Oil Spillage Contingency Plan – County Kerry Mick Boyce, S. E. E. , Environment Oil Spillage Contingency Plan – County Kerry Mick Boyce, S. E. E. , Environment Department, Kerry County Council.

Thanks to : Conor Culloo; n Vincent Hayes; n SEA-PT (Hugh Conlon). n Thanks to : Conor Culloo; n Vincent Hayes; n SEA-PT (Hugh Conlon). n

Incidents (Kerry) : Ranga (1980) – Slea Head; Celestial Dawn (2002) – Dingle Harbour; Incidents (Kerry) : Ranga (1980) – Slea Head; Celestial Dawn (2002) – Dingle Harbour; Fidelma (2002) – Inish na bro (Blaskets).

Purpose of the Plan : n n n A guide to aid in the Purpose of the Plan : n n n A guide to aid in the coordination of response to a marine-based Oil/HNS incident; To guide responders through the actions and decisions required to mount an effective response to a marine-based Oil/HNS incident; A guide to limit/mitigate the effects of such an event.

Background Context : Legal requirement to produce appropriate plan (Sea Pollution Act); n Number Background Context : Legal requirement to produce appropriate plan (Sea Pollution Act); n Number of marine-based incidents around the coast of Kerry; n SEA-PT and Harbour Board plans already in place. n

Background Context (Contd. ) : n n County Oil Pollution Officer [COPO] in place Background Context (Contd. ) : n n County Oil Pollution Officer [COPO] in place (me!) – appointed by Manager’s Order; Large KCC stock-pile built up over many years (TVH); Members of SEA-PT; In-house experience (previous incidents, training etc. )

Plan preparation options: n Outsource; n In-house. Decision criteria : n Budgetary considerations; n Plan preparation options: n Outsource; n In-house. Decision criteria : n Budgetary considerations; n Data gathering/local knowledge; n Availability of in-house knowledge and expertise; n Use of standard IRCG format (generic format and data). Final Decision : In-house

Initial Stages of Plan preparation : n n n Staff member assigned to prepare Initial Stages of Plan preparation : n n n Staff member assigned to prepare the plan; In-house group established to oversee the project ; Internal and external consultations (state agencies and departments, NGOs etc. ) - limited response; Data gathering (assets at risk etc. ); Literature review (availability of generic material).

n n Format : standard IRCG template; Coverage : coastline (seashore) within the functional n n Format : standard IRCG template; Coverage : coastline (seashore) within the functional area of Kerry County Council (excluding SEA-PT and Harbour Board areas); Preparation timeframe : approx. 3 months; On-going review by implementation group during period of preparation of plan;

n Submission of various drafts to IRCG. ; n Approved by IRCG in May, n Submission of various drafts to IRCG. ; n Approved by IRCG in May, 2012; n Lifespan : 5 years; n Annual up-date/review.

Main Elements of the Plan Main Elements of the Plan

Part 1 - Strategy Part 1 - Strategy

Relationship with other plans : n n SEA-PT & Harbour Plans; Major Emergency Plan Relationship with other plans : n n SEA-PT & Harbour Plans; Major Emergency Plan etc. Roles & Responsibilities (including Internal command structure): n n Local Authority (Shoreline Response); IRCG etc.

Risk Assessment : n n Sensitive Coastline (SAC, SPA, Shellfish, Blue Flag. . . Risk Assessment : n n Sensitive Coastline (SAC, SPA, Shellfish, Blue Flag. . . ); Marine traffic (fishing, leisure, commercial traffic etc. ); Wide variation in coastline types; Tourism reputation etc.

Response Strategies and Plans : What are we dealing with (classification : type of Response Strategies and Plans : What are we dealing with (classification : type of Oil/HNS)? n How much (quantification)? n How will it behave in the marine environment (fate and likely destination)? n How might we deal with it (containment and recovery options)? n

Tiered Response : Tier 1 : Background and minor operational spills resulting in shoreline Tiered Response : Tier 1 : Background and minor operational spills resulting in shoreline pollution which can be dealt with by the relevant local authority or harbour authority.

Tier 2 : Small-scale incidents where local authority may require mutual aid in order Tier 2 : Small-scale incidents where local authority may require mutual aid in order to initiate and maintain a shoreline response

Tier 3 : A large spill where substantial further resources may be required and Tier 3 : A large spill where substantial further resources may be required and support from national government is necessary through the implementation of the National Contingency Plan (NCP).

Training & Exercise Policy : n What training is to be undertaken (SEA-PT exercises, Training & Exercise Policy : n What training is to be undertaken (SEA-PT exercises, IRCG courses); n Training records.

Scenarios Scenarios

Part 2 - Actions Part 2 - Actions

Response procedures : n Plan activation; n Notification formats (who to contact, when and Response procedures : n Plan activation; n Notification formats (who to contact, when and how).

Health & Safety : n Risk assessments; n Safe work procedures, n Safety Data Health & Safety : n Risk assessments; n Safe work procedures, n Safety Data Sheets etc.

Waste Management : n Options for waste minimisation (eg. removal of debris etc. ); Waste Management : n Options for waste minimisation (eg. removal of debris etc. ); n Identification of potential temporary storage sites etc. (technical amendment to landfill licence. ); n Details of waste contractors etc.

Part 3 – Data Directory Part 3 – Data Directory

Contact Directory : n Current contact details for all relevant people and organisations etc. Contact Directory : n Current contact details for all relevant people and organisations etc. Resource Directory : n Inventory of equipment etc.

Part 4 – Cost Recovery Part 4 – Cost Recovery

Insurance Options : n P & I Clubs, Standard Insurance Policies etc. Financial Control Insurance Options : n P & I Clubs, Standard Insurance Policies etc. Financial Control : n Record keeping (what costs are being incurred and on what basis); n Procurement procedures (eg. materials, plant & equipment etc. ).

Part 5 – Annexes Includes : n Copies of neighbouring plans; n Shoreline Protection Part 5 – Annexes Includes : n Copies of neighbouring plans; n Shoreline Protection Strategy (1997) – site -specific booming plans etc.

Issues : n Time-consuming; n Approval by IRCG; n On-going review (keep up-to-date); n Issues : n Time-consuming; n Approval by IRCG; n On-going review (keep up-to-date); n Designation of COPO & Deputy COPO. General Issues : n Large document; n Do neighbouring plans talk? n One national plan versus plethora of county/harbour plans? n 24 -hour response? n Training?

Inland incidents n Regular occurrences; n Separate (shorter) emergency response procedures. Inland incidents n Regular occurrences; n Separate (shorter) emergency response procedures.

Short (16 pages); o Drinking Water Incident Response Plans; o “A Field Guide to Short (16 pages); o Drinking Water Incident Response Plans; o “A Field Guide to Inland Oil-Spill Clean-up Techniques” – CONCAWE (1983); o Need for national guidance! o