed capacity of 15 Mbwpd for pressure maintenance. The WIP uses source water from 2 water wells. The Field Development Plan (FDP) of 1997 identified an additional requirement of 20 Mbwpd. It also identified Produced Water Re-Injection (PWRI) as an economic alternative to the existing source water injection and produced water disposal. The PWRI will increase oil production in Obigbo North, replace its produced water disposal at Bonny Terminal with a more environmentally friendly alternative and create more ullage in the pipeline trunklines. It will also alleviate the produced water processing capacity of Bonny Terminal in the long term. The FDP recommended this pilot scheme to quantify and thus reduce the risks that may be associated with a full-scale implementation of PWRI. The design scope for the project is to carry out detail design engineering and preparation of Approved-for-Construction drawings, construction workscope and materials take-off for Separators and Skimmer hook-up to existing facilities. Client Contact: Patrick Amadi 234 -84230931 A Mark of great impact 64 www. pointengineering. com