12af4b08c8b80bef5bc0d96c48790fc3.ppt
- Количество слайдов: 12
ESTIO Electronic Signature Testsuit for Inter-Operability A project supported by the EU ISIS programme 9/XII/19 98 ESTIO 1
Content • • 9/XII/19 98 Project Objectives and Partners Project tasks Testing methodology Project plan ESTIO 2
Project Objectives • Specify infrastructure and tools to perform conformance testing of e-signature related products for the following standards: – X. 509 Qualified Certificates – Electronic Signature Formats (ETSI, XML, EDIFACT) • Provision of these tools to allow testing of e -signature products 9/XII/19 98 ESTIO 3
Partners 9/XII/19 98 ESTIO 4
Tasks to be performed T 1: Functional requirement specifications T 2: Specification and implementation of test tools T 3: Validation of test tools by industry partners T 4: Liaisons with the European Standardisation Bodies T 5: Project Management 9/XII/19 98 ESTIO 5
T 1: Functional Requirement Specification • Conformance requirements for specified standards: – – X. 509 qualified certificate format ETSI signature formats XML signature formats (EDIFACT signature formats) • Testing approach • Functional specification for testing tools 9/XII/19 98 ESTIO 6
Testing approach files: CMS-, QC-formats Product Under Testing Tools simulation of PKI • Verify formats generated by the product (certificates, signature creation) • Generate formats to “drive” the product and study its behavior (signature verification) 9/XII/19 98 ESTIO 7
Testing approach (cont. ) Test Suite ESTIO_TS Test Group generation of QC Test Group products under development Test Group generation of ES Test Group commercially available products Test Group optional elements Test Group ··· Test Group mandatory elements Test Group valid formats Test Group mandatory elements Test Group invalid formats Test Group optional elements Test Cases 9/XII/19 98 Test Group verification of ES ESTIO 8
T 2: Specification and implementation of test tools • Specification of flexible and user-friendly testing tools • Implementation of testing tools using existing products – ASN. 1 encoders/decoders and compilers • Development of test cases 9/XII/19 98 ESTIO 9
T 3: Validation of test tools • Validation of test tools by – industry partners • Baltimore, i. D 2, Secude, Safelayer – independent testing laboratories • LGAI 9/XII/19 98 ESTIO 10
T 4: Liaisons with Standards Bodies • Attend the meetings where these topics will be discussed in order to: – – receive information on standards-in-progress get feedback on proposed conformance requirements get feedback on testing approach give feedback on proposed standards • Standards bodies to liase with: – – – 9/XII/19 98 ETSI ESI WG !! CEN/ISSS E-SIGN WS IETF PKIX W 3 C ISO/IEC ITJC 1/SC 27 ESTIO 11
Project plan 9/XII/19 98 ESTIO 12
12af4b08c8b80bef5bc0d96c48790fc3.ppt