Event, Dd mm yy © ABB Power Technologies - 1 2005 -01 -14 - RC Sweden Presenter Network Information Systems – Facilplus Spatial. TM
Facilplus Spatial n Part of Asset Management n Asset registry and network documentation n GIS for documentation and analysis n Tools for planning, design, operations and maintenance n © ABB - 2 Management Providing network information for analysis Engineering Information
Facilplus Spatial. TM Q: What magic does Facilplus Spatial do? n © ABB - 3 n A: Reduces costs and improves asset information by enhancing your work processes
Facilplus Spatial Network Information System n More than 60 installations world wide (Sweden, Ghana, Poland, Mozambique, Jamaica, Vietnam, India, etc. ) Easily integrated with other IT systems n © ABB - 4 n Completely web enabled
E. ON Sverige Eldorado Project Over one million customers Central Sundsvall Göteborg North © ABB - 5 Oskarshamn South Eldorado modules Norrköping Malmö Örebro • SCADA DMS • Network Information • ERP
Eldorado – Project reference Network data SAP R/3 Facilplus Spatial. TM SCADA © ABB - 6 Data updating done in one system - and replicated to the others!
Eldorado Project objectives achieved n Reduced cost for network operation n Common work processes by integration of IT systems n One common SCADA operation n Better focus on operation modes: normal operation n irregular operation including outages n © ABB - 7 n storm
Facilplus Spatial – Application Portal /Cadaster /Alarm /Wa. W /Com /District Heating /Electrical network Mapper Analyzer/E Designer √ NIS - Applications NIS - Mapper © ABB - 8 Spatial Database Maintainer Operator /Gas
Facilplus Spatial - Multi-Utility Complete facility database for network documentation and geographical information n Based on Oracle Spatial n Multi Utility - electricity, gas, water, district heating & telecom n Completely web-enabled n n © ABB - 9 n Easy distribution to all users Advanced authority management Powerful data import/export tools Mapper
Facilplus Spatial – Water Applications Toolbox for better planning, analysis and management of water & wastewater networks § Manages all the network’s parts (pipes, nodes, valves…) § Advanced analysis and traces § Powerful search and report functionality © ABB - 10 § Export to external engineering tools § Full tracking management and simulation functions
Facilplus Spatial – Data- & Telecom Applications Toolbox for better planning, analysis and management of data- & telecommunication networks § Manages all the network’s parts (fiber optic cables, joints, connectors, splitters, ducts, manholes. . ) § Advanced analysis and traces § Powerful search and report functionality © ABB - 11 § Bill of quantity calculations § Controlled life cycle from client request to implementation
Facilplus Spatial – Electrical Applications Network Analysis tools for better planning, optimization and fault finding § Load Flow and Fault Analysis § Loss reductions § Load forecast § Balanced/unbalanced networks § Radial/meshed Networks © ABB - 12 § Capacitor placement optimization § Results shown on maps, single-line diagrams or forms Analyzer/E
Facilplus Spatial – District Heating Applications Toolbox for planning, analysis and management of district heating and cooling networks § Manages all the network’s parts (pipes, nodes, valves…) § Advanced analysis and traces § Powerful search and report functionality § Export to external engineering tools © ABB - 13 § Notification of outages
Facilplus Spatial – Gas Applications Toolbox for better planning, analysis and management of gas networks § Manages all the network’s parts (pipes, joints, valves…) § Full topology model for all network components § Advanced analysis and traces § Relining functionality © ABB - 14 § Export to external engineering tools § Notification of outages
Facilplus Spatial - Multi-Utility Outage information at your fingertips for better customer service § Basic Outage Management § Trouble Call Management § Resource Management § Outage reports and statistics © ABB - 15 § Planned maintenance and outage notification Operator
Facilplus Spatial - Multi-Utility Project planning and execution from beginning to end § Project administration § Handles both large and small projects § Cost calculations based on cost catalogues § Integrated workflow © ABB - 16 § Procurement § Material handling Designer
Facilplus Spatial – Multi-Utility Faster and more accurate inspection and asset reporting n Planning of inspection routes n Object identification by GPS Inspection report input by mobile connection n © ABB - 17 n Update and follow up of asset register Maintainer
Facilplus Spatial - Maintainer PDA application 1 Plan maintenance Routes are down loaded by mobile phones (or by wire) © ABB - 18 Routes are now in the terminal
Facilplus Spatial - Maintainer PDA application 3 Analyze Data 2 Execute Maintenance • Update asset register Objects to inspect in a route • Check/Approve the updated data Pole data with GPS positions Inspection protocol • Analyze in NIS © ABB - 19 Is in operation at: Västerås, Sweden
Facilplus Spatial - Platform Based on open standard software for secure and reliable operation n General Database Server n n n Based on Oracle Spatial Runs on Windows, LINUX, etc. Standard & Business-specific Data Model n n © ABB - 20 n Standard Electrical Model - CIM Local standards for cadastral data, telecom data, etc. Standard Geographic Model n OGC as used by majority of GIS suppliers
Facilplus Spatial – Powerful interface(s) Ex: Maps in MS-office applications One single command line © ABB - 21 Facilplus Spatial web services allows for powerful but very easy integration with other Windows applications
Facilplus Spatial n Lower costs n n Optimal management of network assets Better work processes n n n Web enabled - easily distributed to many users Standard software platform facilitates integration with other IT systems Secure and reliable One consistent database for maps, topology and assets n © ABB - 22 n Right functionality to right user
© ABB - 23 Presented by