EBEC Moscow 2014 PCB Project Smelova Vera Orlov Nickolay Danilov Garrik Aparnikov Alexandr -Problem -Concept -Best Solution
Highway data • Length of highway is 200 km between cities A and B • Number of traffic lanes – 2 in each direction • 2 bridges across the river (150 m and 300 m) • 1 tunnel through the mountain (500 m) Supplier partners cat. com • Caterpillar mobil. com intcorecycl ing. com • Green. Max bechtel. com • BECHTEL • General Electric bhpbilliton. c om • BHP Billiton ge. com • Mobil
Structures of asphalt Modern way: 1. 2. 3. 4. 5. 6. Grained asphalt Coarse asphalt Black rubble Medium-grained sand Geotextile Ground Total costs – 15, 2 billion rubles. Our innovative solution: 1. LED panel 2. Grained asphalt + tire crumb + slag ash 3. Granite rubble 4. Alluvial sand 5. Recycled polyethylene 6. Ground Total costs – 7, 8 billion rubles.
Advantages of our innovations 1. LED panels can provide electricity for a city with a population of 10, 500 people. 2. Implantation of tire crumb and slag ash into asphalt mixture helps reduce the final cost up to 38%. 3. Such components, as granite rubble, alluvial sand recycled polyethylene could be mined from mountains, rivers and plastic trash, respectively. 4. The replacement of materials Reduction of project cost allows to attract more 5% Granite crubble companies for partnership. 8% 30% 57% Slag ash Tire crumb Alluvial sand
Travelator as an air highway Advantages: • Gasoline is not spent; • The driver can relax in the car until the blade travelator lacking in its destination; • No more harmful emissions Disadvantages: • Reliability less then than in the previous case; • The high cost is about 160 billion rubles. into the atmosphere.