Mn. DOT PROJECT UPDATE Trunk Highway 169 Improvements Fall 2016 – Fall 2017 Mn. DOT PROJECT UPDATE Trunk Highway 169 Improvements Fall 2016 – Fall 2017

PROPOSED TH-169 IMPROVEMENTS PROPOSED TH-169 IMPROVEMENTS

PROPOSED TH-169 IMPROVEMENTS PROPOSED TH-169 IMPROVEMENTS

MUNICIPAL CONSENT REQUIRED Proposed water quality treatment ponds. Close-up of the proposed pond & MUNICIPAL CONSENT REQUIRED Proposed water quality treatment ponds. Close-up of the proposed pond & bridge layout in this area. .

2015 TRAFFIC IMPACTS 1) I-494 general purpose lane 2) Hwy 100 bridges (2 -year 2015 TRAFFIC IMPACTS 1) I-494 general purpose lane 2) Hwy 100 bridges (2 -year project) 3) Hwy 100 resurfacing & bridge repair 4) I-94/7 th Street ramp realignment 2017 5) Hwy 169 project A) Nine Mile Creek Bridge 6) I-35 W construct managed lane 7) I-94 concrete pavement repair 2018 8) Hwy 47 resurfacing 2019 9) Rockford Rd bridge over I-494 10) Rockford Rd bridge over Hwy 169 11) 3 rd Avenue bridge rehab 12) I-35 W resurfacing 13) Hwy 55 bridges—redeck Potential projects B) Orange Line transit station C) Reconstruct I-35 W/494 interchange

AREA PROJECTS 1) Oak Ridge Rd Improvements (Between 494 & Essex) 2) Blake Road AREA PROJECTS 1) Oak Ridge Rd Improvements (Between 494 & Essex) 2) Blake Road Reconstruction 3) Louisiana Ave (south of Minnetonka Blvd) 4) SWLRT

HOPKINS ROAD NETWORK Ø 11 St Street N Ø Excelsior Blvd Ø County Rd HOPKINS ROAD NETWORK Ø 11 St Street N Ø Excelsior Blvd Ø County Rd 61 Ø Smetana Rd Ø Bren Rd

LOCAL NETWORK CONSTRAINTS Excelsior Blvd @ 11 th Ave LOCAL NETWORK CONSTRAINTS Excelsior Blvd @ 11 th Ave

LOCAL NETWORK CONSTRAINTS 11 th Ave @ Railroad Bridge Content LOCAL NETWORK CONSTRAINTS 11 th Ave @ Railroad Bridge Content

LOCAL NETWORK CONSTRAINTS 11 th Ave @ Smetana Rd LOCAL NETWORK CONSTRAINTS 11 th Ave @ Smetana Rd

STAKEHOLDERS Stakeholder support Prepare for construction Construction ◦ (now to November 1, 2015) ◦ STAKEHOLDERS Stakeholder support Prepare for construction Construction ◦ (now to November 1, 2015) ◦ (November 1, 2015 to November 1, 2016) ◦ (November 1, 2016 to November 1, 2017)

OUTREACH PLAN & SCHEDULE Ø The first open house is scheduled for August 19 OUTREACH PLAN & SCHEDULE Ø The first open house is scheduled for August 19 at the Hopkins Arts Center (what time? ) Ø Mailings will go out early August for this event.

POSSIBLE OPEN HOUSE CONCEPTS ØLunch time open house – host for 1 -2 hours POSSIBLE OPEN HOUSE CONCEPTS ØLunch time open house – host for 1 -2 hours close to any of the business parks during the weekday lunch time for either a brown bag session or partner with food trucks to have them locate near the meeting ØEvening open house – partner with a local business to provide refreshments and seating or host the open house at a local community center for a more formal meeting presentation

PROJECT INFORMATION SHEET http: //www. dot. state. mn. us/metro/projects/hwy 169 hopkins/index. html PROJECT INFORMATION SHEET http: //www. dot. state. mn. us/metro/projects/hwy 169 hopkins/index. html

Mn. DOT PROJECT UPDATES Questions… Mn. DOT PROJECT UPDATES Questions…