47085de59f8a85e5981afa71c384045f.ppt
- Количество слайдов: 12
High Performance Energy Storage Systems for Mobile and Stationary Applications COST Action 542 Start date: 01/06/2006 End date: 12/07/2010 Year: 3 COST is supported by the EU RTD Framework Programme ESF provides the COST Office through an EC contract
Scientific context and objectives • Research area: high performance energy storage devices/systems, material science, transportation, energy • Brief reminder of Mo. U objectives: – Development of high performance energy storage systems based on supercapacitors and their implementation in mobile and stationary applications in transportation and energy technologies – Development of the next generation supercapacitors (advanced materials & manufacturing technology) – Taping the potential of the implementation of high voltage supercapacitors in transportation and energy COST is supported by the EU RTD Framework Programme 2 ESF provides the COST Office through an EC contract
Working groups • 1) Advanced materials • 2) Construction and production technology • 3) Automotive applications • 4) Electro-transport applications • 5) Energy techniques applications COST is supported by the EU RTD Framework Programme 3 ESF provides the COST Office through an EC contract
Action Members 20 18 16 14 12 10 8 6 4 12 13 17 YR 1 2 YR 3 0 COST is supported by the EU RTD Framework Programme 4 YR 4 ESF provides the COST Office through an EC contract
Number of individual participants and early stage researchers 225 200 175 150 125 100 75 50 25 0 130 107 26 YR 1 COST is supported by the EU RTD Framework Programme 152 Individual participants ESRs 42 37 YR 2 YR 3 5 YR 4 ESF provides the COST Office through an EC contract
Use of COST instruments YR 1 YR 2 YR 3 3 (MC) 3 (WG) 2 (MC) 2 (WG) 2 (MC) + 3 (WG) No. of STSMs 0 1 2 No. of workshops / conferences 5 5 (3 of them without financial support by COST) 4 (2 of them without financial support by COST) 15 27 40 1 0 ESR Think Tank Posters, website, meetings Website, meetings No. of MC / WG meetings No. of publications No. of training schools GASG (activities) COST is supported by the EU RTD Framework Programme 6 YR 4 ESF provides the COST Office through an EC contract
Significant highlights • WG’s Meeting in conjunction with the European Supercapacitor Conference (November, 2008): – – COST Action as co- organiser of the European Conference Scientific contribution - 15 presentations from the COST Action 542 Successful demonstration of a multidisciplinary character of the Action Based on presented results new projects inside of the Action as well as outside Action/EC have been initiated – Development of the European Roadmap for Supercapacitor Technology has been initiated • Presentation of the COST/COST Action 542 on “ 3 d International Renewable Energy Storage Conference” (IRES 2008) (November, 2008) – COST Action as co-organizer of the conference. Partners: EUROSOLAR, World Council for Renewable Energy, EUROBAT, ESA etc. – Special session, dedicated to supercapacitor based energy storage systems with presentations from the COST Action 542 – The activity will lead to new projects and to the formation of new networks with “renewable energy” community – Impact to dissemination of supercapacitor technology as a pivotal technology to allow the improved integration of rebewables and deep penetration of distributed power generation COST is supported by the EU RTD Framework Programme 7 ESF provides the COST Office through an EC contract
Significant highlights – • Presentation of the COST and COST Action on Advanced Supercapacitors World Summit (USA, 2008, July) • Presentation of the COST and COST Action to the UK National “Supergen” Consortium (Glasgow, 2008, August) and start of cooperation between COST Action and National Consortium • Presentation of the results on the qualification of the prototype for the engine starting system (March, 2008) – Dissemination of the results: Romanian National Railways, Romanian private railway operators, start of the development of the prototype for other types of locomotives, for car (in cooperation with Renault company) in Romania, project start in France, project preparation in Israel – Patent application for the supercapacitor based engine starting system under preparation COST is supported by the EU RTD Framework Programme 8 ESF provides the COST Office through an EC contract
Global dimension • Funding on national level: e. g. IE, PL, RO, FR, CZ, cooperation with “Supergen” consortium (GB) • Cooperation with the Russian Academy of Science and Russian National Programme “High Performance Energy Storage Devices”, 4 non-COST institutions, 12 individual participants • Cooperation with National railway operators, industry (e. g. car manufacturing companies, system integrators) • Cooperation with EUROSOLAR & World Council for Renewable Energy (result: international conference – November 2008) • • Organisation of and Action Meeting in conjunction with the European Supercapacitor Symposium (Roma, November 2008) Presentation of the COST Action: e. g. Advanced Supercapacitors World Summit (July 2008), bilateral French-German network on new technologies for transportation. COST is supported by the EU RTD Framework Programme 9 ESF provides the COST Office through an EC contract
DISSEMINATION EFFORTS • 1. 2. Supercapacitor Based Engine Starting System Multidisciplinary “Think tank” + Partnership with railway operator (November 2006) • System requirements • Development/realisation of the prototype in frame of public-private partnership (DE, RO, FR, RO) Demonstration of the prototype (April/May 2007): to representatives of 12 countries + Training school, meanwhile decisions to consider implementation in different countries BATTERY Customer benefits: reduced CAPex & OPex versus + Supercapacitor long lifetime >10 years significant fuel & emissions savings maintenance freedom COST is supported by the EU RTD Framework Programme more than 25. 000 locomotives in Europe! 10 ESF provides the COST Office through an EC contract
DISSEMINATION EFFORTS 1. Prototypes/Demonstrators (PL, DE): “high-voltage” supercapacitor • UPS: SC & 1. 2 KW FUEL CELL • 2. International Renewable Energy Storage Conference (Berlin, DE, 2425/11/2008) – – in co-operation with EUROSOLAR and World Counsil for Renewable Energy Special session: “Supercaps for stationary and mobile energy storage” incl. 3 presentations from the COST Action 542 COST is supported by the EU RTD Framework Programme 11 ESF provides the COST Office through an EC contract
Challenges • Successes and shortcomings: • Future challenges: – Effective implementation of multidisciplinary Pan-European approach for technological improvement (advanced materials: separator; prototypes for the application in the transportation and energy technique) – Successful dissemination strategy/results – Insufficient number of STSM`s, but training school and ERS “Think Tank” – Improved activity in FP – – – Development of the European Roadmap for Supercapacitor Technology Education tool on supercapacitor technology for universities “White paper” book on supercapacitor technology Training school/Think tank for ESR`s Dissemination of results Initiative for the public – private partnership to create new European companies for supercapacitor development/manufacturing/system integration COST is supported by the EU RTD Framework Programme 12 ESF provides the COST Office through an EC contract
47085de59f8a85e5981afa71c384045f.ppt