International Workshop on “ Best Practices in Methane Drainage and Use in Coal mines” CBM Activities by ONGC Ranchi 09. 03. 2017
CBM – Indian scenario CBM BLOCKS AWARDED IN INDIA • 33 CBM Blocks thru’ 4 bidding rounds including 3 by nomination. • Total CBM Resource in awarded blocks~ 62. 4 TCF Operator ONGC 4 ONGC-IOC 2 ONGC-CIL 2 ONGC-GSPCL 1 RIL 5 ESSAR OIL 5 GEECL 2 Arrow 5 BP 1 REL – RNRL 4 Coal Gas Mart Deep Inds 2 Blocks 2 • Established GIP ~ 9. 9 TCF • Commercial Production ~ 1 MMSCM #2 E&P Company in the world
Search for CBM in India by ONGC ü ONGC is the pioneer: DU#1 and DU#2 in Raniganj Coalfield in 1995 ü Attention shifted to Jharia Coalfield ü 4 wells drilled: JH#1, JH#2, JH#3, JH#4 (1997 -1999) ü All 4 wells test flowed gas: JH#1 - the 1 st producing CBM well in India. ü Present incidental CBM production from Jharia ~10 mscmd ü Produced more than 18. 7 MMSCM CBM till date ü Nine Blocks originally awarded to ONGC ü ONGC presently operates in four CBM Blocks 3 #2 E&P Company in the world
CBM Blocks Awarded to ONGC Sl. No. Block Name State Area (Sqkm) CIIP (BCM) Awardee Remarks I. Nomination Basis 1 RANIGANJ West Bengal 311. 8 7. 43 ONGC-CIL (74: 26) FDP approved (23/04/2013) 2 JHARIA Jharkhand 65. 1 22. 71 ONGC-CIL (90: 10) / (74: 26) FDP approved (23/04/2013) ONGC-IOC (80: 20) FDP approved (21/01/2013) FDP approved (25/09/2012) II. Through Bidding BOKARO 3 (BK-CBM-2001/I) Jharkhand 75 30. 12 Jharkhand 271. 5 22. 93 4 N. KARANPURA 5 SK-CBM-2003/II Jharkhand 70 ONGC-IOCPEPL (55: 20: 25) ONGC 6 NK(W)-CBM-2003/II Jharkhand 267 ONGC 7 BS(3)-CBM-2003/II Gujarat 790 ONGC-GSPCL 8 ST-CBM-2003/II Madhya Pradesh 714 ONGC Relinquished 9 WD-CBM-2003/II Maharashtra 503 ONGC Relinquished (NK-CBM-2001/I) Relinquished • 45 wells and 78 coreholes drilled during exploration • 83 BCM, CBM In-place established 4 A FORTUNE Global 500 Company
CBM Blocks of ONGC N. Karanpura Bokaro Jharia 5 Most valuable Indian PSU Raniganj
Status of CBM Blocks Block/ State Bokaro (Jharkhand) FDP Dev. Approved Wells by SC Plan 23. 01. 13 North Karanpura 25. 09. 12 141 ML Status Granted (04. 09. 15) Granted 68 (31. 07. 15) (Jharkhand) Jharia (Jharkhand) Raniganj (W. Bengal) 6 23. 04. 13 72 Granted (30. 07. 15) EC Status Development operations Granted by Mo. EF wef to commence in Q 1 of 28. 03. 16 2017 -18. Development operations EC granted by Mo. EF to commence in Q 1 of wef 12. 05. 15 2017 -18. 19 th EAC of Mo. EF&CC recommended grant of EC. Formal grant expected shortly. 80 Commencement of Development depends on Overlap issue with Parbatpur Coal Block. Go. WB advised to EIA completed. Public with Go. WB hearing planned (after resubmit PML and exclude BAPL overlap elections) area. Pending 23. 04. 13 Remarks A FORTUNE Global 500 Company
Development Plans at a Glance Block No. of Dev. Wells Production Installations Approximate Development Cost (INR Cr) Plateau Production (MMSCMD) Bokaro 141 1 GCS, 2 EPS 2421 0. 75 North Karanpura 68 3 GCS 1536 0. 3 Jharia 72 5 GCS 1140 0. 6 Raniganj 80 4 GCS 950 0. 3 Total 366 15 ~ 6547 ~2 7 #2 E&P Company in the world
FDP production profiles Year-wise Combined Gas Production Rate and Cumulative Production-FDP 12 10 2 8 1. 5 6 1 4 0. 5 2 0 0 Combined Cummulative Gas Production(BCM) Combined Gas Production Rate(MMSCMD) 2. 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Year 8 #2 E&P Company in the world Combined Gas Production Rate (MMSCMD)
Title of the slide Basic CBM – Business premises § CBM is a front loaded, marginal economics play. § Almost entire CAPEX within a span of 3 -4 yrs - Wells and Surface facilities to be installed early followed by dewatering and CBM production. Potential § CBM production is in early stages. Several fold increase expected when all the blocks start producing in tandem. § Growth driver- CBM occurrence mostly in conventional HC starved area. § CBM is ‘Clean’ form of energy – Increase in Carbon credits. Challenges § Technical: Indian coal basins more heterogeneous and deformed compared to US/Australian counterparts. Continuous R&D and Ingenuity required. § Socio- Economic: LAQ, CSR, Local Awareness etc. Crucial for success. § Policy issues: Favorable Gas pricing will enhance project viability and participation. Overlapping issues with Coal Blocks – clarity on priority & guideline necessary. 9
Title of the slide ONGC Opportunity for Location: ONGC’s four CBM blocks i. e. North Karanpura, Bokaro, Jharia and Raniganj falls in HC starved regions of Jharkhand & West. Bengal – Existing demand for cleaner form of energy for domestic & commercial use. Proximity to Industrial Hubs: Industrial towns of Ranchi, Bokaro, Dhanbad, Asansol, Durgapur falls around these blocks. Establishing a sustainable CBM production is bound to spur its market growth. Proposed Pipeline Project of GAIL: Proposed Jagadishpur-Phulpur-Haldia pipeline will be passing along the CBM Blocks. There is also plan for establishing CGD network in Ranchi, Dhanbad, Singhbhum etc. from this proposed pipeline. 10 # 21 Energy Company in the World
Interference of CBM and Coal Mining § Overlap with Coal Blocks several ONGC CBM Blocks: Ø Parbatpur Coal Block – Jharia CBM Block ØIchchapur & Moira-Madhujore – Raniganj CBM Block § Issues in Simultaneous mining of Coal & CBM. Ø Safety of operations Ø Technological constraints Ø Optimum utilization of natural resources 11 #2 E&P Company in the world
Case Study – Jharia CBM Block Map of Jharia CBM block showing overlapping Parbatpur Coal Block and FDP wells Parbatpur Coal Block Production Hubs § Overlap area with Parbatpur Coal block of SAIL: ~ 8. 0 Sq. Km. § Effect: 27 FDP wells; 10 BCM CIIP. § CBM & Coal Mining activity suspended by DGMS since July, 2014. 12 A FORTUNE Global 500 Company
DGMS suggestion for resolution § Separate working area for ONGC-CIL & SAIL § ONGC-CIL to extract CBM from shallower seams § ONGC-CIL & SAIL to share mine plan to minimize future interference. 13 # 21 Energy Company in the World
THANK YOU
Conditions for Sale of CBM Gas § § § Delivery at Arms Length – at the fence of ONGC production premises. ONGC shall deliver the gas at 0. 5 Kg/cm 2 to 1. 5 kg/cm 2. CBM Gas to be sold at ONGC discovered price and as approved by Go. I. 15