NEW YORK STATE DEPARTMENT OF TRANSPORTATION SR 427 over Chemung River Design-Build Project PIN NEW YORK STATE DEPARTMENT OF TRANSPORTATION SR 427 over Chemung River Design-Build Project PIN 6039. 11, Contract No. D 900019 Town of Chemung, Chemung County Draft Request for Proposals RFP Informational Meeting July 17, 2014

SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Rules of SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Rules of Contact 2 Catherine Traina Attn: SR 427 over Chemung River Project Office of Contract Management New York State Department of Transportation 50 Wolf Road, 6 th Floor Albany, New York 12232 Catherine. Traina@dot. ny. gov

SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Agenda 3 SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Agenda 3 Project Overview Procurement Schedule Department’s Goals & Project Requirements Scope of Work Status of: ROW and Utilities General Contract Information RFP Content Quality Control & Quality Assurance Evaluation and Selection Additional Information and Submission Guidelines Questions and Answers

SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) General Location SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) General Location 4

SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Anticipated Procurement SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Anticipated Procurement Schedule 5 Activity Due Date Draft RFP Info Meeting July 17, 2014 Final RFP to Shortlisted Firms July 31, 2014 Final Date for Requests for Changes to Proposer’s Organization and Personnel August 13, 2014 Final Date for receipt of Proposer Questions September 2, 2014 Issue Date for Final Addendum and/or Answers to Proposer Questions September 8, 2014 Proposal Due September 17, 2014 Post Proposal Meetings (if required) Selection of Best Value TBD October 2014 Contract Award November 2014 Notice to Proceed December 2014

SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Goals 6 SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Goals 6 Replace aging structure over Chemung River Ensure the safety of the traveling public Ensure coordination with all utility owners and third parties Ensure a long-service life for all Project elements to satisfy long term preservation goals Maximize the beneficial impact of the public investment in the Project by Providing cost-effective solutions that maximizes value over the lifespan of the SR 427 Bridge over the Chemung River; Sequencing construction to minimize effects on vehicular traffic operations; Reducing future maintenance requirements; Deliver Project Safely, On Schedule, On Budget, and Environmentally Compliant. Provide best value to the Department

SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) General Scope SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) General Scope of Work 7 Demolish existing structure and foundation Construct new bridge over Chemung River New bridge and foundation constructed to 75 -year design life Maintain traffic on-site throughout construction Use of off-site vehicular detours prohibited Maintain minimum travel way widths during construction Design-Builder has the option of two-lane, two-way traffic or signalcontrolled one-lane, two-way traffic Provide adequate hydraulic opening for the Chemung River Construct new approach roadways Design and construct scour resistant piers and channel banks Construct open drainage system with 75 -year service life

SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) General Scope SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) General Scope of Work (Continued) 8 Construct new USGS gaging station Demolish old USGS gaging station Avoid environmental impacts: Threatened and endangered species Farmlands Wetlands Obtain necessary environmental permits SPDES General Permit coverage USACo. E Section 404 Permit NYSDEC Section 401 Permit Relocation and/or preservation of existing utilities Remediation and disposal of asbestos containing materials if disturbed

SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Proposed Typical SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Proposed Typical Cross Section 9

SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Right-of-Way 10 SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Right-of-Way 10 The Department owns a substantial right of way that will allow construction to occur on existing alignment or new parallel alignment. The Department acquired a small parcel on south side of river that contains the existing USGS gaging station. The contractor shall rebuild the USGS gaging station within the ROW on the south side of River. No additional Right-of-Way acquisitions or temporary easements are anticipated to be required for this project.

SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Utility Coordination SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Utility Coordination – Existing Utilities 11 In accordance with Part 4 – Utility Requirements, Design. Builder is responsible for: Verifying utility facility locations; Identifying & resolving any conflicts not yet documented; Coordinating with utility owners for utility relocations; Providing stakeout and final layout of utility relocations; Protecting existing utilities; Cost to repair damages to utilities caused by Design-Builder; Informing the Department of all meetings/correspondence with utility owners.

SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Utility Coordination SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Utility Coordination – Existing Utilities 12 Frontier: – Frontier shall be responsible for any necessary relocation of aerial facilities within the project limits. NYSEG: – NYSEG shall be responsible for any necessary relocation of aerial facilities within the project limits. USGS Gaging Station: – Design-Builder shall be responsible for coordinating with utility companies (Frontier and NYSEG) to provide communications and electrical services to the new Gaging station and for disconnecting services from the existing station, including all fees required by the utilities.

SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Contract Information SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Contract Information 13 Lump Sum Design-Build Contract; Best Value Selection Process (50% Price, 50% Quality); Project Completion Date shall be the earlier of: August 31, 2016; or The number of days past NTP proposed by the successful Proposer on Form SCD (ITP Appendix D) There is a Payment Schedule provided in the RFP; $45, 000. 00 Stipend to Unsuccessful Proposers; Liquidated Damages will be imposed for not meeting the Project Completion date; Escrow Submission of Bid Documents for Successful Proposer

SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Contract Information SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Contract Information (Continued) 14 There is a Buy America Clause There is an Iran Divestment Act Clause There is a DBE Participation Goal of 10% All ROW acquired by NYSDOT All Environmental and Construction Related Permits by Design-Builder

SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Contract Information SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Contract Information (Continued) 15 RFP Documents: Part 1: D-B Agreement Part 2: General Provisions, Section DB 100 and Appendices Part 3: Project Requirements (Scope of Work) Part 4: Utility Requirements Part 5: Special Provisions Part 6: RFP Plans Part 7: Engineering Data Part 8: Special Specifications (Including New DB Specifications) Part 9: The Design-Builder’s Proposal Instructions to Proposers Part 10: RFP Addenda (If Any) Reference Documents: On Department’s web site (Not Part of the Contract Documents)

SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Contract Information SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Contract Information (Continued) 16 RFP Documents: Instructions to Proposers • General Instructions • Appendix A – Project Information • Appendix B – Administrative Submittal • Appendix C – Technical Submittal • Appendix D – Price Proposal • Appendix E – Forms • • Appendix F – Conflict of Interest Appendix G – Abbreviations and Definitions

SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Quality Control SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Quality Control (QC) 17 QC is Design-Builder’s Responsibility Design-Builder shall appoint a QC Manager responsible for QC Plan for both Design and Construction Design QC shall be performed by the Designer in accordance with the QC Plan Construction Inspection shall be performed by an Independent Engineering Firm (Hired by the Design-Builder) Materials Testing shall be performed by an Independent Materials Testing Firm or Laboratory (Hired by the Design-Builder) The Materials Testing Firm shall report to the Construction Inspection Firm Offsite Plant Quality Control shall be performed by the Department

SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Quality Assurance SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Quality Assurance (QA) 18 Design and Construction QA is the Department’s Responsibility The Department may perform QA on any of the Design. Builder’s Design and Construction activities The Department will utilize an independent Consultant to perform QA of the Design-Builder’s Designs Construction QA will be performed by Department staff Offsite Plant Quality Assurance will be performed by the Department

SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) RFP Evaluation SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) RFP Evaluation and Selection 19 Pass/Fail Evaluation Factors Legal – Financial – Administrative – DBE Compliance - Price Proposal (Bond/Conformance) Quality Evaluation Factors (50%) Key Personnel (30 points) Management Approach (32 points) Overall Design-Build Team Organization (10 points) Design Management Plan (5 points) Construction Management Plan (5 points) Quality Control Plan (12 points) Technical Solutions (30 points) Design Approach (10 points) Construction Approach (10 points) CPM Schedule (10 points) Project Support (5 points) Proposal Format(3 points) Price (50%) Design-Builder must obtain a minimum score of 60 points on Quality Evaluation factors

SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Additional Information SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Additional Information – Submission Guidelines 20 All proposals must be self-contained. • Proposals should not have links to external web sites. • Proposals should contain all information needed for evaluation. Do not “assume the Department knows” your firm and it’s experience/qualifications.

SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Additional Information SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Additional Information – Submission Guidelines 21 Submit ALL Forms required. Do not alter any Form unless indicated on the Form. Do not add any appendices or attachments to the Forms. Do not include photographs or illustrations unless specifically indicated. Do not submit Form SA (Stipend Agreement) Form BDEA (Bid Document Escrow Agreement) PAB (Payment Bond (Labor and Material Bond)) PEB (Performance Bond (Faithful Performance Bond))

SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Additional Information SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Additional Information – Submission Guidelines 22 Responses to Proposer Questions will be posted on the Department’s Project Web Site Reference Documents are Posted on the Department’s Project Web Site: https: //www. dot. ny. gov/main/business-center/designbuildproject 7 Reference Documents include: Design Report Bridge Inspection Reports Record Plans Utility related Documents Historical Borings Other Documents

SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Rules of SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Rules of Contact 23 Catherine Traina Attn: SR 427 over Chemung River Project Office of Contract Management New York State Department of Transportation 50 Wolf Road, 6 th Floor Albany, New York 12232 Catherine. Traina@dot. ny. gov

SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Questions and SR 427 over Chemung River Design-Build Project (PIN 6039. 11; D 900019) Questions and Answers 24 Questions ?