LCLS Overview December 2, 2008 Project Construction Status LCLS Operations Organization Commissioning/Transit to operations LCLS Overview December 2, 2008 Project Construction Status LCLS Operations Organization Commissioning/Transit to operations December 2, 2008 LCLS Accelerator Readiness Review 1 John N. Galayda [email protected] stanford. edu

Linac Coherent Light Source at SLAC Injector (35º) at 2 -km point Existing 1/3 Linac Coherent Light Source at SLAC Injector (35º) at 2 -km point Existing 1/3 Linac (1 km) (with modifications) New e- Transfer Line (340 m) X-ray Transport Line (200 m) Undulator (130 m) Near Experiment Hall (underground) X-Ray Transport/Optics/Diagnos Far Experiment John N. Galayda December 2, 2008 2 LCLS Accelerator. Hall (underground) Readiness Review [email protected] stanford. edu

Construction(TEC) >87% complete December 2, 2008 LCLS Accelerator Readiness Review 3 John N. Galayda Construction(TEC) >87% complete December 2, 2008 LCLS Accelerator Readiness Review 3 John N. Galayda [email protected] stanford. edu

LCLS Injector 100% Complete Beam to the Dump by 12/19 LCLS Linac >96% Complete LCLS Injector 100% Complete Beam to the Dump by 12/19 LCLS Linac >96% Complete Undulator >97% complete Commissioning Complete 3/2008 Commissioning Complete 9/2007 ARR December 2, 2008 LCLS Accelerator Readiness Review 4 John N. Galayda [email protected] stanford. edu

1. 9 Conventional Facilities >87% complete Turner Construction Co. >95% complete Undulator Hall (175 1. 9 Conventional Facilities >87% complete Turner Construction Co. >95% complete Undulator Hall (175 m) Beam Dump (40 M) Linac-to-Undulator (227 m) Front End (29 m) Far Expt’l. Hall Near Expt’l. Hall X-ray Transport (200 m) 14 m Near Experimental Hall December 2, 2008 LCLS Accelerator Readiness Review 64. 6 m 5 John N. Galayda [email protected] stanford. edu

CD-4 (7/31/2010) First Light in FEH Hutch BO X-Rays in NEH First Light in CD-4 (7/31/2010) First Light in FEH Hutch BO X-Rays in NEH First Light in FEE Install Undulators FEE/NEH Install PPS Cert. LTU/Dump now LTU/Und Install PEP-II run ends LCLS Installation and Commissioning Time-Line PPS J F M A M J J A S ON D J F M A M J J Down? 2008 2009 2010 Linac/BC 2 Commissioning LTU/Und NEH Ops & Commissioning Re-establish FEL/FEE e- to SL 2 Commissioning December 2, 2008 LCLS Accelerator Readiness Review 6 Nov. 3, 2008 John N. Galayda [email protected] stanford. edu

PROJECT SAFETY EXPERIENCE Through October 2008 DART Rate Total Project Hours 2, 045 M PROJECT SAFETY EXPERIENCE Through October 2008 DART Rate Total Project Hours 2, 045 M Hours worked Sub. Contractors 579 K Hours worked DART Rate 3. 1 (9 Incidents) TRC Rate 4. 1 (3 Incidents) LCLS Collaboration 1, 466 K Hours worked DART Rate 0. 27 (2 Incidents) . Injury rates based on 200 K hours (100 man years) of effort DOE/SC Goal is a Reportable Case (TRC) rate of < 0. 25 and a Days Away, Restricted, or Transferred (DART) rate < 0. 65 per 100 FTEs. December 2, 2008 LCLS Accelerator Readiness Review 7 John N. Galayda [email protected] stanford. edu

LCLS Construction Project Organization December 2, 2008 LCLS Accelerator Readiness Review 8 John N. LCLS Construction Project Organization December 2, 2008 LCLS Accelerator Readiness Review 8 John N. Galayda [email protected] stanford. edu

LCLS Project Now Incorporated in the LCLS Directorate Organization LCLS Directorate Define and deliver LCLS Project Now Incorporated in the LCLS Directorate Organization LCLS Directorate Define and deliver the transformational potential of Ultrafast photon science through efficient and effective operation of the Linac Coherent Light Source as a BES User facility Accelerator Systems Division Experimental Facilities Division Deliver the LCLS quality beam in a sustainable and efficient manner that meets the needs of the user program Deliver the instrument systems and user administration activities necessary for efficient performance of a user based research program Business Office Engineering Physics Division Strategic Projects Division Deliver the enabling Infrastructure necessary for efficient operation of LCLS Deliver the approach, resources, and standards, to optimize the configuration of LCLS in a reliable, available, and maintainable manner Deliver the planning and implementation of next generation upgrades and major modifications of LCLS December 2, 2008 LCLS Accelerator Readiness Review 9 John N. Galayda [email protected] stanford. edu

Staff assigned on matrix basis from other organizational elements of LCLS and SLAC LCLS Staff assigned on matrix basis from other organizational elements of LCLS and SLAC LCLS Project Management Roles/Responsibilities continue through commissioning process December 2, 2008 LCLS Accelerator Readiness Review 10 John N. Galayda [email protected] stanford. edu

Organizational Responsibilities Dave Schultz has taken on these Project Responsibilities for Electron Beam Systems Organizational Responsibilities Dave Schultz has taken on these Project Responsibilities for Electron Beam Systems Fully integrated with existing SLAC accelerator operations/maintenance systems in design and handover Safety Assessment Document Now incorporated in SLAC SADs Readiness Process December 2, 2008 LCLS Accelerator Readiness Review 11 John N. Galayda [email protected] stanford. edu

Organizational Responsibilities Accelerator Systems Division Accommodate/control the interaction between LCLS Project activities and accelerator Organizational Responsibilities Accelerator Systems Division Accommodate/control the interaction between LCLS Project activities and accelerator operations Incorporate new LCLS Systems into existing SLAC operations & work control Area management responsibilities for newly constructed facilities Configuration control Enforce requirements for beam authorization Support LCLS Commissioning Team activities Limits on ASD authority to produce beam are specified in the Beam Authorization Sheet Key upper limits on electron-beam power/energy operation are set by Radiation Safety Officer for each run December 2, 2008 LCLS Accelerator Readiness Review 12 John N. Galayda [email protected] stanford. edu

Organizational Responsibilities LCLS Project Commissioning Team Paul Emma leading for Electron Beam Systems Paul’s Organizational Responsibilities LCLS Project Commissioning Team Paul Emma leading for Electron Beam Systems Paul’s group now has Engineering/Physics Division (EPD) as its administrative/operations home Plans technical/physics aspects of LCLS commissioning Fulfill CD-4 performance requirements Accountable to Project for achievement of commissioning goals Post-commissioning, Paul’s group supports LCLS Directorate goals as part of EPD Support LCLS Experiment Program, expand/improve performance of the FEL December 2, 2008 LCLS Accelerator Readiness Review 13 John N. Galayda [email protected] stanford. edu

Technical goals for activities addressed by this Readiness Review December 2, 2008 LCLS Accelerator Technical goals for activities addressed by this Readiness Review December 2, 2008 LCLS Accelerator Readiness Review 14 John N. Galayda [email protected] stanford. edu

X-Ray Transport/Optics/Diagnostics WBS 1. 5 is >80% complete Front end X-ray optics being assembled X-Ray Transport/Optics/Diagnostics WBS 1. 5 is >80% complete Front end X-ray optics being assembled All mirrors delivered; mirror figures meet spec LLNL Most diagnostics under assembly at LLNL Gas Detector Hard x-ray Monochromator (K Spectrometer) Solid Attenuator Slit Gas Attenuator e- Muon Shield Gas Detector LCLS Accelerator Readiness Review Soft X-Ray Offset mirror system Direct Imager Pulse Energy Thermal Detector Hard X-Ray Offset mirror system Start of Experimental Hutches First use ~3/2009 December 2, 2008 5 mm collimator 15 John N. Galayda [email protected] stanford. edu

Near Experiment Hall Hutch 3 December 2, 2008 LCLS Accelerator Readiness Review 16 John Near Experiment Hall Hutch 3 December 2, 2008 LCLS Accelerator Readiness Review 16 John N. Galayda [email protected] stanford. edu

Schematic of AMO Instrument • Build/buy and assemble – • Assembly & Testing – Schematic of AMO Instrument • Build/buy and assemble – • Assembly & Testing – • Ready for first light – Jul-Dec Feb-Jun Jul 2008 2009 Find out what will be July 2010 December 2, 2008 LCLS Accelerator Readiness Review 17 John N. Galayda [email protected] stanford. edu

Installing re-bar in the Far Experimental Hall December 2, 2008 LCLS Accelerator Readiness Review Installing re-bar in the Far Experimental Hall December 2, 2008 LCLS Accelerator Readiness Review 18 John N. Galayda [email protected] stanford. edu

10/15/08 December 2, 2008 LCLS Accelerator Readiness Review 19 John N. Galayda galayda@slac. stanford. 10/15/08 December 2, 2008 LCLS Accelerator Readiness Review 19 John N. Galayda [email protected] stanford. edu

End of Presentation Materials Thanks to: SLAC ANL LLNL Jess Albino Geoffrey Pile Richard End of Presentation Materials Thanks to: SLAC ANL LLNL Jess Albino Geoffrey Pile Richard Bionta John Arthur Bill Berg Donn Mc. Mahon Paul Emma Marion White Tom Fornek David Saenz David Schultz December 2, 2008 LCLS Accelerator Readiness Review 20 John N. Galayda [email protected] stanford. edu