ETS FY 16 Semester 1 CTIO 10 Sept 2015, La Serena ETS-S management team ETS FY 16 Semester 1 CTIO 10 Sept 2015, La Serena ETS-S management team 09/10/2015 1

ETS-S work load distribution expected FY 16 Work Package (total ets fte=20) FTE % ETS-S work load distribution expected FY 16 Work Package (total ets fte=20) FTE % NS ETS General Operations (mngmnt, Labs&I. S. housekeeping) 2. 70 13. 50 Blanco Projects 5. 20 Blanco Operations 4. 95 SOAR Projects 2. 60 SOAR Operations 2. 30 24. 50 SMARTS Operations 0. 25 1. 25 Small Tenants 0. 40 2. 00 Site Monitoring 0. 40 2. 00 LMCM Operations 0. 15 0. 80 LSST 0. 50 2. 50 DESI 0. 20 1. 00 AURA Network Backbone +CISS 0. 10 0. 50 NS MTN OPS 0. 25 1. 30 50. 75 Notes: • This table was extracted from the Director’s estimation for the FY 16 budget. • The numbers come from the actual ETS time-carding during FY 15. • The expectation from the ETS work plan, under construction, is that Blanco demand for ETS should ramp down and SOAR demand should ramp up • The LSST demand on MW will increase from 70% Oct 2015 to 80% Sept 2016 09/10/2015 2

The following is brought forth from FY 15 ETS-S Milestones for FY 15 (NOAO The following is brought forth from FY 15 ETS-S Milestones for FY 15 (NOAO Annual Program Plan): § Refurbish the Blanco Aluminizing tank and optimize its control parameters to ensure stable, reliable and reproducible deposition of a good quality coating (ongoing work…RA/VA/Telops) § Repairing the mirror elevator and building a new handling cart for the Cassegrain cage. (ongoing work, PS) § Upgrade the Blanco Dome Shutter emergency brakes. § Upgrading the SOAR Telescope Control System (TCS) to the same standard as the recently upgraded TCS of the Blanco 4 -m telescope. (STCSK 2 done Q 1 FY 16, STCSApp+STCSGUI done between Q 2 -Q 3 FY 16) From CTIO milestones and objectives: § Start planning the aluminization of the SOAR M 1 in the Gemini plant and implement the upgrade that may be needed to get a good coating. (ongoing work, ND/RA/RT) 09/10/2015 3

Mechanics Info Summary ACTR projects: ME and MD: U. - #480 Blanco mirror lift Mechanics Info Summary ACTR projects: ME and MD: U. - #480 Blanco mirror lift upgrade PS definition Q 1 FY 16 U. - #462 Blanco Al. plant upgrade PS/FM ? U. - #471 Cass. Cage cart PS, RR ? …………. Blanco Dome shutter brakes, PS ? …………. ME needed at SOAR …………. . ME needed Blanco/Decam support (cooling systems) Instrument Shop (fab): B. - #484 Rotational stage for F 8 handler Done Q 2 FY 16 U. - #468 Steles dewar #2? ? 09/10/2015 4

 Electronics ACTR projects: A. - #470 Blanco AO upgrade (interlocks, telemetry and air Electronics ACTR projects: A. - #470 Blanco AO upgrade (interlocks, telemetry and air on/off control) MW, MM, VA, done Q 1 FY 16 B. - #483 F 8 handler electronics MM done Q 2 FY 16 U. - #462 Blanco coating chamber upgrade RA working on it during Q 1 FY 16 A. - #482 SOAR TCS upgrade (ISBs computers upgrade) MM done Q 1 FY 16 U. - #485 Cosmos ADC (chimney facilities) MM ? ………… Coating Tests for SOAR in Gemini plant, RA done Q 1 FY 16 ………… LSST 70 -80% demand on MW Q 1 -Q 4 FY 16 External projects: § Tololo Electrical Power House, PM PM released Q 2 FY 16 § Torrent controller for the 0. 9 m, PM ? 09/10/2015 5

Computer Applications Group ACTR projects: A. - #443 SOAR TCS upgrade, Done RC Q Computer Applications Group ACTR projects: A. - #443 SOAR TCS upgrade, Done RC Q 1 FY 16, OE Q 2 FY 16 U. - #443 Blanco TCS Upgrade (non-siderial tracking), RC Done Q 1 Fy 16 A. - #470 Blanco AO upgrade (phase 2 interlocks, telemetry), RC, Done Q 1 FY 16 A. - #486 Blanco Cass. Rot. Upgrade (cal. Lamps for Cosmos and TSP 4), OE Done Q 1 FY 16 U. - #490 New Dimm for Tololo, EB Done Q 1 Fy 16? U. - #464 Blanco ECS upgrade, EB Done Q 2 FY 16? U. - #475 Portable S-H, RC work on it during Q 1 FY 16 …………. Torrent on the 0. 9 m, MB work on it during Q 1 FY 16 09/10/2015 6

Optics ACTR projects: A. - #470 B. AO upgrade (testing) RT, ND work during Optics ACTR projects: A. - #470 B. AO upgrade (testing) RT, ND work during Q 1 FY 16 U. - #475 Portable S-H (lab. calibration) ND work during Q 1 FY 16 ………… Coating Tests for SOAR M 1 in Gemini plant, RT, ND. done Q 1 FY 16 ………… Coating plant tests 1. 5 m (do the Halfman) done Q 1 Fy 16 ………… Coating tests on Blanco 4 m plant done Q 2 Fy 16? 09/10/2015 7

Coating short range plan in Gemini for ND/RA/RT 7 -Sep 11 -Sep M 1 Coating short range plan in Gemini for ND/RA/RT 7 -Sep 11 -Sep M 1 tunning with M 1 dummy load - HS, AG, CA, TV. 14 -Sep 18 -Sep M 1 running with M 1 dummy load - HS, AG. 21 -Sep 25 -Sep Mandatory Chemical Course (21 or 22) + Coating Functionality Test - CA, CM, TV + RA, ND, RT. 28 -Sep 2 -Oct Coating Functionality Test + General preps - CA, CM, TV + RA, ND, RT. 5 -Oct 9 -Oct Coating Functionality Test + General preps - CA, CM, TS, TV + RA, ND, RT. 13 -Oct 17 -Oct Shutdown start on Tuesday Oct 13 + Stripping on Friday 16 and Coating on Saturday 17 - CA, CM, TS, TV + RA, ND, RT. 19 -Oct 23 -Oct Shutdown, M 1 removal and housekeeping - CA, CM, TS, TV + RA, ND, RT. 26 -Oct 30 -Oct Shutdown, housekeeping - CA, CM, TS + RA, ND, RT. Nov Dec Magnetrons maintenance - CA + ND, RA. LSST demand on MW Month Oct-2015 Nov-2015 Dec-2015 Jan-2016 Feb-2016 Mar-2016 Apr-2016 May-2016 Jun-2016 Jul-2016 Aug-2016 Sep-2016 09/10/2015 CTIO [%] 30 30 25 25 20 20 LSST [%] 70 70 75 75 80 80 8