MDTA • Established in 1971 • Purpose – Construct, manage, operate, and improve toll facilities • Funded by toll revenues, not tax dollars • Headquarters - Point Breeze Office Complex, Baltimore • 9 Facilities
MDTA Facilities Toll facilities consist of high-volume signature bridges, tunnels and highways that are major interstate and U. S. routes MDTA Facility Toll Plaza I-95 ETLs Travel Plaza * * Note: the ICC uses All Electronic Tolling (No Toll Plazas)
Maryland Transportation Authority 6 -Year Planned Budget ($Millions) FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 TOTAL Mega Projects $255. 03 $74. 5 $12. 22 $0 $0 $0 $ 341. 75 All Other Major Projects $139. 27 $157. 30 $63. 18 $79. 70 $60. 20 $10. 50 $510. 15 $133. 5 $190. 00 $240. 4 $284. 50 $273. 00 $249. 20 $1, 370. 5 --------- TOTAL $527. 8 $421. 8 System Preservation and D&E --------- ----- $315. 8 $364. 1 $333. 2 $259. 7 $2, 222. 50
I-95 Improvement Project
Hatem and Tydings Bridge Underwater Repairs
Bay Bridge Paint Projects
Bay Bridge Cable Rewrapping and Dehumidification
Travel Plaza Replacements – P 3 Maryland House final rendering Chesapeake House final rendering
Upcoming Bid Opportunities Chesapeake Bay Bridge • • Phase 4 Painting (WB) Deck Rehabilitation (EB) Modify Lane Use System Modify Crossovers and Resurface Approaches • Seal Deck (WB)
Upcoming Bid Opportunities Baltimore Harbor Tunnel • • Replace Vent Fans Rehabilitate K-Truss Spans Resurface Pavement north of the tunnel Deck and Superstructure Replacement over Patapsco Flats • Replace Stand Pipes and Sump Pump in tunnel
Upcoming Bid Opportunities Baltimore Harbor Tunnel – Canton Viaduct Replacement
Upcoming Bid Opportunities Fort Mc. Henry Tunnel • • • Repair Vent Fans Replace Tunnel Lighting Replace Salt Barn Repair/Replace pumps Rehabilitate 4 Bridges over Herring Run and CSX
Upcoming Bid Opportunities John F. Kennedy Highway • Unbraiding of I-695 at I-95 • Zone Paint Tydings Bridge • Resurface Pavement from MD-24 to Delaware line • Replace Light Poles • Repair Corrugated Pipe Culverts • ETL Wetland Mitigation and Stream Restoration
Upcoming Bid Opportunities Hatem Bridge • Convert facility to All Electric Toll Collection • Replace HVAC
Projects In Design Francis Scott Key Bridge • • Resurface Pavement – Facility-wide Convert to All Electronic Toll Collection Overlay Bridge Decks at Dock Road and CSX Repair Median Barrier and Lighting
Upcoming Bid Opportunities Nice Bridge • Bridge Replacement Project – Preliminary Engineering
Upcoming Bid Opportunities System-Wide Projects • Replace Electronic Toll Collection and Operating System, 3 rd Generation • Replace Closed Circuit TV (CCTV) • Upgrade Fire Alarms and Security Systems • Upgrade/Replace Sign Structures • Install Virtual Weigh Stations
Upcoming Bid Opportunities Facility-Wide Programs for: • Replacement of underground fuel storage tanks with aboveground storage tanks • Repair/Replacement/Sealing of Bridge Decks • Zone and Spot Paint Bridges
Upcoming Bid Opportunities Ongoing On Call Contracts • • Structure Repairs Concrete Repairs Paving Sign Structures Electrical Repairs Facility/Building Repairs Total Maximum Daily Load (TMDL) – Environmental
Future Unfunded Capital Projects I-95 ETL Project – Deferred portions of Section 100 – Section 200 (MD 43 – MD 22) Replacement of the Harry W. Nice Bridge Conversion of all Facilities to Open Road Tolling Bay Bridge Replacement/3 rd Crossing
QUESTIONS? ? ?