Скачать презентацию March 2 2005 Commission Meeting FERC Information Assessment Скачать презентацию March 2 2005 Commission Meeting FERC Information Assessment

d883aa24064aebb0d00c53250165f521.ppt

  • Количество слайдов: 22

March 2, 2005 Commission Meeting FERC Information Assessment Team (FIAT) Final Recommendations March 2, 2005 Commission Meeting FERC Information Assessment Team (FIAT) Final Recommendations

Background On January 12, 2004, the Chairman convened an interoffice team (FIAT) and charged Background On January 12, 2004, the Chairman convened an interoffice team (FIAT) and charged the team to assess the Commission’s information needs to promote greater transparency in electricity markets 2

Team Goals • Goal 1: Identify what information is needed to promote greater transparency Team Goals • Goal 1: Identify what information is needed to promote greater transparency in electricity markets • Goal 2: Propose ways to reduce reporting burden through the elimination, reduction, streamlining or reformatting of current information collections • Goal 3: Propose plan to institutionalize continuous Commission-wide review of information needs. 3

Past Year’s Events • One year ago, presented team’s goals to the Commission • Past Year’s Events • One year ago, presented team’s goals to the Commission • In April 2004, submitted Interim Report to the Chairman presenting staffgenerated ideas 4

Past Year’s Events (cont. ) • Designed and sent goal 1 and 2 surveys Past Year’s Events (cont. ) • Designed and sent goal 1 and 2 surveys to FERC staff, Federal agencies, trade associations, NARUC and Federal power authorities • Held follow-up meetings with trade associations 5

Past Year’s Events (cont. ) • In July 2004, summarized survey results for the Past Year’s Events (cont. ) • In July 2004, summarized survey results for the Chairman • In Oct. 2004, reported tentative recommendations to Chairman and senior staff • In Jan. 2005, reached consensus on Final Recommendations 6

Final Recommendations • There are three Goal 1 and seven Goal 2 recommendations ready Final Recommendations • There are three Goal 1 and seven Goal 2 recommendations ready to be drafted into proposed rules • The team has submitted a plan to implement a continuous information review process 7

Goal 1 Final Recommendations 8 Goal 1 Final Recommendations 8

1. Adopt or modify new NERC definitions and methodologies for: • Total Transfer Capability 1. Adopt or modify new NERC definitions and methodologies for: • Total Transfer Capability (TTC) • Available Transfer Capability (ATC) • Transmission Reliability Margin (TRM), with Capacity Benefit Margin (CBM) stated separately by region 9

2. Require the posting on OASIS of: • Standardized definitions of TTC, ATC, TRM, 2. Require the posting on OASIS of: • Standardized definitions of TTC, ATC, TRM, CBM, and • Simultaneous import capability (SIC) 10

3. Obtain standardized, accessible generator run status information on a confidential basis: This information 3. Obtain standardized, accessible generator run status information on a confidential basis: This information is relevant to economic dispatch and market power analyses 11

Goal 2 Final Recommendations 12 Goal 2 Final Recommendations 12

1. FERC Form 73 – Oil Pipeline Service Life Data • Delete outmoded filing 1. FERC Form 73 – Oil Pipeline Service Life Data • Delete outmoded filing procedures • Provide option to file in Excel spreadsheet format • Reduce certain data requirements such as identifying utility codes 13

2. FERC 512 – Application for Preliminary Permit • Change requirement to file progress 2. FERC 512 – Application for Preliminary Permit • Change requirement to file progress report from semi-annually to annually • Eliminate need to identify proposed generation market area and related power system information at preliminary permit stage 14

3. FERC 516/ Order 580 – Nuclear Plant Decommissioning Trust Fund Guidelines § Eliminate 3. FERC 516/ Order 580 – Nuclear Plant Decommissioning Trust Fund Guidelines § Eliminate need for utilities owning nuclear units to file information on each purchase and sale of investments § Require continued internal maintenance of those records 15

4. FERC 520 – Application for Authorization of Interlocking Directorates Require the e-filing of 4. FERC 520 – Application for Authorization of Interlocking Directorates Require the e-filing of FERC 520 data AND. . . 16

Form 561 – Annual Report of Interlocking Directorates FERC 566 – Annual Report of Form 561 – Annual Report of Interlocking Directorates FERC 566 – Annual Report of Utility’s 20 Largest Purchasers • Require submission of information in electronic, web-based format • Create database to crossreference captured information • Coordinate filed information with FERC 520 compliance reviews 17

5. FERC 523 – Application for Authorization to Issue Securities • Convert filing to 5. FERC 523 – Application for Authorization to Issue Securities • Convert filing to electronic, webbased format • Facilitate easier staff financial analyses of filed data 18

6. FERC 576 – Report of Gas Service Interruptions • Update filing methods and 6. FERC 576 – Report of Gas Service Interruptions • Update filing methods and standardize filing format • Provide CEII protection to safeguard pipeline security • Develop filing tracking method • E-notify staff of filings 19

7. FERC 588 – Emergency Natural Gas Sale, Transportation, and Exchange Transactions • Update 7. FERC 588 – Emergency Natural Gas Sale, Transportation, and Exchange Transactions • Update filing method and standardize filing format • Provide CEII protection to safeguard sensitive information • Develop filing tracking method • E-notify staff of filings 20

Goal 3: Create Standing Cross-Office Team Charged with Ongoing Review of New and Current Goal 3: Create Standing Cross-Office Team Charged with Ongoing Review of New and Current Information Needs • Proposed Team Name: ICAT (Information Collection Assessment Team) • Proposed Logo: 21

Team Members • • • Virginia Strasser, Team Leader, OAL Samuel Berrios, Jr. , Team Members • • • Virginia Strasser, Team Leader, OAL Samuel Berrios, Jr. , OMOI William O. Blome, OGC James B. Caruso, OMOI (now retired) Edward J. Fowlkes, OEP Joseph Lynch, OGC Michael P. Miller, OED Patricia Morris, OMOI Michelle E. Veloso, OMTR Nicole Wilson, Signal IT (contractor) 22