Скачать презентацию HW IPE ASC at TPU Geological Operations Reservoir Скачать презентацию HW IPE ASC at TPU Geological Operations Reservoir

05_Geological Operations.pptx

  • Количество слайдов: 17

HW IPE ASC at TPU Geological Operations Reservoir Concepts Module MSc REM 2016 -17 HW IPE ASC at TPU Geological Operations Reservoir Concepts Module MSc REM 2016 -17 Chapter 5 Patrick Corbett Sergei Parnachev

HW IPE ASC at TPU Content l Wellsite Geologist – – Role and responsibilities HW IPE ASC at TPU Content l Wellsite Geologist – – Role and responsibilities Mud logging principles and interpretation Core handling and description Wireline log supervison and interpretation

HW IPE ASC at TPU Wellsite Geologist Role l l Reporting progress results and HW IPE ASC at TPU Wellsite Geologist Role l l Reporting progress results and any unexpected happenings to rig and office Supervision: – – l mudloggins/wireline crews, coring and logging operations Technical: – – – independent lithology and shows assessment relation of bit position to the stratigraphy known from nearby wells and seismic prognosis updating (informing crew) wellsite information integration (e. g. biostratigraphy, grainsize, MWD, LWD) for geosteering operations – catching and sending cutting samples to the lab checking mudlog and equipment calibration

HW IPE ASC at TPU Mudlogging 1. 2. 3. 4. 5. 6. 7. 8. HW IPE ASC at TPU Mudlogging 1. 2. 3. 4. 5. 6. 7. 8. Gas types and levels in the mud Pit level monitoring Mud properties (density, T, etc) inlet/outlet Drilling parameters (WOB, rpm, torque, etc) monitoring Cuttings description Cutting fluorescence (“shows”) Shale density Calcimetry (total and specific carbonate content) Primary importance (safety issues) • wellbore cement characteristics • occurrence of metal • mud additivities • rock flour • lag time Geological Issues

HW IPE ASC at TPU Mudlogging 1. 2. 3. 4. 5. Derbrandes, 1985 Dolomite HW IPE ASC at TPU Mudlogging 1. 2. 3. 4. 5. Derbrandes, 1985 Dolomite (calcimetry reading, visible PHI and K, gas reading) Thin sands (gas reading is diagnostic; also send trace and mud viscosity change) Bit wear (slow drilling without formation change) Penetration of reservoir top – stop to change a core bit (clear sand cuttings, PHI/K and HC shows) OWC passing (reducing gas & oil shows)

HW IPE ASC at TPU Core handling and description l Major role of wellsite HW IPE ASC at TPU Core handling and description l Major role of wellsite geologist – – – supervision (picking the coring point, catching the core, core measuring, preservation, labeling and boxing) quality assurance (core organization) interpretation (core description)

HW IPE ASC at TPU Core handling and description l Major role of wellsite HW IPE ASC at TPU Core handling and description l Major role of wellsite geologist – – Better recovery – l Core preservation l Faster rigside core processing (incl. gamma ray and depth matching, X-ray for SCAL sampling) l supervision (picking the coring point, catching the core, core measuring, preservation, labeling and boxing) quality assurance (core organization) interpretation (core description)

HW IPE ASC at TPU Friable core handling l Core Pull Out of Hole HW IPE ASC at TPU Friable core handling l Core Pull Out of Hole (POOH) Schedule l Full-length transportation to the work area l Core stabilization (by freezing or epoxy) l Pre-lab core analysis l Core sleeves cutting (1 m) l Safe transportation to the lab

HW IPE ASC at TPU Friable core handling l Core Pull Out of Hole HW IPE ASC at TPU Friable core handling l Core Pull Out of Hole (POOH) Schedule l Full-length transportation to the work area l Core stabilization (by freezing or epoxy) l Pre-lab core analysis l Core sleeves cutting (1 m) l Safe transportation to the lab

HW IPE ASC at TPU Friable core handling l Core Pull Out of Hole HW IPE ASC at TPU Friable core handling l Core Pull Out of Hole (POOH) Schedule l Full-length transportation to the work area l Core stabilization (by freezing or epoxy) l Pre-lab core analysis l Core sleeves cutting (1 m) l Safe transportation to the lab

HW IPE ASC at TPU Friable core handling l Core Pull Out of Hole HW IPE ASC at TPU Friable core handling l Core Pull Out of Hole (POOH) Schedule l Full-length transportation to the work area l Core stabilization (by freezing or epoxy) l Pre-lab core analysis l Core sleeves cutting (1 m) l Safe transportation to the lab

HW IPE ASC at TPU Friable core handling l Core Pull Out of Hole HW IPE ASC at TPU Friable core handling l Core Pull Out of Hole (POOH) Schedule l Full-length transportation to the work area l Core stabilization (by freezing or epoxy) l Pre-lab core analysis l Core sleeves cutting (1 m) l Safe transportation to the lab

HW IPE ASC at TPU Friable core handling l Core Pull Out of Hole HW IPE ASC at TPU Friable core handling l Core Pull Out of Hole (POOH) Schedule l Full-length transportation to the work area l Core stabilization (by freezing or epoxy) l Pre-lab core analysis l Core sleeves cutting (1 m) l Safe transportation to the lab

HW IPE ASC at TPU Friable core handling l Core Pull Out of Hole HW IPE ASC at TPU Friable core handling l Core Pull Out of Hole (POOH) Schedule l Full-length transportation to the work area l Core stabilization (by freezing or epoxy) l Pre-lab core analysis l Core sleeves cutting (1 m) l Safe transportation to the lab

HW IPE ASC at TPU Friable core handling l Core Pull Out of Hole HW IPE ASC at TPU Friable core handling l Core Pull Out of Hole (POOH) Schedule l Full-length transportation to the work area l Core stabilization (by freezing or epoxy) l Pre-lab core analysis l Core sleeves cutting (1 m) l Safe transportation to the lab

HW IPE ASC at TPU Wireline Log Supervision and Interpretation l Supervision – – HW IPE ASC at TPU Wireline Log Supervision and Interpretation l Supervision – – – l Quality assurance – – – l providing fine programme tuning communication with shore detailed time breakdown recognition of repeat section depth matching tool response and calibration Interpretation – – formation top/bottom gross reservoir net sand, net pay picking RFT and SWC points

HW IPE ASC at TPU HW IPE ASC at TPU