dedb8d2e18d14d7325fc9e579acf5027.ppt
- Количество слайдов: 22
News from ELAN SC of CARE Paris Sept 5 2005 1
News from ILC Ø GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from ELAN managt) under ILCSC ‘oversight’ Snowmass meeting (ALCPG->Intal) 2 weeks in August to reach ILC configuration - Physics (Aspen), Detector, Accelerator (after Ke. K) - 640 participants (1/3 machine) - 10 critical recommendations/decisions Ø EUDET: I 3 for detector approved 7 M€ 21 partners Ø 2
GDE – Staffing Staff the GDE l Administrative, Communications, Web staff l Regional Directors (one per region) l Accelerator Experts (covering all technical areas) l Senior Costing Engineer (one per region) l Civil/Facilities Engineer (one per region) l Detectors (WWS chairs) l Fill in missing skills (later) Ø Total staff size about 20 FTE (2005 -2006) about 40 heads. Ø The internal GDE organization and tasks will be organized internationally, not regionally Ø 3
GDE – Near Term Plan Ø Schedule • Begin - define Configuration (Snowmass Aug 05) • Baseline Configuration Document (end of 2005) ----------------------------------- • Baseline under Configuration Control (Jan 06) • Develop Reference Design (end of 2006) • Coordinate the supporting R&D program Ø Three volumes -- 1) Reference Design Report; 2) Shorter glossy version for non-experts and policy makers ; 3) Detector Concept Report 4
The GDE Plan and Schedule 2005 2006 2007 2008 2009 2010 Global Design Effort Baseline configuration Reference Design Project LHC Physics Technical Design ILC R&D Program Bids to Host; Site Selection; International Mgmt 5
ELAN and ILC Ø Support relevant for European WS with acknowledgement of ELAN support (logo) Document(s) ELAN issued Ø List in http: //esgard. lal. in 2 p 3. fr/Project/Activities/Current/Networking/N 2/ELAN/Workshops/ Ø Support for international (ILC) meetings: LCWS 05 (MDI, ACCEL)+SNOWMASS 6
Workshops Supported by ELAN 2005 WIGGLE 2005 - Mini-Workshop on Wiggler Optimization for Emittance Control 21 - 22 February Frascati, Italy Metrology and Stabilisation - for Linear Colliders Workshop 10 - 11 March LAPP, Annecy le Vieux, France LCWS 05 - International Linear Collider Workshop 18 - 22 March Stanford, USA TESLA Collaboration Meeting 30/3 - 1/4/2005 DESY, Germany Positron Sources for International Linear Collider 11 - 13 April Daresbury, UK HEEAUP 2005 - International Workshp on High Energy Electron Acceleration Using Plasmas 2005 8 - 10 June Institut Henri Poincaré, Paris, France ILC-BDIR London Beam Delivery Systems 20 - 23 June London, UK The 2005 International Linear Collider Physics and Detector Workshop and Second ILC Accelerator Workshop 14 - 27 August Snowmass, Colorado, USA 7
SRF WS Cornell Outreach Metrology & Stabilisation Annecy E+ Sources Daresbury Doc-05 -06 Doc-05 -07 DR Frascati Doc-05 -12 ILC-WW Snowmass ILC-Regional London ELAN Plenary + 4 Parallel TTC SR Techno DESY Doc-05 -09 LCWS 05 MDI Stanford Doc-05 -05 8
Main decisions/recommendations 1 beam and luminosity parameters 2 main linac starting gradient, upgrade gradient, and upgrade path 3 straight or follow earth's curvature? 4 1 or 2 IRs, if two, run interleaved? 5 1, 1. 5, or 2 tunnel 6 DR size and shape 7 e+ source type conv/undulator/Compton 8 is there an e+ pre damping ring 9 DR location: 1 st half tunnel, 2 nd half, ceiling, under cryomodules, separate tunnel 10 cavity shape/material/processing 9
Polarized e+/e- source based on Compton back scattering Frank Zimmermann, CERN LP 05 Øhighly polarized e+ and e- (>90%); T. Omori, J. Urakawa, KEK K. Moenig, A. Variola, F. Zomer, LAL Øgeneration decoupled from collider P. Raimondi Frascati J. Urakawa to 5 Ge. V ring ~100 Me. V Accumulator Ring pol. e+ to 5 Ge. V ring ~100 Me. V Accumulator Ring pol. e- 1. 3 Ge. V S-band linac 180 m laser-Compton ring ATF proof-of-principle experiment produced ~104 pol. e+ per pulse accumulate >100 bunchlets to make nominal bunch; →needs large-acceptance accumulator ring & fast cooling 10
Cavity shape/material/processing Summary Talk London (L. Lilje) https: //ilcsupport. desy. de/cdsagenda/ask. Archive. php? base=agenda&c ateg=a 0522&id=a 0522 s 53 t 3/transparencies/Summary_of_SRF_WG _LL_. pdf Ø BCD Proposal for Cavity preparation (short) http: //alcpg 2005. colorado. edu: 8080/alcpg 2005/program/accelerator/W G 5/helen_edwards 20050821164419. ppt Ø BCD Proposal for Cavity preparation (long) http: //alcpg 2005. colorado. edu: 8080/alcpg 2005/program/accelerator/W G 5/helen_edwards 20050819140512. ppt Ø 11
Next steps Ø European GDE meeting in Oxford Ø GDE meeting in Frascati to finalize decisions for the baseline -> ELAN support is asked by the B. Foster Ø Prepare for FP 7 Ø Contribute to ILC outreach (presentation L. Lilje at Cornell & Snowmass) 12
Outreach and Tutorials supported ELAN Snowmass SRF Cavity tutorial (L. Lilje) http: //alcpg 2005. colorado. edu: 8080/alcpg 2005/program/ENO/Superco nductingcavitiestutorial_new. pdf Ø Srf Tutorials at SRF 2005 Workshop WWW-Link: http: //www. lns. cornell. edu/public/SRF 2005/ Ø Tutorial session on Sunday: http: //www. lns. cornell. edu/public/SRF 2005/program. html Ø Especially talk by D. Reschke on cleaning (paid by ELAN): http: //www. lns. cornell. edu/public/SRF 2005/talks/sunday/Su. P 03_talk_s rf 2005. pdf Ø 13
ELAN Management New adsociates - US: SLAC (M. Ross) - Technion (S. Tarem) - Center for the Advancement of Natural Discoveries using Light Emission, Yerevan , Armenia - Cracow University of Technology, (Institute of Applied Mechanics), Krakow, Poland - University of Ankara (K. Ciftci) Ø Support ICFA school on ILC ? Ø ANAD has launched a NEST proposal 1 st level selection EUROLEAP: European Laser Electron controlled Acceleration in Plasmas to Ge. V energy range Ø 14
HEEAUP 2005 Paris 15
16
ELAN Documents 17
Conclusion ELAN activity is mainly driven by the international GDE (WG 3 -4) Ø ELAN support has been instrumental in preparing and supporting the Snowmass meeting Ø European support has been essential and should be maintained within FP 7 Ø Ø Interesting prospects of collaboration with the laserplasma community 18
From ECFA (T. A. ) ICFA beam dynamics panel, Weiren Chou, European co-sponsoring of a linear collider (more specifically ILC) school in spring 2006 in Japan. He has contacted Japan (JSPS) and the USA (DOE) about co-sponsoring and sent a mail to T. A. about "which European agency to contact". Quantitatively we talk about 40 -55'000 euros, assuming 20 -25 students and 6 -8 lecturers from Europe. Ø 19
20
Cornell WS Snowmass+Report Doc-05 -09 21
London+Snowmass Report expected Paris meeting Euroleap 22


