Скачать презентацию March 2006 doc IEEE 802 22 -06 0034 Скачать презентацию March 2006 doc IEEE 802 22 -06 0034

566878a546c3f60afe110c5a730ecb8e.ppt

  • Количество слайдов: 6

March 2006 doc. : IEEE 802. 22 -06/0034 r 0 IEEE 802. 22 WRAN March 2006 doc. : IEEE 802. 22 -06/0034 r 0 IEEE 802. 22 WRAN Merger Framework IEEE P 802. 22 Wireless RANs Date: 2006 -03 -07 Authors: Notice: This document has been prepared to assist IEEE 802. 22. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802. 22. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures http: //standards. ieee. org/guides/bylaws/sb-bylaws. pdf including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard. " Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair Carl R. Stevenson as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802. 22 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at patcom@iee. org. > Submission Huawei, Next. Wave, Runcom, STMicroelectronics 1

March 2006 doc. : IEEE 802. 22 -06/0034 r 0 Co-Authors Name Company Paul March 2006 doc. : IEEE 802. 22 -06/0034 r 0 Co-Authors Name Company Paul Piggin Cygnus Jianwei Zhang Huawei Address Phone No. 98, Lane 91, Eshan Road, Pudong Lujiazui Software Park, 86 -21 - Shanghai, China 200127 email zhangjianwei@huawei. com 6864480824638 Eli Plotnik Paragon Israel +972 542 332 255 eli_p@paragon-communications. com Zion Hadad Runcom Israel +972544 560 655 Zionh@runcom. co. il STMicroelectronics 1060 E. Brokaw Rd. San Jose, CA 95131 USA 408 -467 -8436 Liwen. chu@st. com 408 -451 -8137 Kyeongsoo. kim@st. com 408 -451 -8109 george. vlantis@st. com Liwen Chu Kyeongsoo Kim STMicroelectronics 1060 E. Brokaw Rd. San Jose, CA 95131, USA George Vlantis STMicroelectronics 1060 E. Brokaw Rd. San Jose, CA 95131, USA Submission Huawei, Next. Wave, Runcom, STMicroelectronics 2

March 2006 doc. : IEEE 802. 22 -06/0034 r 0 Merger Framework (p. 1 March 2006 doc. : IEEE 802. 22 -06/0034 r 0 Merger Framework (p. 1 of 3) What has been agreed: Sensing: • FCC Regulations & Protection of Incumbents are Top Priority. • All proposed sensing techniques from both merger teams will be included as options in the current draft. No stone will be left unturned. • Selection Procedure based on “Sensing Tiger Team’s” simulation models and comparison criteria will be executed before Draft 1. 0. Each technique will have an equal footing. • It is understood that MAC-level Reporting Techniques could be tailored to the sensing techniques selected. Submission Huawei, Next. Wave, Runcom, STMicroelectronics 3

March 2006 doc. : IEEE 802. 22 -06/0034 r 0 Merger Framework (p. 2 March 2006 doc. : IEEE 802. 22 -06/0034 r 0 Merger Framework (p. 2 of 3) What has been agreed: PHY: • ETRI+et al. OFDMA proposal will be the working document for the merged draft 0. 1. • Scalability: Channel Aggregation and Channel Bonding (up to 3 channels) are to be included as options. • Advanced Coding: Turbo Codes and 802. 16 e LDPC codes have been included as options to the mandatory BCC code. Work on LDPC codeword encoding to be completed. • Beamforming: 802. 16 e Beamforming to be included as an option. • Other PHY improvements to be considered on their technical merits (e. g. Huawei [pilot tones], Motorola [channel sounding, ETRI/Samsung, etc. ) Submission Huawei, Next. Wave, Runcom, STMicroelectronics 4

March 2006 doc. : IEEE 802. 22 -06/0034 r 0 Merger Framework (p. 3 March 2006 doc. : IEEE 802. 22 -06/0034 r 0 Merger Framework (p. 3 of 3) What has been agreed: MAC: • ETRI+et al. proposal will be the working document for the merged draft 0. 1. • Dynamic Frequency Hopping to be included as an option. • Channel resource negotiation using number generation and comparison method of the Spectrum Contention algorithm to be included as an option. • Inter-BS Communication/Co-existence: Bridge CPE, Logical Control Connection and other ideas will be entertained on their merits. • Other MAC improvements to be considered on their technical merits (e. g. Huawei [framing], FT [OFDMA allocation], Thomson channel switching framework etc. ) Submission Huawei, Next. Wave, Runcom, STMicroelectronics 5

March 2006 doc. : IEEE 802. 22 -06/0034 r 0 Steps going forward What March 2006 doc. : IEEE 802. 22 -06/0034 r 0 Steps going forward What has been agreed: • This week confirm “conceptual baseline”, based on presentation material, as a staring point, to give direction for the generation of a single draft. • Work will proceed on draft 0. 1 and successors, pending completion of the “Sensing Tiger Team”, collection of results, and selection of sensing and other techniques. May is the target. • At the completion of this work a confirmation of Draft 1. 0. • Letter Ballot phase begins. 75% of the Working Group to make technical changes. Submission Huawei, Next. Wave, Runcom, STMicroelectronics 6