Скачать презентацию News from ELAN SC of CARE Paris Sept Скачать презентацию News from ELAN SC of CARE Paris Sept

dedb8d2e18d14d7325fc9e579acf5027.ppt

  • Количество слайдов: 22

News from ELAN SC of CARE Paris Sept 5 2005 1 News from ELAN SC of CARE Paris Sept 5 2005 1

News from ILC Ø GDE structure founded under B. Barish: 3 GDE regional Directors News from ILC Ø GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from ELAN managt) under ILCSC ‘oversight’ Snowmass meeting (ALCPG->Intal) 2 weeks in August to reach ILC configuration - Physics (Aspen), Detector, Accelerator (after Ke. K) - 640 participants (1/3 machine) - 10 critical recommendations/decisions Ø EUDET: I 3 for detector approved 7 M€ 21 partners Ø 2

GDE – Staffing Staff the GDE l Administrative, Communications, Web staff l Regional Directors GDE – Staffing Staff the GDE l Administrative, Communications, Web staff l Regional Directors (one per region) l Accelerator Experts (covering all technical areas) l Senior Costing Engineer (one per region) l Civil/Facilities Engineer (one per region) l Detectors (WWS chairs) l Fill in missing skills (later) Ø Total staff size about 20 FTE (2005 -2006) about 40 heads. Ø The internal GDE organization and tasks will be organized internationally, not regionally Ø 3

GDE – Near Term Plan Ø Schedule • Begin - define Configuration (Snowmass Aug GDE – Near Term Plan Ø Schedule • Begin - define Configuration (Snowmass Aug 05) • Baseline Configuration Document (end of 2005) ----------------------------------- • Baseline under Configuration Control (Jan 06) • Develop Reference Design (end of 2006) • Coordinate the supporting R&D program Ø Three volumes -- 1) Reference Design Report; 2) Shorter glossy version for non-experts and policy makers ; 3) Detector Concept Report 4

The GDE Plan and Schedule 2005 2006 2007 2008 2009 2010 Global Design Effort The GDE Plan and Schedule 2005 2006 2007 2008 2009 2010 Global Design Effort Baseline configuration Reference Design Project LHC Physics Technical Design ILC R&D Program Bids to Host; Site Selection; International Mgmt 5

ELAN and ILC Ø Support relevant for European WS with acknowledgement of ELAN support ELAN and ILC Ø Support relevant for European WS with acknowledgement of ELAN support (logo) Document(s) ELAN issued Ø List in http: //esgard. lal. in 2 p 3. fr/Project/Activities/Current/Networking/N 2/ELAN/Workshops/ Ø Support for international (ILC) meetings: LCWS 05 (MDI, ACCEL)+SNOWMASS 6

Workshops Supported by ELAN 2005 WIGGLE 2005 - Mini-Workshop on Wiggler Optimization for Emittance Workshops Supported by ELAN 2005 WIGGLE 2005 - Mini-Workshop on Wiggler Optimization for Emittance Control 21 - 22 February Frascati, Italy Metrology and Stabilisation - for Linear Colliders Workshop 10 - 11 March LAPP, Annecy le Vieux, France LCWS 05 - International Linear Collider Workshop 18 - 22 March Stanford, USA TESLA Collaboration Meeting 30/3 - 1/4/2005 DESY, Germany Positron Sources for International Linear Collider 11 - 13 April Daresbury, UK HEEAUP 2005 - International Workshp on High Energy Electron Acceleration Using Plasmas 2005 8 - 10 June Institut Henri Poincaré, Paris, France ILC-BDIR London Beam Delivery Systems 20 - 23 June London, UK The 2005 International Linear Collider Physics and Detector Workshop and Second ILC Accelerator Workshop 14 - 27 August Snowmass, Colorado, USA 7

SRF WS Cornell Outreach Metrology & Stabilisation Annecy E+ Sources Daresbury Doc-05 -06 Doc-05 SRF WS Cornell Outreach Metrology & Stabilisation Annecy E+ Sources Daresbury Doc-05 -06 Doc-05 -07 DR Frascati Doc-05 -12 ILC-WW Snowmass ILC-Regional London ELAN Plenary + 4 Parallel TTC SR Techno DESY Doc-05 -09 LCWS 05 MDI Stanford Doc-05 -05 8

Main decisions/recommendations 1 beam and luminosity parameters 2 main linac starting gradient, upgrade gradient, Main decisions/recommendations 1 beam and luminosity parameters 2 main linac starting gradient, upgrade gradient, and upgrade path 3 straight or follow earth's curvature? 4 1 or 2 IRs, if two, run interleaved? 5 1, 1. 5, or 2 tunnel 6 DR size and shape 7 e+ source type conv/undulator/Compton 8 is there an e+ pre damping ring 9 DR location: 1 st half tunnel, 2 nd half, ceiling, under cryomodules, separate tunnel 10 cavity shape/material/processing 9

Polarized e+/e- source based on Compton back scattering Frank Zimmermann, CERN LP 05 Øhighly Polarized e+/e- source based on Compton back scattering Frank Zimmermann, CERN LP 05 Øhighly polarized e+ and e- (>90%); T. Omori, J. Urakawa, KEK K. Moenig, A. Variola, F. Zomer, LAL Øgeneration decoupled from collider P. Raimondi Frascati J. Urakawa to 5 Ge. V ring ~100 Me. V Accumulator Ring pol. e+ to 5 Ge. V ring ~100 Me. V Accumulator Ring pol. e- 1. 3 Ge. V S-band linac 180 m laser-Compton ring ATF proof-of-principle experiment produced ~104 pol. e+ per pulse accumulate >100 bunchlets to make nominal bunch; →needs large-acceptance accumulator ring & fast cooling 10

Cavity shape/material/processing Summary Talk London (L. Lilje) https: //ilcsupport. desy. de/cdsagenda/ask. Archive. php? base=agenda&c Cavity shape/material/processing Summary Talk London (L. Lilje) https: //ilcsupport. desy. de/cdsagenda/ask. Archive. php? base=agenda&c ateg=a 0522&id=a 0522 s 53 t 3/transparencies/Summary_of_SRF_WG _LL_. pdf Ø BCD Proposal for Cavity preparation (short) http: //alcpg 2005. colorado. edu: 8080/alcpg 2005/program/accelerator/W G 5/helen_edwards 20050821164419. ppt Ø BCD Proposal for Cavity preparation (long) http: //alcpg 2005. colorado. edu: 8080/alcpg 2005/program/accelerator/W G 5/helen_edwards 20050819140512. ppt Ø 11

Next steps Ø European GDE meeting in Oxford Ø GDE meeting in Frascati to Next steps Ø European GDE meeting in Oxford Ø GDE meeting in Frascati to finalize decisions for the baseline -> ELAN support is asked by the B. Foster Ø Prepare for FP 7 Ø Contribute to ILC outreach (presentation L. Lilje at Cornell & Snowmass) 12

Outreach and Tutorials supported ELAN Snowmass SRF Cavity tutorial (L. Lilje) http: //alcpg 2005. Outreach and Tutorials supported ELAN Snowmass SRF Cavity tutorial (L. Lilje) http: //alcpg 2005. colorado. edu: 8080/alcpg 2005/program/ENO/Superco nductingcavitiestutorial_new. pdf Ø Srf Tutorials at SRF 2005 Workshop WWW-Link: http: //www. lns. cornell. edu/public/SRF 2005/ Ø Tutorial session on Sunday: http: //www. lns. cornell. edu/public/SRF 2005/program. html Ø Especially talk by D. Reschke on cleaning (paid by ELAN): http: //www. lns. cornell. edu/public/SRF 2005/talks/sunday/Su. P 03_talk_s rf 2005. pdf Ø 13

ELAN Management New adsociates - US: SLAC (M. Ross) - Technion (S. Tarem) - ELAN Management New adsociates - US: SLAC (M. Ross) - Technion (S. Tarem) - Center for the Advancement of Natural Discoveries using Light Emission, Yerevan , Armenia - Cracow University of Technology, (Institute of Applied Mechanics), Krakow, Poland - University of Ankara (K. Ciftci) Ø Support ICFA school on ILC ? Ø ANAD has launched a NEST proposal 1 st level selection EUROLEAP: European Laser Electron controlled Acceleration in Plasmas to Ge. V energy range Ø 14

HEEAUP 2005 Paris 15 HEEAUP 2005 Paris 15

16 16

ELAN Documents 17 ELAN Documents 17

Conclusion ELAN activity is mainly driven by the international GDE (WG 3 -4) Ø Conclusion ELAN activity is mainly driven by the international GDE (WG 3 -4) Ø ELAN support has been instrumental in preparing and supporting the Snowmass meeting Ø European support has been essential and should be maintained within FP 7 Ø Ø Interesting prospects of collaboration with the laserplasma community 18

From ECFA (T. A. ) ICFA beam dynamics panel, Weiren Chou, European co-sponsoring of From ECFA (T. A. ) ICFA beam dynamics panel, Weiren Chou, European co-sponsoring of a linear collider (more specifically ILC) school in spring 2006 in Japan. He has contacted Japan (JSPS) and the USA (DOE) about co-sponsoring and sent a mail to T. A. about "which European agency to contact". Quantitatively we talk about 40 -55'000 euros, assuming 20 -25 students and 6 -8 lecturers from Europe. Ø 19

20 20

Cornell WS Snowmass+Report Doc-05 -09 21 Cornell WS Snowmass+Report Doc-05 -09 21

London+Snowmass Report expected Paris meeting Euroleap 22 London+Snowmass Report expected Paris meeting Euroleap 22