Tier 1 CMS center in JINR was initiated by the project “Creation of an automated system for data processing of LHC experiments at Tier 1 level and provision of grid-services for distributed analysis of these data”, within the federal target program (FTP) of the RF Ministry of Education and Science “Research and developments on priority directions of the development of the scientific and technological complex of Russia on the years 2007 -2013”
The September 28, 2012 session of the WLCG Overview Board approved the plan of creating a Tier 1 -level center in Russia. The project foresees a staged gradual implementation. The first stage ended in December 2012. A Tier 1 prototype was created at NRC “Kurchatov Institute” and at JINR. The next stage (November 2014) provides the final deployment of the complex and commissioning of the full-scale Tier 1 center in JINR.
JINR: current state • Our Tier-1 currently supports CMS as the tape-less Tier-1 since October 2013; • Our resources were fully validated; • Our Tier-1 participates in CMS Multicore job scheduling project: o Able to run multicore glideins (12 cores) through two queues as of April 29 th o Large scale tests at Tier 1 s • Our Tier-1 was tested for high memory (6 GB) jobs
JINR: INSTALLED SERVICES Computing: 1200 cores (17 K HS 06) Storage: Disk-only d. Cache , 450 TB; d. Cache for MSS , 130 TB pools + 72 TB tapes FTS 2. 2. 8 Ph. EDEx 4. 1. 2 for disk-only d. Cache and MSS Argus server 2 x Frontier Squids site BDII and top-level BDII UI, My. Proxy, WMS, LB, LFC for internal testing All services run EMI-3 GOCDB: https: //goc. egi. eu/portal/index. php? Page_Type=View_O bject&object_id 0431&grid_id=0 T 1_RU_JINR и T 1_RU_JINR_Disk Site. DB: https: //cmsweb. cern. ch/sitedb/prod/sites SITECONF/T 1_RU_JINR/Job. Config and SITECONF/T 1_RU_JINR/Ph. EDEx in git.
SOFTWARE ОS Scientific Linux release 6 x 86_64, Scientific Linux release 5 x 86_64 for Phedex. WLCG services EMI 3 sl 6 x 86_64. WLCG sl 5 x 86_64 VOBOX for Phedex. Batch Torque 4. 2. 7 (home made) Maui 3. 3. 2 (home made) Storage dcache-2. 2. 26 (dcache. org) + enstore-3. 0. 0 on MSS dcache-2. 6. 30 (dcache. org) on Disk xrootd-3. 3. 6 for CMS AAA federation
A. S. Baginyan: A highly reliable data center network topology Tier 1 at JINR - -1. 07. 2014 – GRID’ 2014 7
8
JINR: RELIABILITY AND AVAILABILITY
JINR SITE USABILITY BASED ON THE NAGIOS TESTS [SUM] JINR: STATUS AT CMS SUM PORTAL
T 1_RU_JINR: Site Readiness Status 11
JINR: RUNNING JOBS
Overall Job CPU Efficiency and Job Success Rate 13
CMS T 1 JOB COMPLETED (LAST MONTH) T 1_RU_JINR (230 669) Job Efficiency T 1_RU_JINR (6. 06%) 14
CMS T 1 SITE ACTIVITY SUMMARY (UTILIZATION LEVEL)
16
One month Multicore Jobs from one monitor 17
CMS T 1 DATA TRANSFER downloading CMS T 1 uploading JINR CMS T 1 Total: 300 TB
CMS AAA ( CMS xrootd federation) link traffic on JINR T 1 19
20
The Tier 1 centre at JINR is an important and prestigious project for the JINR member states. The resources and experience acquired while creating the Tier 1 center will be used for data processing and storage for the accelerator complexes NICA, FAIR and others