Ferrara MECHANICAL SUPPORT forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2 Ferrara MECHANICAL SUPPORT forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2 -6 march 2009 1

Ferrara We have studied the mechanical support for the tracking stations DC 5 and Ferrara We have studied the mechanical support for the tracking stations DC 5 and DC 6 DC 5 (top view) GSI – 2 -6 march 2009 Federico Evangelisti 2

Ferrara The support is composed of two principal parts: 1. main frame (shown in Ferrara The support is composed of two principal parts: 1. main frame (shown in dark green); 2. straw tube module supports (drawers). drawer main frame (DC 6) drawer main frame GSI – 2 -6 march 2009 Federico Evangelisti 3

The main frame consists of a chassis realized with steel standard profiles: • IPE The main frame consists of a chassis realized with steel standard profiles: • IPE 240 (IPE UNI 5398 -240) for the upper and lower horizontal supports; • HE 120 (HE UNI 5397 -120) for the legs. Ferrara The structure is completely disassembled in order to facilitate the transport. HE 120 IPE 240 HE 120 (DC 6) GSI – 2 -6 march 2009 Federico Evangelisti 4

Ferrara The straw tube wall is divided in two parts around the beam line. Ferrara The straw tube wall is divided in two parts around the beam line. Each half is, in its turn, divided in two parts (drawers). On each drawer two layers are installed (vertical and tilting). rails Layer 1 Layer 2 (DC 6) left drawers Layer 3 right drawers Layer 4 (DC 6 - side view) front drawer GSI – 2 -6 march 2009 Federico Evangelisti back drawer 5

Ferrara telescopic rails Every drawer is connected to the main frame with two telescopic Ferrara telescopic rails Every drawer is connected to the main frame with two telescopic rails. RAILS CHARACTERISTICS: • closed length (L): 2000 mm • extension (D): 3000 mm • max load: 220 kg • weight: 86, 2 kg (DC 6) GSI – 2 -6 march 2009 Federico Evangelisti 6

Ferrara ASSEMBLY PROCEDURE 1. Pull out the drawer; 2. Put the modules on the Ferrara ASSEMBLY PROCEDURE 1. Pull out the drawer; 2. Put the modules on the drawer (vertical and tilting) like Cracow method ; Straw tube module (from J. Smyrski presentation GSI 8. 12. 08) 3. Put in the drawer. GSI – 2 -6 march 2009 Federico Evangelisti 7

Ferrara MAIN FRAME DIMENSIONS AND DEFORMATIONS max displacement in the middle: 3 mm (DC Ferrara MAIN FRAME DIMENSIONS AND DEFORMATIONS max displacement in the middle: 3 mm (DC 6)(*) ACTIVE AREA Weight structure without straw tube modules: DC 6=1950 kg – DC 5=1650 kg Weight straw tube layers (signal wires and gas tubes included): DC 6=250 kg – DC 5=200 kg (*) structural verifications by Ing. V. Carassiti ACTIVE AREA GSI – 2 -6 march 2009 Federico Evangelisti 8

Ferrara drawer open max displacement 5 mm GSI – 2 -6 march 2009 Federico Ferrara drawer open max displacement 5 mm GSI – 2 -6 march 2009 Federico Evangelisti 9

Ferrara UNDER INVESTIGATION • CONNECTIONS TUBES AROUND THE BEAM PIPE; • ALIGNMENT TO THE Ferrara UNDER INVESTIGATION • CONNECTIONS TUBES AROUND THE BEAM PIPE; • ALIGNMENT TO THE BEAM AXIS; • OTHER PROFILES AND MATERIALS IN ORDER TO MAKE THE STRUCTURE LIGHTER. TO BE CHECKED • POSSIBILITY OF ASSEMBLY ON SUPPORT PLATFORM; • COMPATIBILITY OF THE DIMENSIONS WITH THE CLEARANCE BETWEEN MAGNET AND RICH FOR DC 5 AND BETWEEN RICH AND EMC FOR DC 6. GSI – 2 -6 march 2009 Federico Evangelisti 10

Ferrara CONCLUSIONS THE PROPOSED STRUCTURE HAS THE FOLLOWING ADVANTAGES: • IT IS INDEPENDENT FROM Ferrara CONCLUSIONS THE PROPOSED STRUCTURE HAS THE FOLLOWING ADVANTAGES: • IT IS INDEPENDENT FROM OTHER PARTS OF THE EXPERIMENT (DIPOLE MAGNET, RICH, EMC); • THE DRAWER METHOD MAKES IT EASIER TO MOUNT AND TO DISMOUNT STRAW TUBE MODULES; • FOR MAINTENANCE ON THE STRAW TUBE MODULES IT IS NOT NECESSARY TO REMOVE THE BEAM PIPE. GSI – 2 -6 march 2009 Federico Evangelisti 11