IT'S BY FAITH Building Project will cater to long felt needs of Indiranagar Methodist Church, Bangalore. Following were the needs 1. Sunday School Assembly area and Class Rooms 2. Church Office and Meeting rooms 3. Parsonage for Pastors 4. Multipurpose Hall The Building project has been taken up in 2 phases Phase 1 – Main Building – Ground + 3 floors ( 4000 Sft/ floor) – Total 16, 000 sft Phase 2 - Toilet Block / Stores etc
THE IDEA OF A NEW MULTI PURPOSE BUILDING JULY 2011 BUILDING PLAN APPROVAL MAY 2012 FINAL DESIGN NOV 2012
GROUND BREAKING CEREMONY BY Bishop Dr. Taranath S Sagar On 3 rd March 2013
AN ARTIST’S IMPRESSION OF THE BUILDING
TEMP TOILET BLOCK T O I L E T B L O C K SILVER JUBILEE BLOCK Phase-1 E X I S T I N G EXISTING CHURCH L A W N Ph 2 TEMP CHURCH OFFICE TEMP SUNDAY SCHOOL BLOCK PLAN OF THE NEW BUILDING – Phase 1 & Phase 2
SECURITY TRANSFORMER PORTICO TOILET(G) TOILET(L) MEDICAL/ STORES NURSING PANTRY DRIVE WAY GROUND FLOOR PLAN Ground Floor will consist of CAR PARKING, TOILETS, etc.
SUNDAY CLASS STORES GREEN ROOM BALCONY MULTI PURPOSE HALL STAGE GREEN ROOM FIRST FLOOR PLAN HALL CAPACITY - 300 ( appx), Will be used by SS, Church services ( Virtual Church), VBS programs, retreats, seminars, functions etc.
OPEN TERRACE TOILETS SENIOR PASTOR OFFICE BALCONY ASSO PASTOR JR. PASTOR VISITORS SUNDAY CLASS SUNDAY CLASS/ BREAK OUT SUNDAY CLASS/ BREAK OUT CONFERENCE SECOND FLOOR PLAN Sunday School Block, Church offices, Meeting/ Conference rooms etc.
BED ROOM LIVING BALCONY DINING ASSO. PASTOR’s HOUSE OPEN SPACE BED ROOM SENIOR PASTOR’s HOUSE LIVING KITCHEN DINING KITCHEN BED ROOM THIRD FLOOR PLAN Parsonage – Senior Pastor / Asst. Pastor
TERRACE FLOOR PLAN Open terrace – Planned a temporary roof at a later stage and can be used for functions etc. Capacity – 400 ( appx)
SALIENT FEATURES * Multipurpose Hall will be used by Sunday School for Opening session, VBS etc. * Hall will also be used during Church service as a Virtual Church, and for retreats, seminars, functions etc. * Sunday School Block with 12 classrooms equipped with the latest audio/visual eqpt * State of art conference room PRES * Green building – Maximum use of Natural light, Solar energy and rain water harvesting
COST OF CONSTRUCTION Phase I 340 lakhs (appx'ly) (Main Building. Total area – 16, 000 sft) Phase 2 (Toilet/ Stores) 60 lakhs (appx'ly) TOTAL COST 4 Crore ( appx'ly)
ACTUAL WORK STARTED COMPLETION TIME ( Phase I- Main Building ) PRESENT POSITION COMPLETION TIME NOV '13 15 Months (Jan' 2015 ) Phase 1 FOUNDATION COMPLETED AS ON FIRST WEEK OF FEB'14