March 10, 2010 Preproposal Presentation Testing & Inspection Services - REF March 10, 2010 Preproposal Presentation Testing & Inspection Services - REF

Agenda • • • Introduction Related Projects Project Schedule Site and Building Construction Documents Agenda • • • Introduction Related Projects Project Schedule Site and Building Construction Documents Proposal

QA/QC Philosophy Section 01456 Contractor—Quality Control Program • Testing • Inspection Owner—Quality Assurance Program QA/QC Philosophy Section 01456 Contractor—Quality Control Program • Testing • Inspection Owner—Quality Assurance Program • Testing 24 hours • Inspection 48 hours • Contractor is still responsible

Contract 28: Renewable Energy Facility What’s it all about? Contract 28 builds a 50, Contract 28: Renewable Energy Facility What’s it all about? Contract 28 builds a 50, 600 square foot multi-story building at the Southerly Wastewater Treatment Center to house the following new systems: • Biosolids dewatering and conveyance • Fluidized bed incineration • Steam production using waste heat from incineration • Electricity production using steam This will allow Southerly to abandon its existing thermal conditioning, dewatering and conveyance, and multiple hearth incineration systems.

Contract 28: Renewable Energy Facility Incineration Truck Loading Dewatering Turbine Generator Bldg. Contract 28: Renewable Energy Facility Incineration Truck Loading Dewatering Turbine Generator Bldg.

SOUTHERLY WASTEWATER TREATMENT CENTER SOLIDS HANDLING & INCINERATION DIGESTER “A” TANK GROUP TCSTs SLUDGE SOUTHERLY WASTEWATER TREATMENT CENTER SOLIDS HANDLING & INCINERATION DIGESTER “A” TANK GROUP TCSTs SLUDGE STORAGE TANKS ROAB “B” SITE OF RENEWABLE ENERGY FACILITY CONSTRUCTION STAGING AREA 3 ABANDONED IMHOFF TAKS MAINT. BLDG. CONSTRUCTION STAGING AREA 2 NORTH DELIVERIES THRU ROAD “B” GATE

Scope of Work TCIS-28 (Full Time) 1. Project Resident Chief Inspector – fulltime; supported Scope of Work TCIS-28 (Full Time) 1. Project Resident Chief Inspector – fulltime; supported by coordinating Special Inspector (PE) (As Needed Basis) 1. Specialty Testing Services – Section 01416 2. Construction Inspection Services – all disciplines 3. Shop Witness Testing/Inspection 4. Laboratory Testing Services – Section 01451

Related Project Contract 28 B: Fluidized Bed Incinerator Equipment Procurement Infilco Degremont is supplying Related Project Contract 28 B: Fluidized Bed Incinerator Equipment Procurement Infilco Degremont is supplying equipment for three fluidized bed incinerator trains to be installed under Contract 28 Price: $49, 753, 000

Contract 28 B Integration Issues: • Equipment delivered by IDI will be received by Contract 28 B Integration Issues: • Equipment delivered by IDI will be received by the Contract 28 contractor. • Most of the equipment IDI is supplying will be installed by the Contract 28 contractor. • IDI’s installation responsibilities are limited to: – Construction of fluidized bed incinerator shells and refractory lining of shells’ interiors – Code welding of waste heat boilers • An IDI representative will be on site to provide technical assistance for the installation of IDI-supplied equipment by the Contract 28 contractor. • For IDI-supplied equipment, site visits by manufacturers’ representatives are covered under IDI’s contract. • Contract 28 contractor will assist IDI in start-up and testing of the incinerator trains.

Project Schedule • • Start: June, 2010 28 B Delivery: Oct, 2010 -Oct, 2011 Project Schedule • • Start: June, 2010 28 B Delivery: Oct, 2010 -Oct, 2011 Start Commissioning: Late 2012 Complete Work: 2013

Site Plan TURBINE GENERATOR BIOSOLIDS HANDLING & CONVEYANCE OFFICES TRUCK LOAD-OUT INCINERATION BIOSWALE (1 Site Plan TURBINE GENERATOR BIOSOLIDS HANDLING & CONVEYANCE OFFICES TRUCK LOAD-OUT INCINERATION BIOSWALE (1 OF 3) GRAY WATER CISTERN Building Area = 50, 600 SF; Pavement Area = 29, 800 SF

Building Level Schematic Basement (El. 590. 5) TRUCK LOAD-OUT BIOSOLIDS HANDLING & CONVEYANCE (POLYMER Building Level Schematic Basement (El. 590. 5) TRUCK LOAD-OUT BIOSOLIDS HANDLING & CONVEYANCE (POLYMER SYSTEM) TURBINE GENERATOR INCINERATION MECHANICAL SPACES

Building Level Schematic Ground Floor (El. 605. 5) TRUCK LOAD-OUT SUBSTATIONS BIOSOLIDS HANDLING & Building Level Schematic Ground Floor (El. 605. 5) TRUCK LOAD-OUT SUBSTATIONS BIOSOLIDS HANDLING & CONVEYANCE CONTROL RM. LAB NOTE: IF CROSSED OUT, THERE IS NO FLOOR AT THE LEVEL DEPICTED TURBINE GENERATOR INCINERATION MULTIPURPOSE RM.

Building Level Schematic Second Floor (El. 615. 5 and 620. 5) TRUCK LOAD-OUT MCCs Building Level Schematic Second Floor (El. 615. 5 and 620. 5) TRUCK LOAD-OUT MCCs BIOSOLIDS HANDLING & CONVEYANCE OFFICES (STORAGE BINS, CAKE PUMPS) EL. 620. 5 TURBINE GENERATOR EL. 615. 5 INCINERATION EL. 620. 5

Building Level Schematic Third Floor (El. 635. 5) TRUCK LOAD-OUT ROOF EL. 630. 50 Building Level Schematic Third Floor (El. 635. 5) TRUCK LOAD-OUT ROOF EL. 630. 50 UNASSIGNED BIOSOLIDS HANDLING & CONVEYANCE (CENTRIFUGES) TURBINE GENERATOR INCINERATION COMM. RM. & LOCKER RMS.

Building Level Schematic Roof (El. 650. 5) TRUCK LOAD-OUT ROOF EL. 630. 50 ROOF Building Level Schematic Roof (El. 650. 5) TRUCK LOAD-OUT ROOF EL. 630. 50 ROOF EXTENSION TO ACCOMMODATE OVERHEAD CRANE ON THIRD FLOOR) ROOF EXTENSION TO ACCOMMODATE WASTE HEAT BOILERS

General Building Information: • 1, 057 14 x 73 75 -ton H-piles under Biosolids General Building Information: • 1, 057 14 x 73 75 -ton H-piles under Biosolids Handling & Conveyance, Incineration and Offices • 17 14 x 73 75 -ton H-piles under Truck Loading • 77 14 x 73 90 -ton H-piles under turbine generator • 50 10 x 42 H-piles under biofilter • Nominal 18” thick basement floor slab; thicker at pile layouts and pile caps • Nominal 16” thick concrete perimeter walls from basement floor slab to El. 601. 83 • 31’ x 10’ x 4’ thick isolated concrete pad for turbine generator

General Building Information (Cont. ): • Floor grating (excluding platforms) is limited to portion General Building Information (Cont. ): • Floor grating (excluding platforms) is limited to portion of third floor in Incineration area. Remaining floors are concrete. • One freight elevator; adjacent stairwell extends from basement to roof. • One passenger elevator; adjacent stairwell extends from basement to third floor. • Modified built-up roof system. Metal roof panel system for roof extensions. • Aluminum curtain wall for Office area. • Face brick on masonry block backup for remainder of building.

North Building Exterior North Building Exterior

East Building Exterior East Building Exterior

South Building Exterior South Building Exterior

West Building Exterior West Building Exterior

Contract 28 Bid Documents 3 Drawing Volumes Containing a Total of 903 Sheets Volume Contract 28 Bid Documents 3 Drawing Volumes Containing a Total of 903 Sheets Volume 1 of 3: Title (T) General (G) Demolition (D) Site Civil (C) Process Mechanical (M) Architectural (A) 6 sheets 3 sheets 21 sheets 32 sheets 110 sheets 81 sheets Volume 2 of 3: Title (T) Structural (S) HVAC (H) Plumbing (P) Fire Protection (F) Instrumentation (I) 6 sheets 109 sheets 45 sheets 35 sheets 7 sheets 121 sheets Volume 3 of 3: Title (T) Electrical (E) 6 sheets 321 sheets

Contract 28 Bid Documents 3 Technical Specification Volumes Containing a Total of 269 Individual Contract 28 Bid Documents 3 Technical Specification Volumes Containing a Total of 269 Individual Specification Sections Volume 1 of 3: Div. 1 – General Requirements (49 Sections) Div. 2 – Site Construction (15 Sections) Div. 3 – Concrete (7 Sections) Div. 4 – Masonry (5 Sections) Volume 2 of 3: Div. 5 – Metals (14 Sections) Div. 6 – Wood and Plastics (2 Sections) Div. 7 – Thermal and Moisture Prot. (17 Sections) Div. 8 – Doors and Windows (7 Sections) Div. 9 – Finishes (8 Sections) Div. 10 – Specialities (10 Sections) Div. 11 – Equipment (27 Sections) Div. 12 – Furnishings (3 Sections) Div. 13 – Special Construction (23 Sections)

Contract 28 Bid Documents 3 Technical Specification Volumes Containing a Total of 269 Individual Contract 28 Bid Documents 3 Technical Specification Volumes Containing a Total of 269 Individual Specification Sections Volume 3 of 3: Div. 14 – Conveying Systems (5 Sections) Div. 15 – Mechanical (43 Sections) Div. 16 – Electrical (34 Sections)

Pre-Proposal Communication Information and Data requests • tcis-28@neorsd. org • (March 16 th is Pre-Proposal Communication Information and Data requests • tcis-28@neorsd. org • (March 16 th is the last day)

Proposal Content • Executive Summary (5 pages) • Qualifications (20 pages) – Individuals – Proposal Content • Executive Summary (5 pages) • Qualifications (20 pages) – Individuals – Project Team • Technical Approach (30 pages) • • Local Participation ~ 80% (3 pages) SBE Participation ~ 15% (2 pages) Testing Services Rate Schedule Proposed Overhead Rates: field, office

Evaluation Criteria • Written Qualifications ~ 60% • Written Technical Approach ~ 25% • Evaluation Criteria • Written Qualifications ~ 60% • Written Technical Approach ~ 25% • Presentation & Interview ~ 15% (Optional)

Requirements 15% SBE Goals • Certified List Updated Monthly • Tiffany Jordan, Contract Compliance Requirements 15% SBE Goals • Certified List Updated Monthly • Tiffany Jordan, Contract Compliance Manager 80% Local Requirement Presentation by up to Three (3) Top Ranked Firms (Optional) • 90 minutes for presentation including 30 minutes for questions • Selection committee members will not be announced

THANK YOU FOR ATTENDING! Questions? THANK YOU FOR ATTENDING! Questions?