IEEE ITS and Related Standardization Activities ITU-T CITS December 6, 2017 T. M. Kurihara, IEEE ITS and Related Standardization Activities ITU-T CITS December 6, 2017 T. M. Kurihara, Chair, IEEE 1609 WG [email protected] com 1

Content § § § IEEE 1609 Project update Related Information slides IEEE 1609 Working Content § § § IEEE 1609 Project update Related Information slides IEEE 1609 Working Group Meetings – Completed. November 7 -8, Qualcomm, Sorrento Valley, CA – Planned. February 2018, hosted by Qualcomm and preceding collocated SAE DSRC Technical Committee meeting – Standing teleconference, first Wednesday monthly PSID Sub-group – Review, recommend approval of requests for PSIDs to IEEE Registration Authority, cancel if no requests 2

P 1609 Project Status Update § IEEE Published Standards – IEEE 1609. 2™-2016 -- P 1609 Project Status Update § IEEE Published Standards – IEEE 1609. 2™-2016 -- WAVE - Security Services and Message Sets – IEEE 1609. 2 a™-2017 -- WAVE – Security Services and Message Sets – Amendment 1 – IEEE 1609. 4™-2016 -- WAVE - Multi-channel Operations – IEEE 1609. 3™-2016 -- WAVE - Networking Services – IEEE 1609. 12™-2016 -- WAVE - Identifier Allocation – Note: Reference baseline for NHTSA NPRM § Revision of IEEE Std 1609. 0™-2012 – WAVE Architecture, in development, align to contents of 1609 standards published in 2016 – REVCOM submission in 2018 3

P 1609. 12 Revision Project § Create process and procedures for requesting, allocating, and P 1609. 12 Revision Project § Create process and procedures for requesting, allocating, and maintaining a register of Provide Service Identifier (PSID), considerations include: – IEEE Registration Authority Committee (RAC) Policy, Terms of Reference, and Conventions § IEEE 1609 WG PSID sub-group (SG) structure, composition, roles and responsibilities, part of RAC process (proposed) – Remove allocated PSID list from standard, post to IEEE RAC site – Establish process for IEEE 1609 WG to review, approve requests for allocation of PSIDs collaborating with SAE J 2735 TC, and coordinate posting of approved identifiers with IEEE RAC Administrator § Coordination for international allocations of PSIDs (a. k. a. , ITS -AID) to follow and in collaboration with US-EC HTF, HTG#7 task for a global ITS registries and ISO TC 204 WG 1

Proposed Revision of 1609. 3 -2016 § Determined revision required – formal clarification of Proposed Revision of 1609. 3 -2016 § Determined revision required – formal clarification of informal guidance notes (technical clarifications) developed since December 2016 – keeping in mind to preserve backwards compatibility with 2016 version – alignment with 1609. 0 terminology discussions – cleanup ASN. 1 in Annexes J, K, L – some updates to 1609. 2 related info, e. g. , security profile template – PAR submission scheduled December 2017 § revision scheduled for sponsor ballot 2018 § approval for publication in 2019 5

IEEE 1609. 2™-2016, Security Services and Message Sets § IEEE Std 1609. 2 a™ IEEE 1609. 2™-2016, Security Services and Message Sets § IEEE Std 1609. 2 a™ 2017, Amendment 1, with errata and guidance notes (technical clarifications) published in October 2017 § P 1609. 2 b, Amendment 2, errata and guidance notes (technical clarifications) in development § P 1609. 2. 1, Part 1 - Certificate Management Interfaces for End-entities, in development based on research study conducted by CAMP § ETSI TS 103 097 developed as profile of IEEE Stds 1609. 2 and. 2 a, approved in 2017 6

Liaison Activities § SAE DSRC TC – collocated meetings, joint members § SAE C-V Liaison Activities § SAE DSRC TC – collocated meetings, joint members § SAE C-V 2 X TC – joint members § ISO TC 204 – contributions developing requirements for registration authority (ISO 17419 -2) required by ISO Directives – PSID and ITS-AID register joint informal management § CEN TC 278 – Observer, WG 17, Urban ITS § ETSI TC-ITS – Partner SDO 7

Supplemental Information § National ITS Architecture V 8. 0 is ARC-IT, Architecture Reference for Supplemental Information § National ITS Architecture V 8. 0 is ARC-IT, Architecture Reference for Cooperative and Intelligent Transportation § NHTSA Proposed Rule-Making – Opinion § Connected Vehicle (CV) Pilot Programs – Estimated RSUs and DSRC radios § IEEE SCC 42 Projects List

Architecture Reference for Cooperative and Intelligent Transportation (ARC-IT) Enterprise - Describes the relationships between Architecture Reference for Cooperative and Intelligent Transportation (ARC-IT) Enterprise - Describes the relationships between organizations and the roles those organizations play within the connected vehicle environment Functional - Describes abstract functional elements (processes) and their logical interactions (data flows) that satisfy the system requirements Physical - Describes physical objects (systems and devices) and their functional objects as well as the high-level interfaces between those physical objects Communications - Describes the layered sets of communications protocols that are required to support communications among the physical objects that participate in the connected vehicle environment www. arc-it. net Version 8. 0 of National ITS Architecture, ARC-IT, Includes Connected Vehicle ITS Reference Architecture (CVIRA) 9

NHTSA Proposed Rule-Making § Proposed regulatory requirements for light vehicles – Federal Register / NHTSA Proposed Rule-Making § Proposed regulatory requirements for light vehicles – Federal Register / Vol. 82, No. 8 / Thursday, January 12, 2017 / Proposed Rules § Comment period for NPRM closed – October 2016 – Comments being assessed – Docket No. NHTSA– 2016– 0126 § Uncertain when and what the next step will be – – – Political considerations, “no new regulations” Unclear about transportation policy direction Business interests with alternative technology § Result, when published will state a date when all new vehicles are required to have 5. 9 GHz radio system and broadcast Basic Safety Messages (BSMs) § Opportunity for after-market devices 10

Connected Vehicle (CV) Pilot Programs § New York City - Manhattan and Brooklyn § Connected Vehicle (CV) Pilot Programs § New York City - Manhattan and Brooklyn § State of Wyoming, Interstate I-80 Corridor § State of Florida, Tampa Bay Hillsborough Expressway Authority (THEA) and downtown Tampa Bay 11

NYCDOT – Devices Roadside Unit (RSU) at Manhattan and Brooklyn Intersections and FDR Drive NYCDOT – Devices Roadside Unit (RSU) at Manhattan and Brooklyn Intersections and FDR Drive Estimated Number 353 Taxi Equipped with Aftermarket Safety Device (ASD)* 5, 850 MTA Fleet Equipped with ASD* 1, 250 UPS Truck Equipped with ASD* 400 NYCDOT Fleet Equipped with ASD* 250 DSNY Fleet Equipped with ASD* 250 Vulnerable Road User (Pedestrians/Bicyclists) Device 100 PED Detection System 10 + 1 spare Total Equipped Vehicles 8, 000 www. its. dot. gov/pilots/wave 1. htm http: //www. fdot. gov/traffic/Doc_Library/PDF/USDOT%20 RSU%20 Specification%204%201 _Final_R 1. pdf 12 12

ICF/WYDOT – Devices Estimated Number Roadside Unit (RSU) 75 WYDOT Fleet Subsystem On-Board Unit ICF/WYDOT – Devices Estimated Number Roadside Unit (RSU) 75 WYDOT Fleet Subsystem On-Board Unit (OBU) 100 Integrated Commercial Truck Subsystem OBU 150 Retrofit Vehicle Subsystem OBU 25 Basic Vehicle Subsystem OBU 125 Total Equipped Vehicles 400 www. its. dot. gov/pilots/wave 1. htm 13

Tampa (THEA) – Devices Roadside Unit (RSU) at Intersection Estimated Number 40 Vehicle Equipped Tampa (THEA) – Devices Roadside Unit (RSU) at Intersection Estimated Number 40 Vehicle Equipped with On-Board Unit (OBU) 1, 500 Pedestrian Equipped with App in Smartphone 500 HART Transit Bus Equipped with OBU 10 TECO Line Street Car Equipped with OBU 10 Total Equipped Vehicles 1, 520 www. its. dot. gov/pilots/wave 1. htm 14

IEEE SCC 42 Projects § P 2040 -series projects for CV and AV (limited IEEE SCC 42 Projects § P 2040 -series projects for CV and AV (limited progress), includes: – P 2040, Standard for Connected, Automated and Intelligent Vehicles: Overview and Architecture – P 2040 -1, Standard for Connected, Automated and Intelligent Vehicles: Taxonomy and Definitions – P 2040 -2, Standard for Connected, Automated and Intelligent Vehicles: Testing and Verification – Research Task Groups: § § TF 1. Cybersecurity in Transportation Task Force TF 2. Road Electrification Task Force TF 3. Unmanned Airborne Vehicles in Transportation Task Force AG 1. Global Policy Advisory Group 15

Thomas M Kurihara TKstds Management tkstds@mindspring. com Chair, IEEE 1609 Working Group Wireless Access Thomas M Kurihara TKstds Management [email protected] com Chair, IEEE 1609 Working Group Wireless Access in Vehicular Environment (WAVE) IEEE Vehicular Technology/ Intelligent Transportation Systems (VT/ITS)