OPERA ØStato dell’esperimento ØRun 2007 ØStato CNGS e prospettive per il run 2008 ØOPERA OPERA ØStato dell’esperimento ØRun 2007 ØStato CNGS e prospettive per il run 2008 ØOPERA CF&RC ØRichieste Finanziarie Lucia Votano CSII Roma 5 Giugno 2008 1

OPERA Detector Today SM 1 BMS Veto Target (29 walls) + Target Tracker (6. OPERA Detector Today SM 1 BMS Veto Target (29 walls) + Target Tracker (6. 7 m)2 SM 2 Spectrometer: XPC, HPT, RPC, magnet Detector at 05/29/2008: electronics fully instrumented and tested Brick filling is in progress, 132883 bricks have already been inserted 88% target 2

Detector Filling 3 Detector Filling 3

CNGS 2007 RUN CNGS integrated intensity from Sept. 24 th to Oct 20 th CNGS 2007 RUN CNGS integrated intensity from Sept. 24 th to Oct 20 th 2007: 8. 24 1017 20/10/07 12/10/07 Comissioning Physics 9/10/07 6. 72 1017 pot 5 9 : CNGS very stable at 1. 58 1017 pot/day Problems in ventilation control units of the proton target Nominal intensity : 4. 5 1019 pot /yr (1 yr=200 days) 5/10/07 3. 91 1017 pot 4

2007 run : Interactions in the Target 32 6 expected events in bricks 8. 2007 run : Interactions in the Target 32 6 expected events in bricks 8. 24 1017 p. o. t. 38 events registered during the 2007 CNGS run : 29 CC 9 NC Brick handling, Film Processing, Scanning : first test on real neutrino interactions 5

Event Location & Data analysis Europe Japan 19 (15 CC, 4 NC) 19 (14 Event Location & Data analysis Europe Japan 19 (15 CC, 4 NC) 19 (14 CC, 5 NC) Events confirmed in the CSd 18 18 Events located in the bricks 14 10 1 1 All events Interactions in TT CS-Brick mismatch 1 Analysis in progress 2 Not found 1 For 28 events out of 36, analysis is almost completed On this small sample 6 Wall Finding : > 95% Brick Finding : 80% +- 7% more data needed for a complete tuning 6

CS to brick: design accuracy in position and angle Test-beam = 22 µm = CS to brick: design accuracy in position and angle Test-beam = 22 µm = 5 mrad 7

CS to brick connection for neutrino interactions Data quality looks fine = 54 µm CS to brick connection for neutrino interactions Data quality looks fine = 54 µm = 9 mrad Systematical uncertainties (gap, marks, …) dominate 8

Scan-back accuracy = 4 µm = 2 mrad 9 Scan-back accuracy = 4 µm = 2 mrad 9

Vertex analysis Y NAR IMI REL P Kinematical reconstructed variables Multiplicity Impact parameter 10 Vertex analysis Y NAR IMI REL P Kinematical reconstructed variables Multiplicity Impact parameter 10

Event 180400976 CC interaction / 9 prongs 11 Event 180400976 CC interaction / 9 prongs 11

Tra cks TX TY P Ge. V IP ( m) 1 0. 026 -0. Tra cks TX TY P Ge. V IP ( m) 1 0. 026 -0. 097 - 5. 7 kink PRELIMINARY 2 -0. 024 0. 019 >20 1. 2 mu Hadronic re-interaction 3 0. 045 0. 197 2. 3 – 0. 9 + 1. 7 Event 180400976 3. 2 4 0. 024 0. 203 4. 5 - 2. 1 + 2. 6 22. 8 5 0. 100 0. 051 4. 5 - 2. 1 + 7. 9 22. 8 6 -0. 047 0. 199 2. 5 - 1. 1 + 2. 9 7. 0 7 0. 073 0. 152 3. 0 - 1. 2 + 8. 8 7. 9 8 0. 085 0. 254 1. 6 - 0. 7 + 10. 3 4. 3 9 0. 074 0. 201 1. 8 - 0. 8 + 4. 6 6. 0 10 muon kink 0. 114 0. 010 9. 0 11 0. 132 -0. 001 18. 1 e-pair Secondary Vertex Daughter momentum = 1. 9 +0. 7 -0. 4 kink = 0. 031 rad Flight length = 5901 m (too long for ) PT = 59 Me. V ( cut for charm ≥ 250 Me. V) 12

Event 173520769 CC interaction / 4 prongs 13 Event 173520769 CC interaction / 4 prongs 13

Event 173520769 PRELIMINARY Tra cks TX TY IP ( m) 1 0. 012 0. Event 173520769 PRELIMINARY Tra cks TX TY IP ( m) 1 0. 012 0. 160 1. 9 2 -0. 739 0. 095 4. 7 3 -0. 033 -0. 060 6. 3 4 -0. 015 0. 065 4. 1 E 1 : ~ 510 Me. V E 2 : ~ 260 Me. V : 300 ± 20 mrad compatible with 0 2 : estimated 0 mass: 110 ± 30 Me. V 14

Event 180718369 CC interaction / 10 prongs 15 Event 180718369 CC interaction / 10 prongs 15

e. m. shower Momentum (Ge. V) 1 0. 005 0. 036 3. 3 1. e. m. shower Momentum (Ge. V) 1 0. 005 0. 036 3. 3 1. 7+0. 5 -0. 3 2 0. 005 0. 139 1. 0 parent 3 0. 002 0. 064 6. 6 >20. 0 4 -0. 021 0. 064 7. 1 2. 1+0. 7 -0. 4 -0. 029 0. 046 2. 8 >8. 4 -0. 031 0. 064 7. 3 2. 4+0. 8 -0. 5 -0. 076 0. 068 4. 2 1. 8+1. 6 -0. 6 8 kink IP ( m) 7 First charm candidate TY 6 PRELIMINARY TX 5 Event 180718369 Trac ks -0. 089 0. 141 6. 9 2. 5+1. 4 -0. 7 9 -0. 183 0. 106 5. 4 0. 7+0. 2 -0. 1 10 -0. 297 -0. 143 19. 2 0. 7+0. 3 -0. 1 11 -0. 067 0. 008 7. 3 3. 5+3. 6 -1. 2 e. pair 12 -0. 069 0. 005 16. 8 2. 0+3. 1 -0. 8 e. pair Secondary Vertex Daughter momentum = 3. 9 +1. 7 -0. 9 kink = 0. 204 rad Flight length = 3247 m PT = 796 Me. V PTMIN = 606 Me. V (90% C. L. ) 16

2007 run: Interactions outside the Target 331 events passed the analysis cut 303 had 2007 run: Interactions outside the Target 331 events passed the analysis cut 303 had been expected: ratio similar to the one observed in 2006 Muon vertical angle CNGS operated in the same conditions as in 2006 run Energy of the muon (RPC) 17

CNGS Electronics - underground Layout of the ventilation control electronic equipment Designated “radiation safe” CNGS Electronics - underground Layout of the ventilation control electronic equipment Designated “radiation safe” areas for electronics electronic equipment 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25

CNGS schedule - week 21 : completion of the modification work OK - week CNGS schedule - week 21 : completion of the modification work OK - week 22 : testing and commissioning OK yesterday news: delay 1 week - week 23 : test with low intensity proton beam - week 24 : no SPS beam for physic - week 25 : (16 -22 June) setting up at 2 10**13 pot per extraction -………Collecting data 26

27 27

2008 run : expected statistics Expected 2008 run Nominal CNGS 140 200 Super Cycle 2008 run : expected statistics Expected 2008 run Nominal CNGS 140 200 Super Cycle (sec. ) 33. 6 - 48 27. 6 Circulating proton 2 x 2 1013 4. 8 1013 Number of days efficiency Integrated pot Total number of interactions Tau candidate (@2. 5 10 -3 e. V 2) 55% 80% 2. 6 -2. 8 1019 4. 5 1019 ~ 2500 ~1 ~125 evts/week 28

29 29

Brick Preparation • CS-Analysis – x-ray markings for alignment ~ 10 mm – connection Brick Preparation • CS-Analysis – x-ray markings for alignment ~ 10 mm – connection of CS-doubletts and brick – search area is scanned for track with matching angle brick (first emulsion) CS 2 x-ray machine CS 1 150 mm Blackness of spot allows to identify the side of emulsion • Brick-Alignment – x-ray markings ~ 40 m – first film to film connection – film number identifier 30

LNGS: Development Facility Line for the automated emulsion development 5 chains ready 3 fully LNGS: Development Facility Line for the automated emulsion development 5 chains ready 3 fully operatives Full Rehersal before ‘ 08 run Maximum rate: ~ 50 bricks/day (16 hours) 31

32 32

European Scanning System • R&D on 20 cm 2/h European Scanning System completed successfully European Scanning System • R&D on 20 cm 2/h European Scanning System completed successfully (end 2004) • 31 ESS distributed among 10 labs ( 23 ESS in 8 Italian labs ): Bari, Bern, Bologna, Lngs, Lyon, Napoli, Padova, Salerno, Roma, LNF • Integrated in a online computers network : including DB, manager , on line computation , plate changer …. . 33

34 34

CF&RC Consuntivo 2007 35 CF&RC Consuntivo 2007 35

CF&RC 2008 36 CF&RC 2008 36

Richieste (K€): MI Sblocco 172 sj di cui 40 a Bari sono una tasca Richieste (K€): MI Sblocco 172 sj di cui 40 a Bari sono una tasca generale Cons Sblocco 75 sj INFN CF&RC ( 79 ancora da assegnare) App Sblocco 50 sj materiale spare per microscopi Pendente richiesta 40 K€ per controller RPC 37