Скачать презентацию EASA Rulemaking Update Continuing Airworthiness Juan Anton Continuing Скачать презентацию EASA Rulemaking Update Continuing Airworthiness Juan Anton Continuing

f7d045bf1c2383dcd2065d0d9d17859f.ppt

  • Количество слайдов: 17

EASA Rulemaking Update (Continuing Airworthiness) Juan Anton Continuing Airworthiness Manager Rulemaking Directorate EASA 11 EASA Rulemaking Update (Continuing Airworthiness) Juan Anton Continuing Airworthiness Manager Rulemaking Directorate EASA 11 December 2012 E&M Sub-SSCC 1

Current tasks Part-M General Aviation (Phase I): NPA 2012 -17 published for comments until Current tasks Part-M General Aviation (Phase I): NPA 2012 -17 published for comments until 29 January 2013. Workshop was performed on 06 November 2012 explaining its content. Covers proposals related to: Maintenance Programmes Airworthiness Reviews 11 December 2012 27/10/2011 E&M Sub-SSCC Part-M General Aviation Workshop 2 2

Current tasks Proposal Scope Possibility for the owner to contract the development and approval Current tasks Proposal Scope Possibility for the owner to contract the development and approval processing of the MP to a Part-145 or M. A. Subpart F maintenance ELA 2 aircraft organisation, being also possible for this organisation to use the not involved in 1 indirect approval procedure (if approved by the competent commercial authority). operations* NOTE: The contracted maintenance organisation must be under the oversight of the State of Registry of the aircraft. Possibility for the owner to issue a declaration for his/her own aircraft’s MP. 2 NOTE: In this case, the owner takes full responsibility for its content and any deviations from the Design Approval Holder recommendations. ELA 1 aircraft not involved in commercial operations Introduction of “Minimum Inspection Programmes” (Appendix IX to Part-M) which may be used by the owner as the basis for the declared MP. Applicable to: 3 ELA 1 aeroplanes not involved in commercial operations ELA 1 sailplanes and ELA 1 powered-sailplanes not involved in commercial operations ELA 1 balloons not involved in commercial operations 11 December 2012 E&M Sub-SSCC See left column 3

Current tasks Proposal Scope All aircraft except Introduction of a template which may be Current tasks Proposal Scope All aircraft except Introduction of a template which may be used in order to prepare a 4 complex motor customised MP for a particular aircraft registration. -powered aircraft Possibility for a Part-145 or M. A. Subpart F maintenance organisation to perform the airworthiness review and issue the corresponding ARC (airworthiness review certificate) at the same ELA 1 aircraft not involved in 5 time they perform the annual inspection contained in the “Minimum commercial Inspection Programme” operations NOTE: A new Form 15 c (ARC) has been introduced to cover this case. All aircraft Clarification that, depending on the scope of work, the organisation maintained by 6 may not need to have a hangar available and may use alternative M. A. Subpart F suitable facilities (AMC M. A. 605(a)). MOs Introduction of guidance related to the use of the indirect approval 7 procedure by a CAMO in order to introduce new type ratings to All aircraft their scope of work (AMC M. B. 703) 11 December 2012 E&M Sub-SSCC 4

Current tasks Task M. 014 “Contracting of continuing airworthiness management activities” ò NPA 2010 Current tasks Task M. 014 “Contracting of continuing airworthiness management activities” ò NPA 2010 -09 published in July 2010 ò Highly controversial task (total support from Industry, significant rejection from certain NAAs). ò Review Group after NPA agreed to continue with the task and presented a report to the management of EASA. ò EASA decided, in view of the divergent comments to the NPA, that it was needed more debate on the subject: § A letter and a questionnaire was sent on 14 March 2012 to stakeholders and NAAs in order to obtain feedback on the subject. § A workshop was performed on 28 June 2012 in order to discuss the issue and the feedback received. ò Based on the result of the actions above the Agency is preparing a final outcome for the task. 11 December 2012 E&M Sub-SSCC 5

Current tasks Task MDM. 047 “Alignment of EC 2042/2003 with the Basic Regulation” òOpinion Current tasks Task MDM. 047 “Alignment of EC 2042/2003 with the Basic Regulation” òOpinion 06/2012 was published on 27 November 2012. 11 December 2012 E&M Sub-SSCC 6

Current tasks Task MDM. 038 “Guidance on TBO limits” ò NPA 2011 -15 published Current tasks Task MDM. 038 “Guidance on TBO limits” ò NPA 2011 -15 published on 16 September 2011 (3 month consultation). ò Covers all type of components installed on non-powered and piston engine aircraft other than complex motorpowered aircraft, when not used for Commercial Air Transport. ò Very detailed guidance on the inspection procedure to extend the TBO of a piston engine. ò CRD expected beginning 2013. 11 December 2012 E&M Sub-SSCC 7

Current tasks Q Task MDM. 020 “Critical tasks” ò NPA published on 12 June Current tasks Q Task MDM. 020 “Critical tasks” ò NPA published on 12 June 2012. ò Agency is currently reviewing the comments. CRD expected 2 Q 2013. Q Task 66. 027 “Avionic licence for general aviation and licence for sailplanes, balloons, airships and ELA 1 aeroplanes” ò NPA 2012 -15 published for comments until 04 January 2013. ò Workshop was performed on 06 November 2012 explaining its content. Q Task M. 027 “Guidance for Aircraft Continuing Airworthiness Monitoring (ACAM)” ò Opinion expected 1 Q 2013. 11 December 2012 E&M Sub-SSCC 8

Current tasks Q Task 145. 017 “Control of suppliers for components, parts and appliances” Current tasks Q Task 145. 017 “Control of suppliers for components, parts and appliances” ò Clarify the requirements and produce guidance on how to evaluate component suppliers. ò Evaluate the possibility to use industry standards and accreditation programmes in order to reduce the auditing burden when a supplier is used by many maintenance organisations. ò NPA 2012 -03 published on 12 April 2012. ò CRD expected 2 Q 2013. 11 December 2012 E&M Sub-SSCC 9

Current tasks Q Task MDM. 097 “Maintenance check flights” (previous task M. 009 + Current tasks Q Task MDM. 097 “Maintenance check flights” (previous task M. 009 + Operational issues) ò NPA 2012 -08 published. Comment period ended 30 October 2012. 11 December 2012 E&M Sub-SSCC 10

Current tasks Q Task MDM. 056 “Instructions for Continuing Airworthiness” ò Task started at Current tasks Q Task MDM. 056 “Instructions for Continuing Airworthiness” ò Task started at the end of 2009. ò A working group of 24 members had 3 meetings during 2010. However, the CMT meeting (December 2010) showed parallel activities with FAA and TCCA. ò EASA, FAA and TCCA decided in a meeting held in April 2011 the following: § The scope of the task was too large. § To split the task in subjects of common interest to the 3 authorities, which should be harmonised, and other subjects, which will be dealt separately by each authority. ò Coordination with FAA, TCCA in order to identify issues of common interest and harmonize approaches. ò Status report issued last October 2012 (published on the EASA website together with the To. R of the task) 11 December 2012 E&M Sub-SSCC 11

Current tasks Q Task MDM. 076 “Technical records” ò 5 meetings already took place. Current tasks Q Task MDM. 076 “Technical records” ò 5 meetings already took place. ò NPA expected 4 Q 2013. ò The objective is to clarify the following: § Inconsistency in the use of terms such as “Life Limited Parts” and “Service Life Limited Parts” § Which components require EASA Form 1 and which documents are equivalent. § Whether “Back to birth traceability” is needed. § Guidance on the use of electronic signature, the acceptability of scanned record copies and the use of new technology such as RFID (Radio Frequency Identification). § Harmonisation with FAA requirements. § Address Safety Recommendation UNKG-2007 -091 (to keep maintenance and overhaul records until the aircraft or component has been destroyed or permanently removed from service). 11 December 2012 E&M Sub-SSCC 12

Current tasks Q Task 145. 024 “Functions and responsibilities of B 1 and B Current tasks Q Task 145. 024 “Functions and responsibilities of B 1 and B 2 support staff” ò 2 meetings already took place ò NPA expected 2 Q 2013. ò The objective is to clarify the following: § How the organisation evaluates the complexity of each task and assign it to personnel authorised to “sign-off” or to nonauthorised personnel under supervision. § Who can be authorised to “sign-off”, under which qualification and under which authorisation process. § What is the role of the “sign-off” personnel and the “B 1 and B 2 support staff”. § How are recorded the actions taken by “sign-off personnel” and “B 1 and B 2 support staff”. 11 December 2012 E&M Sub-SSCC 13

Current tasks Q Task MDM. 048 “CS for standard changes and repairs” (similar to Current tasks Q Task MDM. 048 “CS for standard changes and repairs” (similar to AC 43 -13) ò To. R published on 28 July 2011. ò Applicable to aeroplanes up to 5700 Kg MTOM, rotorcraft up to 3175 Kg MTOM, sailplanes , balloons and airships. ò To be performed in phases depending on the different aircraft categories. ò Agency task with support of industry associations. ò It is linked to the Opinion issued as a result of task MDM. 032. 11 December 2012 E&M Sub-SSCC 14

Current tasks Q Task MDM. 055 “SMS embodiment and alignment with AR/OR requirements” ò Current tasks Q Task MDM. 055 “SMS embodiment and alignment with AR/OR requirements” ò NPA expected December 2012. ò Workshop to be performed on 13 December 2012. 11 December 2012 E&M Sub-SSCC 15

Future tasks (Starting in 2013) Q Task MDM. 075 “Specialized tasks” ò Currently, the Future tasks (Starting in 2013) Q Task MDM. 075 “Specialized tasks” ò Currently, the Part-145 approval ratings only cover the specialized task of NDT (D 1 rating). ò This task covers additional tasks such as welding, plating, etc. 11 December 2012 E&M Sub-SSCC 16

Future tasks (Starting in 2013) Q Task MDM. 078 “Importing of aircraft from other Future tasks (Starting in 2013) Q Task MDM. 078 “Importing of aircraft from other regulatory systems” Q Task M. 029 “CAMO and Part-145 responsibilities” 11 December 2012 E&M Sub-SSCC 17