European Commission The new European regulatory framework for railways Catherine PRUDHOMME “Railway Transport and European Commission The new European regulatory framework for railways Catherine PRUDHOMME “Railway Transport and Interoperability” Unit Directorate-General for Energy and Transport 07/11/2003 1

Summary 1 - European railways in figures 2 - EU legislation in force 3 Summary 1 - European railways in figures 2 - EU legislation in force 3 - EU legislation under examination 4 - Further proposals under preparation 5 - State of play of the reform 6 - Conclusions Directorate-General for Energy and Transport 07/11/2003 2

Rail Passenger Traffic (billion p. km) EU(15) ? Source: Prognos + European Transport Report Rail Passenger Traffic (billion p. km) EU(15) ? Source: Prognos + European Transport Report 2002 Directorate-General for Energy and Transport 07/11/2003 3

Rail Passenger Traffic Market Shares of Passenger Transport (in %) CEEC EU (15) Source: Rail Passenger Traffic Market Shares of Passenger Transport (in %) CEEC EU (15) Source: Prognos, European Transport Report 2002 Directorate-General for Energy and Transport 07/11/2003 4

Rail Passenger Traffic: trends High speed train Plane Conv. rail Directorate-General for Energy and Rail Passenger Traffic: trends High speed train Plane Conv. rail Directorate-General for Energy and Transport Car 07/11/2003 5

Rail Freight Traffic (billion tkm) ? EU 15 Directorate-General for Energy and Transport Source: Rail Freight Traffic (billion tkm) ? EU 15 Directorate-General for Energy and Transport Source: Prognos + European Transport Report 2002 07/11/2003 6

Market Shares of Freight Transport (in %) CEEC EU (15) Source: Prognos, European Transport Market Shares of Freight Transport (in %) CEEC EU (15) Source: Prognos, European Transport Report 2002 Directorate-General for Energy and Transport 07/11/2003 7

Rail Safety Nbr of Fatalities EU 15 Railway passengers Sources: UIC; National Statistics Directorate-General Rail Safety Nbr of Fatalities EU 15 Railway passengers Sources: UIC; National Statistics Directorate-General for Energy and Transport 07/11/2003 8

Rail Safety Fatalities Railway crossings (EU 15) Sources: UIC; National Statistics Directorate-General for Energy Rail Safety Fatalities Railway crossings (EU 15) Sources: UIC; National Statistics Directorate-General for Energy and Transport 07/11/2003 9

Staff employed in the railway sector (EU 15) Directorate-General for Energy and Transport 07/11/2003 Staff employed in the railway sector (EU 15) Directorate-General for Energy and Transport 07/11/2003 10

Financing MEUR State aids awarded to the Railway Sector Directorate-General for Energy and Transport Financing MEUR State aids awarded to the Railway Sector Directorate-General for Energy and Transport 07/11/2003 11

Financing MEUR State aids awarded to the Railway Sector Directorate-General for Energy and Transport Financing MEUR State aids awarded to the Railway Sector Directorate-General for Energy and Transport 07/11/2003 12

Aims of the European Transport Policy v Optimise the use of existing infrastructure v Aims of the European Transport Policy v Optimise the use of existing infrastructure v Rebalancing the use of modes in favour of environmental friendly modes : rail, inland waterways, shortsea shipping v Fair and efficient pricing for infrastructures use v Users first Directorate-General for Energy and Transport 07/11/2003 13

A major objective of the European Railway Policy To adapt railways to the European A major objective of the European Railway Policy To adapt railways to the European dimension Directorate-General for Energy and Transport 07/11/2003 14

A major objective of the European Railway Policy « Creation of an integrated European A major objective of the European Railway Policy « Creation of an integrated European railway area to allow cross border services under a single responsibility in order to guarantee the quality of services to the customer » Directorate-General for Energy and Transport 07/11/2003 15

Eurobarometer - Spring 2003 - EU 15 “If safety standards are met, competition is Eurobarometer - Spring 2003 - EU 15 “If safety standards are met, competition is the best way to make the railways more efficient. ” Tend to agree 71. 5 % Tend to disagree 12. 1 % No opinion 16. 4 % Directorate-General for Energy and Transport 07/11/2003 16

Main actions undertaken at European level A. Decided 1. To ensure fair and non Main actions undertaken at European level A. Decided 1. To ensure fair and non discriminatory access to the infrastructure v Separation of essential functions i. e. allocation of capacity and charging v Open access to infra and services for international freight services - from 15 March 2003 on Transeuropean Rail Freight Network (TERFN) - from 15 March 2008 on the whole network v Charging principle of social marginal costs (with possible mark-ups) v National regulatory body to survey functioning of the market and arbitrate conflicts between infra-manager and railway undertaking Directorate-General for Energy and Transport 07/11/2003 17

Main actions undertaken at European level v A new geography for the Railway Industry Main actions undertaken at European level v A new geography for the Railway Industry RB Regulatory Body Infrastructure IM Manager Directorate-General for Energy and Transport RU Railway Undertaking 07/11/2003 18

Main actions undertaken at European level v Current regulatory framework for rail (Directive 2001/12, Main actions undertaken at European level v Current regulatory framework for rail (Directive 2001/12, 2001/13 2001/14) Regulatory bodies Charging Priority rules (in case of congestion) Applicants NETWORK STATEMENT Allocation process Directorate-General for Energy and Transport Infrastructure managers 07/11/2003 19

Main actions undertaken at European level A. Decided 2. To ensure interoperability of the Main actions undertaken at European level A. Decided 2. To ensure interoperability of the network v High Speed (Dir. 96/48) - Trans-European Network for High Speed rail - Adoption of technical specifications for interoperability (TSI) for the whole system (plus European standards) In force since 30 Nov. 2002 - ERTMS deployment and migration strategy to be prepared by each Member State Directorate-General for Energy and Transport 07/11/2003 20

Main actions undertaken at European level v Conventional Rail (Dir. 2001/16) - Applicable to Main actions undertaken at European level v Conventional Rail (Dir. 2001/16) - Applicable to TEN as identified (i. e. also TERFN) - Mandate to AEIF in June 2001 for TSI in 2004 on key items for freight traffic - New mandates to AEIF in Sept. 2002 Directorate-General for Energy and Transport 07/11/2003 21

Interoperability related activities Programming mandates and TSI development Directorate-General for Energy and Transport 07/11/2003 Interoperability related activities Programming mandates and TSI development Directorate-General for Energy and Transport 07/11/2003 22

Main actions undertaken at European level The three-level system Essential requirements (Annex III) DIRECTIVE Main actions undertaken at European level The three-level system Essential requirements (Annex III) DIRECTIVE Technical Specifications for Interoperability TSI Interoperability Constituents Subsystems (Annex II) EUROPEAN STANDARDS Directorate-General for Energy and Transport 07/11/2003 23

Main actions undertaken at European level B. Broad agreement on the second package To Main actions undertaken at European level B. Broad agreement on the second package To be finally decided before end 2003 by Council and Parliament 1. Open access for international freight services on the whole network from 2006 and national services from 2008 (Council/EP conciliation on this) 2. Extension of interoperability requirement to the whole network (under conditions): accepted 3. Accession of the Community to OTIF: accepted Directorate-General for Energy and Transport 07/11/2003 24

Main actions undertaken at European level 4. Directive on railway safety v Creation of Main actions undertaken at European level 4. Directive on railway safety v Creation of national safety authority v Delivery of safety certificate v Common indicators, methods and targets v Creation of independent investigation bodies for accidents 5. Creation of an European Railway Agency (ERA) from 2004 v To prepare Technical Specifications for Interoperability with representatives of the sector v To prepare Common Safety Methods and Targets v To advise Commission and Member States v 100 people (+ 15 Mio € a year) Directorate-General for Energy and Transport 07/11/2003 25

Main actions undertaken at European level C. To be proposed in 2003 Subject to Main actions undertaken at European level C. To be proposed in 2003 Subject to decisions of the Commission 1. Access to the infrastructure for international passenger services (requested by EP for 2006). Issues to consider: v High speed rail services v Occasional services v Cross border regional services v Scheduled international services v Problem of cabotage v Link with Public service obligations Directorate-General for Energy and Transport 07/11/2003 26

Main actions undertaken at European level 2. Further discussion on the draft regulation on Main actions undertaken at European level 2. Further discussion on the draft regulation on public services obligations after Altmark judgement(? ) v Regional and national services v Obligation to tender if exclusive rights or compensation for P. S. 3. Rights and obligations of international rail passengers 4. Freight quality (compensation schemes considered) 5. Drivers licence directive Directorate-General for Energy and Transport 07/11/2003 27

Length of train drivers training in weeks Directorate-General for Energy and Transport 07/11/2003 28 Length of train drivers training in weeks Directorate-General for Energy and Transport 07/11/2003 28

State of Play 1. At European level v Enlargement to take place on 1/05/2004 State of Play 1. At European level v Enlargement to take place on 1/05/2004 - Accession Treaties concluded in April 2003. Successful referenda v Second package: EP 1 st reading on 14 January 2003; common position of Council 26 June; EP second reading on 22 October 03 v New Commission proposals under preparation v Competition rules (abuse of dominant position, restrictive agreements, state aids) v Revision of TEN guidelines and priority projects and revision of TEN financial regulation (proposal 1 st October 2003) v Preparation of EU financial perspectives 2007 -2013 Directorate-General for Energy and Transport 07/11/2003 29

State of Play 2. At national level v Implementation of infrastructure package of 2001 State of Play 2. At national level v Implementation of infrastructure package of 2001 by 15 March 2003 - Open access already in D-I-UK-NL-Nordic countries but some more legal work needed in D-UK-S. - Open access still to be concretised in B - F – L -SP particularly - Infringement procedures against 9 countries before the European Court of Justice - Real challenges : setting the various bodies such as regulatory body, independence of allocation body and definition of TERFN. v Interoperability - ERTMS deployment plan and migration strategy Directorate-General for Energy and Transport 07/11/2003 30

State of Play 3. The players v Infrastructure managers : to prepare network statement State of Play 3. The players v Infrastructure managers : to prepare network statement and clear conditions for access (cfr. Rail Net Europe) v Railway undertakings : - Historic operators seeking alliances between them or with new entrants to facilitate cross border freight operations (eg. Mannheim-Woippy, Brenner Rail Cargo) - New entrants ( DLC, Rail 4 Chem, RTC, etc) challenging historic operators on some corridors (North-South, Brenner, etc. ) - Improvement of services to be expected soon and better competitiveness against road Directorate-General for Energy and Transport 07/11/2003 31

State of Play v Customers - Organize themselves to express their needs - European State of Play v Customers - Organize themselves to express their needs - European Rail Freight Customers Platform - European Passengers Federation v Supplying industry - Main driver of standardisation activity - Offers more interoperable equipments (eg. Multi current loc, ERTMS, etc) at reduced costs Directorate-General for Energy and Transport 07/11/2003 32

Conclusions v European Regulatory framework under way : there is a clear vision of Conclusions v European Regulatory framework under way : there is a clear vision of all the aspects v A lot of work still to be done l Urgent need of the agency on interoperability and safety l Addressing all types of bottlenecks (short and long term actions needed) l Promoting a dedicated rail freight network l European ERTMS deployment plan for mid 2004 v Investments on infrastructure and rolling stock, particularly in accession countries Directorate-General for Energy and Transport 07/11/2003 33

For further information: Site: http: //europa. eu. int/comm/dgs/energy_transport/index_en. html Directorate-General for Energy and Transport For further information: Site: http: //europa. eu. int/comm/dgs/energy_transport/index_en. html Directorate-General for Energy and Transport 07/11/2003 34