Скачать презентацию How the ISO TS 16949 Additions have moved from Скачать презентацию How the ISO TS 16949 Additions have moved from

778888c655ec0e36063bc7456b7ada9d.ppt

  • Количество слайдов: 37

How the ISO/TS 16949 Additions have moved from 1 st to 2 nd edition How the ISO/TS 16949 Additions have moved from 1 st to 2 nd edition X/X Element Sub-element

How the ISO/TS 16949 Additions have moved from 1 st to 2 nd edition How the ISO/TS 16949 Additions have moved from 1 st to 2 nd edition X/X Element Sub-element

Summary of Changes • A majority of additions to First Edition migrate to 7. Summary of Changes • A majority of additions to First Edition migrate to 7. 0 Product Realization, 8. 0 Measurement, Analysis and Improvement and 6. 0 Resources in Second Edition. • Just 2 additions from 1 st edition to 2 nd edition 6. 5 Sourcing, 7. 1. 2 Change Control • Changes have not been made in 17 areas • A change is made to the language of almost every requirement, whether a change to the wording or removal of a term

Comparison between 1 st and 2 nd edition 4. 1 – Management Responsibility TS Comparison between 1 st and 2 nd edition 4. 1 – Management Responsibility TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 1. 1. 2 Objectives 5. 4. 1. 1 – Quality Objectives – Supplemental Changed to “Top management shall define quality objectives and measurements in the business plan to deploy the quality policy. 4. 1. 1. 3 Customer Satisfaction 8. 2. 1. 1 – Customer satisfaction – Supplemental Removed “Documented Process” Monitored through Performance indicators. Mandatory indicators are Delivered part quality performance, Customer disruptions including field failures, Delivery schedule performance (including premium freight), Special status customer notifications relating to quality or delivery issues Added “The organization shall monitor manufacturing processes’ performance to demonstrate compliance with customer requirements for product quality and efficiency of the process.

Comparison between 1 st and 2 nd edition TS 16949 1 st edition TS Comparison between 1 st and 2 nd edition TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 1. 1. 4 Continuous Improvement 5. 3. 1 Quality Policy – Supplemental Moved only the first sentence “Continuous improvement in quality, service, cost , technology shall be provided for in the Quality policy” as a separate element 5. 3. 1 4. 1. 1. 4 – Remaining requirements 8. 5. 5. 1 – Organizational continuous improvement Wordings changed “Shall define a process for continual improvement” Note 1 and Note 2 deleted 4. 1. 2 – Customer representative 5. 5. 2. 1 – Customer representative Minor wording changes 4. 1. 2. 1. 3 - Quality responsibility 5. 5. 1. 1 – Quality Responsibility Minor wording changes 4. 1. 2. 2. 2 – Shift resources 5. 5. 1. 1 – Quality Responsibility Minor wording changes

Comparison between 1 st and 2 nd edition TS 16949 1 st edition TS Comparison between 1 st and 2 nd edition TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 1. 2. 4 – Organizational interfaces 7. 3. 1. 1 – Multi – Disciplinary approach 7. 2. 3. 1 – Customer communication supplemental Removed “The supplier shall have systems in place…. . According to customer advance product quality planning and control plan manual. ” Retained “The organization shall have the ability to communicate necessary information including data in a customer specified language and format, (e. g. computer-aided design data, electronic data exchange, …) “ 4. 1. 3. 2 Management review – Supplemental 4. 2. 8 – Quality system performance (Above elements are moved to 5. 6. 1. 1) 5. 6. 1. 1 – Quality management system performance 5. 6. 2. 1 - Management review – supplemental • Minor wording changes. • Added “Analysis of field failures and their impact on quality, safety or the environment shall be input to management review”

Comparison between 1 st and 2 nd edition TS 16949 1 st edition TS Comparison between 1 st and 2 nd edition TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 1. 4 – Business Plan Removed Reference is there in 5. 4. 1. 1 and 5. 6. 1. 1, but there requirements of 4. 1. 4 is missing, not even in Parking lot 4. 1. 5 – Analysis and use of Company level data 8. 4. 1 – Analysis and use of company level data • Removed” Supplier shall document trends in quality, operational performance and current quality objectives” (Still reviewing Cost of poor quality is mandatory under 5. 6. 1. 1) 4. 1. 6 – Employee motivation, empowerment and satisfaction 6. 2. 2. 4 – Employee motivation, empowerment and satisfaction • • • Removed “Employee satisfaction process” Note deleted. This should be 6. 2. 2. 4. There is an error in the standard in the numbering 4. 1. 7. 1 Product Safety 6. 4. 1 Safety • Removed “Potential risks to Customers, users and the environment”. Only “Risk to employees” is there 4. 1. 7. 2 – Regulations 7. 2. 1 – Determination Added as Note-2 of requirements relating to product

Comparison between 1 st and 2 nd edition 4. 2 Quality Systems TS 16949 Comparison between 1 st and 2 nd edition 4. 2 Quality Systems TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 2. 2. 2 – Quality System documentation 4. 2. 1 – General Note added: At the moment in Parking lot 4. 2. 3. 2 – Quality Plan requirements 7. 1. 1 – Quality Plan requirements Word “appropriate” is removed 4. 2. 4. 1 – Product Realization – General 7. 1 – Product realization • • Only Note-1 retained. Requirements relating to project management approach and a project team is removed Significant removal “Confidentiality of customer-contracted products and projects under development and related product information 4. 2 - Measurements 7. 3. 4. 1 – Monitoring • 4. 2. 4. 3 – Review cycle 7. 3. 4. 1 – Monitoring Removed the requirement. Note still there “These measurements shall include quality risks, costs, lead-times, critical paths” moved to Notes.

Comparison between 1 st and 2 nd edition 4. 2 Quality Systems TS 16949 Comparison between 1 st and 2 nd edition 4. 2 Quality Systems TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 2. 4. 4 – Multidisciplinary approach 7. 3. 1. 1 – Multi disciplinary approach No Change 4. 2. 4. 5 Tools and techniques 8. 2. 3. 1 – Monitoring and measurement of processes – Supplemental • 4. 2. 4. 5 Tools and techniques • 7. 3. 3. 1 – Product design outputs 7. 3. 3. 2 – Process design • outputs • 4. 2. 4. 6 – Computer aided design 6. 2. 2. 1 – Product design skills • Last para “The supplier shall perform process studies…… as well as acceptance criteria” is moved to this element In this “Use of product mistake proofing is added. This already contains “Mistake proofing”, this is retained in the same element. First two sentences in 4. 2. 4. 5 is removed Entire 4. 2. 4. 6 is removed. Instead one sentence “Applicable tools and techniques shall be identified by the organization” is there in 6. 2. 2. 1

Comparison between 1 st and 2 nd edition 4. 2 Quality Systems TS 16949 Comparison between 1 st and 2 nd edition 4. 2 Quality Systems TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 2. 4. 7 – Special characteristics 7. 3. 2. 4 – Special characteristics • • “appropriate methods” removed Note – 2 removed 4. 2. 4. 8 – Feasibility reviews 7. 2. 2. 1 – Manufacturing feasibility • “including risk analysis” added 4. 2. 4. 9. 1 – Management of Process design – General Removed • Removed – Documentation requirements removed 4. 2. 4. 9. 2 – Process design 7. 3. 2. 2 – inputs Manufacturing process design input • “applicable regulations” removed 4. 2. 4. 9. 3 – Process design 7. 3. 3. 2 – output Manufacturing process design output • “manufacturing process flow chart/layout” added “Control plan” added •

Comparison between 1 st and 2 nd edition 4. 2 Quality Systems TS 16949 Comparison between 1 st and 2 nd edition 4. 2 Quality Systems TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 2. 4. 9. 4 – Process verification 7. 3. 5 – Design and Development verification This is part of Design and Development verification since now Design and Development includes “Product and Process design” which is added at the beginning of 7. 3 under title “Important” 4. 2. 4. 10 – Control Plan 7. 5. 1. 2 – Control Plan • “prototype control plan when required by customer” removed 4. 2. 4. 11 – Product Approval Process 7. 3. 6. 3 – Product Approval Process • First two requirements including two notes are moved to 7. 3. 6. 3 4. 2. 4. 11 – Product Approval process 7. 3. 7. 1 – Control of Design and development changes – supplemental • Requirements relating to change moved to 7. 3. 7. 1 Note added as : See 7. 1. 2 – Change Control • • New requirement added incorporating Change requirements

Comparison between 1 st and 2 nd edition 4. 2 Quality Systems TS 16949 Comparison between 1 st and 2 nd edition 4. 2 Quality Systems TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 2. 5 – Plant, facility and equipment planning 6. 3. 1 – Plant, facility “Plant layouts shall minimize material travel” and equipment planning changed to “Plant layouts shall optimize material travel” In Methods shall be developed, added “implemented” Note removed 4. 2. 6 – Tooling management 7. 5. 1. 6 – Tooling management • • Minor wording changes Note added : “This requirement also applies to tooling availability for vehicle spare parts” 4. 2. 7 – Process Improvement 8. 5. 1. 2 – Manufacturing Process Improvement • • Minor wording changes. 2 notes deleted and two new notes added 4. 2. 8 – Quality System performance 5. 6. 1. 1 – Quality Management System performance • This requirement incorporated along with 4. 1. 3. 2 – Management review supplemental

Comparison between 1 st and 2 nd edition 4. 3 Contract review TS 16949 Comparison between 1 st and 2 nd edition 4. 3 Contract review TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 3. 2. 2 – Review – Supplemental Removed This requirement is removed

Comparison between 1 st and 2 nd edition 4. 4 Design Control TS 16949 Comparison between 1 st and 2 nd edition 4. 4 Design Control TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 4 Design Control – Important 7. 3 – Design and Development Added “The requirements of 7. 3 are applicable to Product and manufacturing design and development and should focus on error prevention rather than detection”. This is a big change 4. 4. 2. 2 Required skills 6. 2. 2. 1 – Product design skills • • 4. 4. 2. 3 Research and Development 7. 3. 2. 3 Innovation • • • Just says that Suppliers resources should be qualified to achieve design requirements and skilled tools and techniques. List of skills has been removed Just says that Organization shall have a process for innovation in product and process Removed “access to R&D facilities” Right now in Parking lot

Comparison between 1 st and 2 nd edition 4. 4 Design Control TS 16949 Comparison between 1 st and 2 nd edition 4. 4 Design Control TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 4. 4. 2 Reliability Objectives 7. 3. 2. 1 – Product design inputs The existing requirement added as one of the inputs to Product design 4. 4. 4. 3 – Use of information 7. 3. 2. 1 – Product design inputs • The existing requirement added as one of the inputs to Product design 4. 4. 5. 2 – Design Optimization 7. 3. 3. 1 – Product design outputs • Minor wording changes. Product outputs and the Optimization processes clearly seperated out 4. 4. 8. 2 – Design Validation – Supplemental 7. 3. 6. 1 – Design and development validation – supplemental • At the moment, recording of design failures and corrective actions is put within brackets. Requirements are not written in detail. First sentence pertaining to customer timing is there 4. 4. 8. 3 – Prototype Programme 7. 3. 6. 2 – Prototype program No Change

Comparison between 1 st and 2 nd edition 4. 4 Design Control TS 16949 Comparison between 1 st and 2 nd edition 4. 4 Design Control TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 4. 9. 2 – Evaluation of design change 7. 3. 7. 1 – Control of design and development changes Supplemental No change. Incorporated as part of 7. 3. 7. 1 In 7. 3. 7 note added “Design changes include all changes during the life cycle of the product” Note “This includes changes to proprietary designs” removed

Comparison between 1 st and 2 nd edition 4. 5 Document and data control Comparison between 1 st and 2 nd edition 4. 5 Document and data control TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 5. 2. 1 Note Removed Note is Removed 4. 5. 2. 2 Engineering specifications 4. 2. 3. 1 – Engineering Specifications • • Word “procedure removed” and “process” added 2 notes currently present removed

Comparison between 1 st and 2 nd edition 4. 6 Purchasing TS 16949 1 Comparison between 1 st and 2 nd edition 4. 6 Purchasing TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 6. 1. 1 Note removed and added two notes under 7. 4. 1 Note removed pertaining to Definition 3. 1 in ISO 9001” 1994 2 Notes added: Note-1 “Purchased products above includes all products and services that impact customer requirements such as sorting, rework and calibration services” Note-2 “where there are mergers, acquisitions and affiliations associated with suppliers, the organization should verify the continuity of suppliers quality system and effectiveness” 4. 6. 1. 2 – Customer approved subcontractors 7. 4. 1. 4 Customer approved sources • “including tool and gaging suppliers” added 4. 6. 1. 3 – Regulatory compliance 7. 4. 1. 2 – Regulatory compliance • “applicable to country of manufacture and sale” removed

Comparison between 1 st and 2 nd edition 4. 6 Purchasing TS 16949 1 Comparison between 1 st and 2 nd edition 4. 6 Purchasing TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 6. 2. 2 – Subcontractor development 7. 4. 1. 3 – Supplier Quality management system development Added “As a minimum the supplier shall be compliant with ISO 9001: 2000”. This could be a big change Note 2 relating to prioritization removed Note 1 – Minor changes in wordings 4. 6. 2. 3 – Scheduling subcontractors 8. 2. 4. 3 – Supplier Monitoring • “Shall require 100% on time delivery and providing planning information and purchase commitments” removed. Only Delivery performance tracking and premium freight tracking retained

Comparison between 1 st and 2 nd edition 4. 7 Control of customer supplied Comparison between 1 st and 2 nd edition 4. 7 Control of customer supplied product TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 7. 2 – Customer owned tooling 7. 5. 4. 1 – Customer owned tooling “manufacturing, test, inspection tooling and equipment” added.

Comparison between 1 st and 2 nd edition 4. 8 Product identification and traceability Comparison between 1 st and 2 nd edition 4. 8 Product identification and traceability TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 8 7. 5. 3 – Product Identification and traceability No change

Comparison between 1 st and 2 nd edition 4. 9 Process Control TS 16949 Comparison between 1 st and 2 nd edition 4. 9 Process Control TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 9. 1. 2 Cleanliness of Premises 6. 4. 2 – Cleanliness of premises Minor wording changes 4. 9. 1. 3 – Contingency plans 6. 3. 2 – Contingency plans • 4. 9. 1. 4 – Designation of special characteristics 7. 2. 1. 1 – Customer designated special characteristics Minor wording changes 4. 9. 1. 5 – Preventive maintenance 7. 5. 1. 5 – Preventive and predictive maintenance • • • “to satisfy the customer specified requirements” added Natural disaster and force major removed Minor wording changes “Predictive methods to maximize the effectiveness and efficiency of equipments” added

Comparison between 1 st and 2 nd edition 4. 9 Process Control TS 16949 Comparison between 1 st and 2 nd edition 4. 9 Process Control TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 9. 2 – Job instructions 7. 5. 1. 3 – Work instructions “Job instructions” changed to “Work instruction” “without disruption of job” removed “Job instructions shall include or reference …. ” removed Note 1 and Note 2 removed 4. 9. 3 Maintaining process 8. 2. 3. 1 –Monitoring control and measurement of processes – Supplemental • • 4. 9. 4 Verification of jobsetups 7. 5. 1. 4 – Verification of • Job setups • 4. 9. 5 Appearance items 8. 2. 4. 5 – Appearance items • Word “exceed” removed Minor wording changes Word “Setup is” missing. This is an error. “significant time period between runs” removed It is 8. 2. 4. 4, should be 8. 2. 4. 5. Minor wording changes

Comparison between 1 st and 2 nd edition 4. 10 Inspection and Testing TS Comparison between 1 st and 2 nd edition 4. 10 Inspection and Testing TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 10. 1. 1 Note removed Existing note removed. New note pertaining to selection of measurement types added. In parking lot 4. 10. 1. 2 Acceptance criteria 8. 2. 4. 1 – Acceptance criteria • Changed to “Acceptance criteria shall be defined by the customer and documented by the organization”. This is not clear 4. 10. 2. 4 – Incoming product quality 8. 2. 4. 2 – Incoming Product quality • “Shall have a process to assure quality of incoming product”. When the evidence says that quality is not good then, the corrective actions to be initiated using the following methods “ Receipt of statistical data……” This change means that it is not mandatory to follow the 4 controls listed as per the 1 st edition. This is required only as a corrective action • •

Comparison between 1 st and 2 nd edition 4. 10 Inspection and Testing TS Comparison between 1 st and 2 nd edition 4. 10 Inspection and Testing TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 10. 4. 2 – Layout inspection and functional testing 8. 2. 4. 3 – Layout inspection and functional testing No change 4. 10. 6 Laboratory requirements 7. 6. 4 – Laboratory requirements 7. 6. 4. 1 – Internal Labs 7. 6. 4. 2 – External Labs • • • Compliance with ISO/IEC 17025 removed. Now it is not mandatory. Earlier requirements in QS 9000: 1998 written as mandatory in 2 nd edition. Lab “shall be included in the quality system” “Evidence of external lab acceptable to the customer” is required if the external lab is not an accredited lab 2 notes added pertaining on how the customer acceptance of lab can be demonstrated. This could be a big change

Comparison between 1 st and 2 nd edition 4. 11 Control of inspection, measuring Comparison between 1 st and 2 nd edition 4. 11 Control of inspection, measuring and test equipment TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 11. 1. 2 – Measurement System Analysis 7. 6. 1 – Measurement System analysis Note added saying what requirements to be applied for acceptance in the absence of customer reference manuals (ISO 10012 -1 and ISO 10012 -2 to be used in such cases) Existing Note deleted 4. 11. 3 – Records 7. 6. 2 – Calibration records • “an assessment of the impact of the out -of specification condition” added

Comparison between 1 st and 2 nd edition 4. 12 Inspection and Test status Comparison between 1 st and 2 nd edition 4. 12 Inspection and Test status TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 12 – Inspection and Test status 7. 5. 3 – Product identification and traceability No change. Merged with Product identification and traceability

Comparison between 1 st and 2 nd edition 4. 13 Control of nonconforming product Comparison between 1 st and 2 nd edition 4. 13 Control of nonconforming product TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 13. 1. 2 Suspect material or product 8. 3 – Control of nonconforming product “Visual identification for any nonconforming product…. ” removed Added “Important: Nonconforming includes material of unknown or suspect status” 4. 13. 1. 3 – Corrective action plan 8. 3. 1 – Customer information • • “Customer information in case of nonconforming product shipped” is moved to this element Requirement relating to quantify, analyze and initiating actions removed 4. 13. 3 – Control of reworked product 8. 3. 2 – Control of reworked product • Minor wording change 4. 13. 4 – Engineering approved authorization 8. 3. 3 – Customer authorization • Change – “Shall obtain customer authorization prior to changing product/process” Minor wording changes •

Comparison between 1 st and 2 nd edition 4. 14 Corrective and Preventive action Comparison between 1 st and 2 nd edition 4. 14 Corrective and Preventive action TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 1. 2 Problem solving 8. 5. 2. 1 – Problem Solving “Shall have a process for problem solving leading to root cause identification and elimination” (Wording change) 4. 1. 3 Mistake proofing 8. 5. 2. 2 – Mistake proofing 8. 5. 3. 1 – Mistake proofing in preventive action No Change 4. 14. 2. 2 – Corrective action impact 8. 5. 2. 3 – Corrective action impact No change 4. 14. 2. 3 – Returned product test/analysis 8. 5. 2. 4 – Returned product test/analysis • • “Rejected” should be “Returned”. This is an error in the standard. No change

Comparison between 1 st and 2 nd edition 4. 15 Handling, Storage, packaging, preservation Comparison between 1 st and 2 nd edition 4. 15 Handling, Storage, packaging, preservation and delivery TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 15. 3. 2 – Inventory 7. 5. 5. 1 – Storage and inventory No Change 4. 15. 4. 2 Customer packaging standards Removed 4. 15. 4. 3 – Labelling Removed 4. 15. 6. 2 – Performance monitoring of supplier delivery 8. 2. 1. 1 –Customer satisfaction – Supplemental • • “Delivery schedule performance including premium freight” is one of the indicators to be tracked “Organization shall monitor process performance to meet the customer quality and efficiency of process” (This is for lead time tracking). Removed “Lead time requirements” Removed the first sentence of current 4. 15. 6. 2

Comparison between 1 st and 2 nd edition 4. 15 Handling, Storage, packaging, preservation Comparison between 1 st and 2 nd edition 4. 15 Handling, Storage, packaging, preservation and delivery TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 15. 6. 3 – Production scheduling 7. 5. 1. 7 – Production scheduling Minor wording changes 4. 15. 6. 4 – Electronic communication Removed 4. 15. 6. 5 – Shipment notification system Removed

Comparison between 1 st and 2 nd edition 4. 16 Control of Quality Records Comparison between 1 st and 2 nd edition 4. 16 Control of Quality Records TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 16. 2 Record retention 4. 2. 4. 1 – Record retention No change

Comparison between 1 st and 2 nd edition 4. 17 – Internal quality audits Comparison between 1 st and 2 nd edition 4. 17 – Internal quality audits TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 17. 2. 1 – Internal quality 8. 2. 2. 1 – Internal audits – supplemental – plans General Note pertaining to adherence to ISO 10011 -1 removed , since now meeting ISO 10011 -1 is mandatory 4. 17. 2. 2 – System audit 8. 2. 2. 1 – Internal audit plans • “Audits shall cover all activities and shifts” moved to 8. 2. 2. 1 8. 2. 2. 2 – Quality management system audit • Remaining requirements of 4. 17. 2. 2 are moved here. No change 4. 17. 2. 3 – Process audit 8. 2. 2. 3 – Manufacturing Process audit • Removed the word “Product realization”. Now the focus is only on manufacturing process. 4. 17. 2. 4 – Product audit 8. 2. 2. 4 – Product audit • No change 4. 17. 3 – Auditor qualification 8. 2. 2. 2 – Internal auditor qualification • “Shall comply with ISO 10011 -2 requirements unless specified by customer”. This is a big change.

Comparison between 1 st and 2 nd edition 4. 18 – Training TS 16949 Comparison between 1 st and 2 nd edition 4. 18 – Training TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 18. 1 – Training 6. 2. 2. 2 – Training Even though this is ISO 9000: 1994 requirement, this is not a requirement in ISO 9001: 2000. In the 2 nd edition, this along with the 2 notes which were present in ISO 9000: 1994 have been added in this element without any change 4. 18. 2 Training effectiveness 6. 2. 2. c • Effectiveness requirements is added now as part of ISO 9001: 2000 6. 2. 2. c 6. 2. 2. 2 – Training • “Special attention shall be given on customer specific requirements” is moved to 6. 2. 2. 2 Note is removed • 4. 18. 3 – Training on the job 6. 2. 2. 3 – Training on the job • This should be actually 6. 2. 2. 3. This is an error in the standard in numbering. No change

Comparison between 1 st and 2 nd edition 4. 19 - Servicing TS 16949 Comparison between 1 st and 2 nd edition 4. 19 - Servicing TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 19. 1 Servicing – Note removed 4. 19. 2 Feedback of information from service 7. 5. 1. 8 – Feedback of information from service No change 4. 19. 3 – Servicing agreement with customer 7. 5. 1. 9 – Servicing agreement with customer • Earlier it was “Special purpose tools” now it is “Special purpose tools or measuring equipments”

Comparison between 1 st and 2 nd edition 4. 20 – Statistical techniques TS Comparison between 1 st and 2 nd edition 4. 20 – Statistical techniques TS 16949 1 st edition TS 16949 2 nd edition Comments 4. 20. 3 – Identification of statistical tools 8. 1. 1 – Identification of Statistical tools No change 4. 20. 4 – Knowledge of basic statistical concepts 8. 1. 2 – Knowledge of basic statistical concepts Word “where appropriate” removed

Comparison between 1 st and 2 nd edition New requirements TS 16949 1 st Comparison between 1 st and 2 nd edition New requirements TS 16949 1 st edition TS 16949 2 nd edition Comments - 6. 5 Sourcing “The organization shall identify qualified sources of supply needed to realize products. To maintain consistency and stability, sourcing shall include a process to manage supplier communication and improvement. ”