Mungcharoen Green The Energy Long Live For Surin Power Co. , Ltd Province Mungcharoen Green The Energy Long Live For Surin Power Co. , Ltd Province

Company Profile Company Profile

Our company background from Thailand energy policy, This energy policy has major objectives to Our company background from Thailand energy policy, This energy policy has major objectives to promote alternative energy to complement and strengthen Thai Electricity system by using own resources from biomass such as Rice husk, Sugar cane-bagasse corn leaves, plam shell and woodchip, to reduce the import of fossil fuels and to replace Thai supply of fossils fuels which is forecasted to run short in the next 30 years

Mungcharoen Green power has developed Rice Husk Power Plant since 2004 in Surin Province, Mungcharoen Green power has developed Rice Husk Power Plant since 2004 in Surin Province, Northern part of Thailand. The project started construction in January 2005 and completed in November 2006. The Project start commercial operation on January 23, 2007

Company Location Mungcharoen Green Power Co. , Ltd is Located at 333 Moo 7, Company Location Mungcharoen Green Power Co. , Ltd is Located at 333 Moo 7, Surin. Sikhoraphum Road, Tumbon Burusi, Muang District, Surin Province

Factory Layout 180 C , 00 200 , 00 0 Factory building 0 ลบ. Factory Layout 180 C , 00 200 , 00 0 Factory building 0 ลบ. ม. D 60, 000 ลบ. ม. A ลบ. ม. 400 B , 00 4 Water storage pond 0 ลบ. ม.

Factory Building Plant 1 day Silo Cooling Tower Boiler Plant STG House Earth Pond Factory Building Plant 1 day Silo Cooling Tower Boiler Plant STG House Earth Pond Water Treatment Plant

Process Electric Generation Design plant, we use rice husk is main fuel in process Process Electric Generation Design plant, we use rice husk is main fuel in process electrical generation for emergency case can use other biomass in process The rice husk for supply plant 80% from Mungcharoen Rice mill and 20% from alliance

Process Electric Generation Fuel consumption in 85, 000 Ton/Year for generate Electricity 65 Million Process Electric Generation Fuel consumption in 85, 000 Ton/Year for generate Electricity 65 Million k. Wh / year

Process Electric Generation For steam generation, we use Biomass Fire Boiler design by “ERK Process Electric Generation For steam generation, we use Biomass Fire Boiler design by “ERK German” capacity 55 TPH to generated medium pressure super heated steam 40 Bar , 435 degree ‘C Furnace and combustor, we use technology from German by use combustor type “Step Grate”

Process Electric Generation Turbine type “Full Condensing Steam Turbine” from HTC capacity 9, 900 Process Electric Generation Turbine type “Full Condensing Steam Turbine” from HTC capacity 9, 900 k. W rate speed 8, 540 RPM with “Gear reduction” Electricity generation by use Synchronous Generator type “Automatic Voltage Regulator (AVR)” capacity 11, 560 KVA (9, 900 k. W at PF 0. 85) and generate voltage 11, 000 V

Grid Connection The electricity sell to the EGAT Public Company Limited “Firm”, and connect Grid Connection The electricity sell to the EGAT Public Company Limited “Firm”, and connect to grids with PEA line Feeder # 5

Product Electricity Mungcharoen Green power generated 9. 9 MW of electric power. 8 MW Product Electricity Mungcharoen Green power generated 9. 9 MW of electric power. 8 MW of electric power to be sold to EGAT. 0. 8 MW of electric power to be sold to Mungcharoen Rice Mill 0. 8 MW of electric power to be used in the power plant.

Product Rice Husk Ash (RHA) is by product of complete combustion of rice husk. Product Rice Husk Ash (RHA) is by product of complete combustion of rice husk. This kind of ash is high in quality, and it is an essential raw material for steel and silica plant industries.

Environmental and Management Environmental and Management

Waste Water From Process We design to zero discharge system, and over all water Waste Water From Process We design to zero discharge system, and over all water not reject outer factory

Use the zero discharge principle to relieve the anxiety of nearby communities. In practices, Use the zero discharge principle to relieve the anxiety of nearby communities. In practices, waste water is treaded to have quality in accordance with the ministry of industry standard before releasing to holding pond.

Air Pollution System Power plant use clean technology by use 2 system air treatment Air Pollution System Power plant use clean technology by use 2 system air treatment Use the first cleaning by use “Cyclone Dust Collector” and second cleaning by use “ESP”

2. Air pollution Use clean technology, first step use dust collector. For particle > 2. Air pollution Use clean technology, first step use dust collector. For particle > 10 micron (0. 01

2. Air pollution Second step use Electrostatic Precipitator (ESP). For particle < 0. 1 2. Air pollution Second step use Electrostatic Precipitator (ESP). For particle < 0. 1 -1 micron

Third Party Certify Third Party Certify

We are Biomass Learning Center We are Biomass Learning Center

We are Modern Power Plant High Efficiency and Clean Technology We are Modern Power Plant High Efficiency and Clean Technology