Objective ATC 12 ESSIP Plan 2013 Luca DELL’ORTO DSS/EIPR 13. 09. 2013
Comprehensive Explanation (1/2) § Implementation of Medium Term Conflict Detection (MTCD) and MONitoring Aids (MONA) functionalities. § MTCD is an ATC tool which checks the system trajectories (Flight plan enhanced with surveillance data) and identifies the potential conflict. This function requires an appropriate presentation of detected conflict to the planning/tactical controller. § MONA is a conformance monitoring functionality including lateral, longitudinal and vertical conformance as well as progress monitoring. § Some functions, like longitudinal and lateral conformance plus progress monitoring, are widely implemented in ECAC area. § Additional flight conformance monitoring functions as: vertical conformance, CFL conformance, potential co-ordination failure, SSR code conformance, potential level bust are implemented by a limited number of ATM systems. § Automatic reminders (i. e. those that include controller reminders for next sector transfer, co-ordination reminders and maneuvering clearance) are not widely implemented. ESSIP Plan 2013 / Objective ATC 12 2
Comprehensive Explanation (2/2) § § Scope: ECAC Applicability Area: in en-route airspace of AL / AM / AT / AZ / BA / BE / BG / CH / CY / CZ / DE / DK / EE / ES / FI / FR / GE / GR / HU / IE / IT / LU / LV / MAS / MD / ME / MK / MT / NL / NO / PL / PT / RO / RS / SE / SI / SK / TR / UA / UK Requirement: Implement and make operational use of ground based automated ATC support tool for conflict detection and conformance monitoring. ESSIP Plan 2013 / Objective ATC 12 3
What is new or has changed for ESSIP Plan ed. 2013 § Title of SLo. A ATC 12 -ASP 01 changed from ‘Implement MTCD functions’ into ‘Implement MTCD and MONA functions and associated procedures’ ESSIP Plan 2013 / Objective ATC 12 4
Link to European ATM Master Plan and/or Interim Deployment Programme (IDP) Eur. ATM Master Plan: § [CM-0202] - Automated Assistance to ATC Planning for Preventing Conflicts in En Route Airspace - ESSENTIAL § [CM-0203] - Automated Flight Conformance Monitoring – ESSENTIAL IDP: § None ESSIP Plan 2013 / Objective ATC 12 5
Most important SLo. A(s) § ASP 01 – ‘Implement MTCD function’ § ASP 03 – ‘Develop safety assessment for the changes’ together with: § REG 01 – ‘Approve use of MTCD and conformance monitoring functions and associated operational procedures’ ESSIP Plan 2013 / Objective ATC 12 6
Finalisation Criteria and Closed Questions § REG 01 – The introduction of the change into service was accepted and a notification of acceptance has been provided to the ANSP. § ASP 01 – MTCD and conformance monitoring are implemented, documented and in operational use. § ASP 03 – The Safety assessment report including safety arguments for the changes has been delivered to the NSA and a notification of acceptance was received. § MTCD and MONA implemented? § Safety assessment done and accepted by NSA? § Notification of acceptance received from NSA? ESSIP Plan 2013 / Objective ATC 12 7
Supporting Material § EUROCONTROL Specification for Medium-Term Conflict Detection, Ed 1. 0 of 15/07/2010; EUROCONTROL-SPEC- 0139 § EUROCONTROL Specification for Monitoring Aids, Ed 1. 0 of 15/07/2010; EUROCONTROL-SPEC-0142 § EUROCONTROL Specification for Trajectory Prediction, Ed 1. 0 of 15/07/2010; EUROCONTROL-SPEC-0143 ESSIP Plan 2013 / Objective ATC 12 8
ESSIP Report 2012 § Progress mostly on schedule. § 13 States have declared it Completed, another 5 as Partially Completed and 18 with plans for completion by FOC date (12/2016) at the latest. ESSIP Plan 2013 / Objective ATC 12 9
Links and contacts § Objective Coordinator: Dell’Orto Luca, +32 2 729 3325 luca. dellorto@eurocontrol. int § EUROCONTROL Objective Expert: Predrag Terzioski, +32 2 729 3347 predrag. terzioski@eurocontrol. int ESSIP Plan 2013 / Objective ATC 12 10