Deutscher Wetterdienst Operational Status of GIS Offenbach Bernd Richter, DWD bernd. richter@dwd. de Markus Deutscher Wetterdienst Operational Status of GIS Offenbach Bernd Richter, DWD bernd. [email protected] de Markus Heene, DWD markus. [email protected] de

WIS WMO Information System GISC OFFENBACH RTH OFFENBACH NC Israel NC Jordan NC Switzerland WIS WMO Information System GISC OFFENBACH RTH OFFENBACH NC Israel NC Jordan NC Switzerland Page: 2

Area of Responsibility „Principal GISC“ Offenbach GISC Offenbach Ao. R NC 27 chart left Area of Responsibility „Principal GISC“ Offenbach GISC Offenbach Ao. R NC 27 chart left plus Kenya DCPC acting as RTH Norrköping, Prague, Vienna, Sofia, Rome DCPC external Eumetsat Arctic Data Center PANGAEA + other DCPC internal GPCC (Precipitation) NCC (National Climate) + other Page: 3

Services offered to all Centers in its Ao. R Basic GISC Functions - Data Services offered to all Centers in its Ao. R Basic GISC Functions - Data Collection and Dissemination - Backup Procedures for Data Collection and Dissemination Monitoring - Web-based Monitoring Tools of / for all Centers in ist Ao. R - Data volume / number of bulletins - Data availability (missing bulletins) - Data formal quality (corrupt BUFR) - Data Page: 4

Services offered to all Centers in its Ao. R continued Metadata Management - Metadata Services offered to all Centers in its Ao. R continued Metadata Management - Metadata Generator (INPUT: WMO AN-File) - Metadata Editor - Metadata Monitor - Metadata Amendment Service Metadata of Ao. R monitored for missing metadata Missing data created and made available to Ao. R Page: 5

Services offered to all Centers in its Ao. R continued Capacity building GISC Offenbach Services offered to all Centers in its Ao. R continued Capacity building GISC Offenbach keeps its Ao. R ‚In the loop‘ by - Regular Telephone Conferences - Workshops next planned with Austria (+Slovenija +Croatia), Italy, Jordan - Bilateral Support (metadata, data acquisition) - Quarterly Download tests at Backup GISC Moscow / Tokyo Page: 6

Monitoring of / for Centers of Area of Responsibility Page: 7 Monitoring of / for Centers of Area of Responsibility Page: 7

Monitoring Global Data Exchange GB TI Pläne 2015 Page: 8 Monitoring Global Data Exchange GB TI Pläne 2015 Page: 8

24 / 7 Operations Page: 9 24 / 7 Operations Page: 9

Graphical User Interface GUI Features Search & Retrieval Subscription - by selection of data Graphical User Interface GUI Features Search & Retrieval Subscription - by selection of data - by import of external lists Preview of Data - BUFR, GRIB, MOS Metadata Editor Page: 10

Backup Procedures Goal of backup Procedures: § No service interruption in case of outage Backup Procedures Goal of backup Procedures: § No service interruption in case of outage of single NC / DCPC / GISC § 6. 2. 3 Each GISC should maintain business continuity plans and handover arrangements to ensure continued service to the NCs and DCPCs in its area of responsibility, especially for the collection and distribution of data and products. § 6. 3. 2 Data collection and distribution must continue without interruption to and from centres in the GISC area being backed up. Where a centre's routine receipt of data is through subscription (e. g. GTS push), the backup GISC must have a current list of data to be sent to each centre or provide a place for the centres to come and get the data (e. g. GISC Cache). Page: 11

Scenario 1 – Direct connected Centre (data collection) § Direct connected centres should upload Scenario 1 – Direct connected Centre (data collection) § Direct connected centres should upload direct to the backup GISC Backup GISC JMA DWD Meteo. Swiss § Preferred upload: Continuous upload also in standard operation § Examples: Switzerland, Jordan and Israel Page: 12

Scenario 2 – Indirect connected Centre (data collection) Backup GISC JPN / RUS DWD Scenario 2 – Indirect connected Centre (data collection) Backup GISC JPN / RUS DWD RTH / DCPC Norrköping NC Norway § RTH/DCPC uploads data of its Ao. R to GISC and Backup-GISC Page: 13

Data dissemination Backup GISC DWD JMA RTH Bangkok NC Cambodia § GISC Offenbach offers Data dissemination Backup GISC DWD JMA RTH Bangkok NC Cambodia § GISC Offenbach offers a FTP for centres in GISC Tokyo Area of Responsibility § GISC Offenbach offers a web-based subscription service defining its own basket for activation of delivery in case of backup Page: 14

Data collection - Summary § In case of outage of Principal GISC, all data Data collection - Summary § In case of outage of Principal GISC, all data of its Ao. R are available in the Backup GISC § In case of outage of Principal GISC, all data of directly connected centers are available in the Backup GISC § In case of outage of RTH/DCPC , all data of its Ao. R are available in the principal GISC § In case of outage of Principal GISC, all centers of its Ao. R get their data from the Backup GISC § All centers are invited to take part in a quarterly backup download test. § Not covered in backup procedure: Metadata management, change of GTS subscription Page: 15

Q&A Page: 16 Q&A Page: 16