221d666ca2bb1f78b50e41fb59311223.ppt
- Количество слайдов: 47
Diagnostic & Control Status G. Di Pirro IV Review SPARC 14 -06 -2005
Diagnostics • GUN Emittance • BPM • Charge • Emittance measure • RF deflector • Energy and Energy spread IV Review SPARC 14 -06 -2005
Movable Emittance-Meter emittance envelope IV Review SPARC 14 -06 -2005
In the last review we have the final project V. Lollo IV Review SPARC 14 -06 -2005
Now we have the object IV Review SPARC 14 -06 -2005
Target • YAG • Cromex We continue test in the DAFNE BTF IV Review SPARC 14 -06 -2005
BTF YAG MEASUREMENTS • Test acuisition system for the e-meter (digital camera with a commercial optics with 1: 1) • Qualitative study of the YAG screen compared with other know screen (CROMOX) IV Review SPARC 14 -06 -2005
MEASUREMENT SCHEME: Yag screen Macro lens (1: 1) Basler camera Firewire interface IV Review SPARC 14 -06 -2005
MEASUREMENTS: CROMOX YAG VS (SAME BEAM) GRADIENT PALETTE IV Review SPARC 14 -06 -2005
ANALYSIS (1): 150 p. C CROMOX (AU) YAG (AU) IV Review SPARC 14 -06 -2005
ANALYSIS (2): 120 p. C IV Review SPARC 14 -06 -2005
ANALYSIS (3): 50 p. C IV Review SPARC 14 -06 -2005
(3) Fit dopo il taglio in frequenza dello Yag IV Review SPARC 14 -06 -2005
(4) IV Review SPARC 14 -06 -2005
Beam Position Monitors will be installed before, between, and after the accelerating structures, as well as in the transport sections before the undulator. BPM system parameter IV Review SPARC 14 -06 -2005
Matched striplines are used in each BPM for the simultaneous readout of the horizontal and vertical positions. The intensity information can also be derived from the sum of the signals. pickup design parameter Vacuum pipe diameter 47. 4 mm Stripline diameter 39. 4 mm Stripline angular width ~30 degree Stripline length 13. 6 cm Characteristic impedance 50 W Strips thickness 1 mm Max of transfer impedance 2. 08 W Sensitivity 1. 255 mm/d. B IV Review SPARC 14 -06 -2005
BPM detection IV Review SPARC 14 -06 -2005
Change with a Bergoz • Why? • Difficult to learn the apparatus we don’t have the time • Delivered time is to high about 9 month • Not clear the single pass operation IV Review SPARC 14 -06 -2005
Faraday cup IV Review SPARC 14 -06 -2005
Faraday cup R. Sorchetti IV Review SPARC 14 -06 -2005
RF deflector • Bunch length • Emittance Slice • Emittance IV Review SPARC 14 -06 -2005
V. Lollo IV Review SPARC 14 -06 -2005
V. Lollo IV Review SPARC 14 -06 -2005
V. Lollo IV Review SPARC 14 -06 -2005
Targets • All target position are defineted. • The target in OTR. • Camera: Basler IEEE 1394 camera buy • Hamamtsu high efficency IV Review SPARC 14 -06 -2005
Control Status IV Review SPARC 14 -06 -2005
IV Review SPARC 14 -06 -2005
IV Review SPARC 14 -06 -2005
Operating system download Data storage Data base. . . . Electronic logbook Web information Automatic acquisition. . . . Magnet Vacuum IV Review SPARC 14 -06 -2005 Diagnostic . . . .
Using DAFNE Control system software IV Review SPARC 14 -06 -2005
IV Review SPARC 14 -06 -2005
Using DAFNE Control system software • Dafne front end CPU ported in new configuration • Service program under test • Starting program under test and some control window under porting and test IV Review SPARC 14 -06 -2005
Control room IV Review SPARC 14 -06 -2005
Control room IV Review SPARC 14 -06 -2005
Control room IV Review SPARC 14 -06 -2005
Control room • 5 CPU with 2 monitor and two Ethernet connection 10/1000 • 1 server • 1 service CPU • 1 optical switch CISCO in home • 3 switch 10/1000 CISCO in home IV Review SPARC 14 -06 -2005
Network IV Review SPARC 14 -06 -2005
Network IV Review SPARC 14 -06 -2005
Network IV Review SPARC 14 -06 -2005
Network 2 2 IV Review SPARC 14 -06 -2005 2 2
SOFTWARE IV Review SPARC 14 -06 -2005
Magnet • • To control a magnet means to control a power supply. 9 Solenoids Modbus protocol 12 Quadrupoles + 8 3 Bendigs 12 Steering correctors Software is imported from Dafne control system IV Review SPARC 14 -06 -2005
RF • Modulators: come with an Ethernet interface. It is based on Siemens PLC it send at 10 Hz the complete status. Driver tested and start portin under control system. • Amplifier (Milmega) is remote controlled trough Ethernet • Defined number and type of control. Software under development 50 pulse shape phase and amplitude readout digitizer 15 attenuator and phase shifter motorized 4 analog signal 6 digital I/O IV Review SPARC 14 -06 -2005
Vacuum • Pump 24 software completed – 3 Analog signal – 1 digital input – 1 digital output Ethernet as field bus. • Vacuumeter 6 software completed – serial interface acquired an Ethernet to serial converter with 8 port IV Review SPARC 14 -06 -2005
Diagnostic • Acquisition camera. – Acquisition software installed in TTF 2 and working (12 fps on 100 Mbit Ethernet) IEEE 1394 Software under test • Flag movement. – Stepper motor. Driver completed software under development • BPM reading. – PCI board • Charge monitor reading – Electronic from Bergoz acquisition with PCI multimeter IV Review SPARC 14 -06 -2005
IV Review SPARC 14 -06 -2005
IV Review SPARC 14 -06 -2005