LRDSS an IT industry perspective Dr Siddhartha Sen. Gupta Tata Infotech Ltd Siddhartha. Sen. LRDSS an IT industry perspective Dr Siddhartha Sen. Gupta Tata Infotech Ltd Siddhartha. Sen. Gupta@Tata. Infotech. com 1

Agenda t Strengths t Possible enhancements? t Commentary - Phase end findings t Tata Agenda t Strengths t Possible enhancements? t Commentary - Phase end findings t Tata Infotech in related work 1. LRDSS project 2. Train Planning, Monitoring & Control 3. Equipment repositioning - loco/wagon availability 4. The "Data problem" - towards analytical quality t The "IT" angle 1. LRDSS is not "IT" - it is Management Science 2. Expectations of Indian “IT” companies Copyright: Tata Infotech Limited 2

LRDSS - Strengths t One of the few Large Scale Analytical Planning tools used LRDSS - Strengths t One of the few Large Scale Analytical Planning tools used by Indian Public Sector t Major aspects covered: R Opportunity: Forecasting business volume & price R Threats: Analyzing competition R Strength/Weakness: Rail technology evaluation R Micro level: Sectional bottleneck analysis R Plan generation R Alternate investment scenario analysis R Project Cost, Revenue & Cash Flow report t Improvement in data quality, backed up by surveys t “Best of breed” analytical approaches t Excellent team Copyright: Tata Infotech Limited 3

LRDSS – enhancements? t System Verification: R Monitoring: Compare prediction against actual Success report LRDSS – enhancements? t System Verification: R Monitoring: Compare prediction against actual Success report on projects evaluated R Valuation: Estimate Ro. I of LRDSS R Goal: LRDSS as a core input to Rail Budget t Some additions/changes R Workflow S. . Z. . B for Business/Price Forecasts R “Rail Technology” to include “ICT” option R “Force multiplication” of Rs 25 KB Loco/wagons 1%=$100 M R Use automated train planning w/ data logger inputs R R RAILS does not optimize (only feasibility check) Use Furness approach also for capacity analysis MINOS is outdated, use GA-based engines Linearize all models Copyright: Tata Infotech Limited 4

LP speed up Copyright: Tata Infotech Limited 5 LP speed up Copyright: Tata Infotech Limited 5

Commentary– Phase findings t ’ 96 Phase I report: R Data unavailability – impacts: Commentary– Phase findings t ’ 96 Phase I report: R Data unavailability – impacts: delay, report quality R “Ambitious” with 3 modules (bugs, integration, . . ) R China Rail 1990 study quoted, but reorganization? Copyright: Tata Infotech Limited 6

Commentary– Phase findings t ’ 00 Phase II report: R Declining profitability – make Commentary– Phase findings t ’ 00 Phase II report: R Declining profitability – make IR unviable? ? R How improve wagon availability? (customer need) R How reduce ops slack? (30% capacity here) R How to “tighten” loco timetables? (capacity issue) R Capacity only answer to bottleneck? ? R Golden Quadrilateral? ? R New trucking technology & improved road load? ? R Improved sectional “capacity” measurement? ? R New ops practices? e. g. heavy MUXing for freight R “Expert Advisors” were suggested for IT – where? R MIS systems were suggested – lack integration Copyright: Tata Infotech Limited 7

Agenda t Strengths t Possible enhancements? t Commentary - Phase end findings t Tata Agenda t Strengths t Possible enhancements? t Commentary - Phase end findings t Tata Infotech in related work 1. LRDSS project 2. Train Planning, Monitoring & Control 3. Equipment repositioning - loco/wagon availability 4. The "Data problem" - towards analytical quality t The "IT" angle 1. LRDSS is not "IT" - it is Management Science 2. Expectations of Indian “IT” companies Copyright: Tata Infotech Limited 8

Projects Oil Tanker Scheduling Copyright: Tata Infotech Limited Oil Coordination Committee INDIA 9 Projects Oil Tanker Scheduling Copyright: Tata Infotech Limited Oil Coordination Committee INDIA 9

Tata Infotech - LRDSS t Supported WB consultants Peter Cook and Bob Leilich R Tata Infotech - LRDSS t Supported WB consultants Peter Cook and Bob Leilich R RAILS simulations R Data cleaning & Optimisation R Short interaction at GIS/Trans and CSI offices R Longer interaction at Railway Board t Lessons R Very low level interaction R No joint planning R Contract work limited to simulations on T&M R Systems replacement options outside scope R Budget / long term plans unknown Copyright: Tata Infotech Limited 10

Tata Infotech Train Ops System Controller Inputs Static Data Field Data OPEN COMMON INTERFACE Tata Infotech Train Ops System Controller Inputs Static Data Field Data OPEN COMMON INTERFACE Simulation Planning Training Graphic Displays: Train Describer Copyright: Tata Infotech Limited O p e r a t io n s M anagem ent Alarms Maintenance Passenger Information Route Control CTC MIS Reports 11

Tata Infotech Train Ops System Train Operations Planning Management • Real-time operations • Avoid Tata Infotech Train Ops System Train Operations Planning Management • Real-time operations • Avoid “Scheduler blues” line blockage • Line Capacity utilisation Copyright: Tata Infotech Limited • Timetabling passenger/freight • Freight train pathing • Realistic simulations 12

The resources t. Timetabled passenger express…. commuter t. Pathed freight heavy…. empty §Medical / The resources t. Timetabled passenger express…. commuter t. Pathed freight heavy…. empty §Medical / breakdown / tool vans §Light engine §Stabled loads §Motor, O/H equipment trolley §TTM machine §Gangman's trolley Copyright: Tata Infotech Limited RTracks mainly single, some double gradients, curvatures DStations passing loops, halt stations ½Signalling absolute block ÉSCADA interfaced to signal panel 13

Stations Trains Copyright: Tata Infotech Limited 14 Stations Trains Copyright: Tata Infotech Limited 14

Copyright: Tata Infotech Limited 15 Copyright: Tata Infotech Limited 15

Sites Copyright: Tata Infotech Limited 16 Sites Copyright: Tata Infotech Limited 16

Infrastructure Planning u Highly congested segment u Passenger & freight u “Double Conventional” line Infrastructure Planning u Highly congested segment u Passenger & freight u “Double Conventional” line operation u “Absolute block” signaling u Operations Managers suggested R addition of 3 rd line u Signal Managers suggested ½ signaling upgradation to Automatic R extension of some station loops t Simulation objective: capacity increase by signaling change Copyright: Tata Infotech Limited 17

More tracks or signaling? station inter-station section station 5 Km Advanced starter Dist 2 More tracks or signaling? station inter-station section station 5 Km Advanced starter Dist 2 Dist 1 Home Double Conventional line 1 Km Advanced starter Home Copyright: Tata Infotech Limited Home Double Conventional line 18

AUTO SIGNALING Simulation results Copyright: Tata Infotech Limited 19 AUTO SIGNALING Simulation results Copyright: Tata Infotech Limited 19

Simulation results analysis t Current traffic pattern + Signal conversion gives 8% - 9% Simulation results analysis t Current traffic pattern + Signal conversion gives 8% - 9% capacity increase t Reason for low increase: ½ Average “Absolute block” section Advanced Starter to Home signal = 5 KM ZZ ½ 4 aspect (R, Y, YY, G) signals at 1 Km 1 st (green) to 4 th (red) signals = 3 Km t Suggested addition of loops on both sides at all stations Copyright: Tata Infotech Limited 20

Agenda t Strengths t Possible enhancements? t Commentary - Phase end findings t Tata Agenda t Strengths t Possible enhancements? t Commentary - Phase end findings t Tata Infotech in related work 1. LRDSS project 2. Train Planning, Monitoring & Control 3. Equipment repositioning - loco/wagon availability 4. The "Data problem" - towards analytical quality t The "IT" angle 1. LRDSS is not "IT" - it is Management Science 2. Expectations of Indian “IT” companies Copyright: Tata Infotech Limited 21

Global Container Logistics Managing 3 PL business Forecasting & Planning, Empty Container Repositioning Copyright: Global Container Logistics Managing 3 PL business Forecasting & Planning, Empty Container Repositioning Copyright: Tata Infotech Limited 22

Global Container Logistics Client in “Buying & selling of Logistics” • World #1 Global Global Container Logistics Client in “Buying & selling of Logistics” • World #1 Global 3 PL in tank containers • Global operations • Multi-commodity Network Flow Driven by Ro. I – optimised asset utilization • Improved sales by 12% • Improved revenue by over $8 M/yr Technology Optimisation, Forecasting & Workflow Work Optimised Repositioning Annual Forecasting & Budgeting Copyright: Tata Infotech Limited 23

Agenda t Strengths t Possible enhancements? t Commentary - Phase end findings t Tata Agenda t Strengths t Possible enhancements? t Commentary - Phase end findings t Tata Infotech in related work 1. LRDSS project 2. Train Planning, Monitoring & Control 3. Equipment repositioning - loco/wagon availability 4. The "Data problem" - towards analytical quality t The "IT" angle 1. LRDSS is not "IT" - it is Management Sciences 2. Expectations of Indian “IT” companies Copyright: Tata Infotech Limited 24

Clean Analytical workbench Models, Parameters Analytical Functions Statistical Processing Optimisation Planner’s Workbench Other MIS Clean Analytical workbench Models, Parameters Analytical Functions Statistical Processing Optimisation Planner’s Workbench Other MIS ERP MIS Systems ETL Accounts & Sales Logistics Yield Mgmnt Analytical Data Marts Management & Accounts Global Sales Intranet Global Operations Copyright: Tata Infotech Limited Budgets Plans Pricing Business Interface 25

Agenda t Strengths t Possible enhancements? t Commentary - Phase end findings t Tata Agenda t Strengths t Possible enhancements? t Commentary - Phase end findings t Tata Infotech in related work 1. LRDSS project 2. Train Planning, Monitoring & Control 3. Equipment repositioning - loco/wagon availability 4. The "Data problem" - towards analytical quality t The "IT" angle 1. LRDSS is not "IT" - it is Management Science 2. Expectations of Indian “IT” companies Copyright: Tata Infotech Limited 26

IT element in LRDSS • LRDSS is NOT an “IT” project (IIT/IIM Depts) 1. IT element in LRDSS • LRDSS is NOT an “IT” project (IIT/IIM Depts) 1. The IT components are secondary 2. The Planning formulation is primary 3. “IT” is not a “Rail Technology” in LRDSS • There are interesting tools/processes 1. Sectional capacity analysis 2. Train Timetabling 3. Train Monitoring & Planning 4. Loco/wagon repositioning 5. Customer Survey Analysis 6. Demand & Price Forecasting Copyright: Tata Infotech Limited 27

Expectations of vendors • • • Contract management Work acceptance criteria Volume, duration & Expectations of vendors • • • Contract management Work acceptance criteria Volume, duration & nature of work Consultancy rates (ref MRVC project) LRDSS budget & timeframes • Suggest • IR-Academia-Industry partnership • Joint planning & execution • Funding reflecting returns/savings Copyright: Tata Infotech Limited 28

Tata Infotech Offerings Analytic Services using these Technologies • Data Analysis (Statistics, Data Mining) Tata Infotech Offerings Analytic Services using these Technologies • Data Analysis (Statistics, Data Mining) • Optimization (OR, Artificial Intelligence) • Rule Based Systems Types of projects • Small-to-mid size, Duration 1 month – 6 months • Innovative/ repetitive work Outsourcing modes • T&M with Tata Infotech Technical Management • T&M with Client Technical Management • Turnkey http: //www. tatainfotech. com/services/optimization/index. htm Copyright: Tata Infotech Limited 29 29