e4ff9b92fbef0c4f951838b86ae630bb.ppt
- Количество слайдов: 21
Design anywhere, Build anywhere INTEROP ESA ’ 05 Date: 24/02/05 Anne H Waywell 5864_ER_AERO
INTEROP ESA ‘ 05 Overview • Background • Opportunity • Strategy • Approach • Benefits • Experience • Conclusion • Discussion 3/19/2018 5: 26: 23 AM 5864_ER_AERO 2
INTEROP ESA ‘ 05 Background DNC – Distributed or Direct Numerical Control 1980 – Machine instructions for NC milling machines transmitted over telephone – Later evolved to mean system where a group of NC machines are connected to a central computer or – A combination of computers are linked to one or more CNC machines by LAN – CNC machines - tools that have a memory to control their operation – NC programs are distributed to the memory of CNC machine – ISO format most widely used • Use of Standards – promote interoperability – vendor interpretation failed to meet expectations 3/19/2018 5: 26: 24 AM 5864_ER_AERO 3
INTEROP ESA ‘ 05 Background FMS – Flexible Manufacturing Systems 1985 • Arrangement of machines – interconnected by a transport system giving flexibility to a variety of manufacturing operations. Transporter carries work to machines on pallets so that work-machine registration is accurate, rapid and automatic. A central computer controls both machines and transport system. 3/19/2018 5: 26: 24 AM 5864_ER_AERO 4
INTEROP ESA ‘ 05 Background FMS – Flexible Manufacturing Systems 1985 – The manufacturing environment considered totally automated into a ‘lights out’ situation – Proved possible only in limited manufacturing applications – Still remains a goal to produce a fully integrated environment even across organisations today 3/19/2018 5: 26: 24 AM 5864_ER_AERO 5
INTEROP ESA ‘ 05 Background OBA – Overall Business Architecture 1983 – Took this philosophy to the factory level – First generation integrated business system between design, planning, materials, manufacturing, procurement and invoicing application systems – Individual applications • • • Were locked together Difficult to maintain Inhibited business change Affected competitiveness of the business Were built to aid a discipline, not to integrate with other disciplines • Information was locked into application • Integration of these applications - expensive point to point interfaces 3/19/2018 5: 26: 25 AM 5864_ER_AERO 6
INTEROP ESA ‘ 05 Opportunity • Need for a more modular approach, where – Data is seen as separate from application – Information is key company asset and treated differently from application – Data / information needs to be protected as it has a life expectancy – Data standards are used – • XML-xx standards need to be developed like platform following STEP for exchanging data across PDM Systems via a neutral standard • This approach was used for the next generation of integration for e-Business and outsourced business 3/19/2018 5: 26: 25 AM 5864_ER_AERO 7
INTEROP ESA ‘ 05 Case Study - Opportunity • Depends on interface between PDM and ERP Systems – To transfer parts or Bo. Ms to allow designed items to be manufactured • Multiple PDM Systems were linked with multiple ERP Systems using point to point solutions – Used Sherpa for PDM, Network MTO (Compass Contract) for ERP and Tibco as the Message Broker • Launched a programme to replace Sherpa PDM System with single corporate Metaphase PDM System • No interface existed between Metaphase and the ERP Systems – Requirement for interface from Metaphase to any ERP system, supporting concept of ‘Design anywhere, Build anywhere’ – Transfer single parts, single level Bo. Ms and multi level Bo. Ms 3/19/2018 5: 26: 25 AM 5864_ER_AERO 8
INTEROP ESA ‘ 05 Opportunity Tibco Sherpa Metaphase ERP ERP Tibco Sherpa Metaphase ERP 3/19/2018 5: 26: 25 AM 5864_ER_AERO 9
INTEROP ESA ‘ 05 Strategy • Interface needed to be designed and data translations understood • Previously used proprietary Message Broker and to meet needs of interfacing to an External Marketplace system – New corporate Message Broker sought – Known as Enterprise Application Infrastructure (EAI) (web. Methods) – Supports initiatives such as A 2 A, B 2 B, B 2 C, EAI, BPM, BPA, EDI – Deliver true business driven end to end integration and interoperability between packaged and custom applications, mainframe system transactions (legacy), front and back office systems, Web services, business partners and human workflow 3/19/2018 5: 26: 25 AM 5864_ER_AERO 10
INTEROP ESA ‘ 05 Approach Tibco Sherpa Metaphase ERP ERP EAI EAI Tibco Sherpa ERP EAI ERP ERP Metaphase ERP 3/19/2018 5: 26: 25 AM 5864_ER_AERO 11
INTEROP ESA ‘ 05 Approach Publish Write IS Adapter e. AI Broker IS Adapter e Metaphase Extract CSC e. AI PDM Adapter web. Methods BAE SYSTEMS e. AI Backbone CSC e. AI MTO Adapter BOM Upload Application 2 Network Procurement Manugistics BOM Subscribe ERP Network MTO Manugistics PDM Metaphase EDS Write EXTRACT Application 1 Read UPLOADER Extract Application 3 Return errors Manugistics Uploader 3/19/2018 5: 26: 25 AM 5864_ER_AERO 12
INTEROP ESA ‘ 05 Metaphase to MTO Interface Metaphase PDM Extract Adapter Infrastructure IS Adapter Network Procurement ES (Enterprise Server) MTO IS Adapter MTO Server API Metaphase API Infrastructure Metaphase Server MTO Uploader Adapter IS Adapter = IS Adapter Application API + IS Adapter + Broker pack & Bridge Generic e. AI Services: Log X-Ref e. AI Broker Server 3/19/2018 5: 26: 25 AM 5864_ER_AERO 13
INTEROP ESA ‘ 05 Extract Read Subscribe Application 3 e PRODUCTION EXTRACT FTP* PDM Metaphase EDS IS Adapter Test e. AI Broker IS Adapter e TEST Metaphase Extract CSC e. AI PDM Adapter web. Methods BAE SYSTEMS e. AI Backbone CSC e. AI MTO Adapter Return errors Network Procurement IS Adapter Upload Application 2 PRODUCTION Network Procurement Production e. AI Broker BOM ERP Network MTO Manugistics IS Adapter Write ERP Network MTO Manugistics Publish UPLOADER BOM UPLOADER PDM Metaphase EDS EXTRACT Application 1 Write TEST Manugistics Uploader 3/19/2018 5: 26 AM 5864_ER_AERO 14
INTEROP ESA ‘ 05 Metaphase to MTO Interface IS Adapter Metaphase PDM Extract Adapter IS Adapter = Application API + IS Adapter + Broker pack & Bridge Infrastructure API Test MTO Server ES (Enterprise Server) Adapter Generic e. AI Services: Log X-Ref IS Adapter Infrastructure Metaphase API Infrastructure Test Metaphase Server Generic e. AI Services: Log X-Ref e. AI Production Broker Server Network Procurement FTP Adapter Uploader MTO Adapter MTO Metaphase PDM Extract Adapter IS Adapter Network Procurement ES (Enterprise Server) API Infrastructure Metaphase IS Adapter MTO Production MTO Server Production Metaphase Server MTO Uploader Adapter Note: Network Procurement not installed, but Adapter has user defined option to specify e. AI Test Broker Server 3/19/2018 5: 26 AM 5864_ER_AERO 15
INTEROP ESA ‘ 05 Benefits • A single software solution in place, consisting of 4 modules, utilising the EAI solution, with separate paths as required for each business • Software is easier to maintain • Allows changes to the modules/adapters independently • Allows legacy information to be stored in canonical form in neutral database • Facilities developed for one site are available for other sites if required • Solution supports the concept of ‘Design anywhere, Build anywhere’, reducing ordering times by 50% and reducing the number of internal buyers / procurement staff 3/19/2018 5: 26 AM 5864_ER_AERO 16
INTEROP ESA ‘ 05 Experience • Now possible to link – internal procurement systems i. e. SAP, Baa. N, Network MTO to the External Marketplace System / Trading Portal (EXOSTAR) – supplier catalogues, order parts and invoice totally electronically – Internal HR Systems to external HR Systems 3/19/2018 5: 26 AM 5864_ER_AERO 17
INTEROP ESA ‘ 05 Experience Internal Avionics Metaphase UWS Metaphase EAI EAI EAI External ERP ERPMTO EXOSTAR ERP – MTO people. Portal Air Systems ERP – Baa. N CS&S, RO ERP – SAP HR Systems 3/19/2018 5: 26 AM 5864_ER_AERO 18
INTEROP ESA ‘ 05 Conclusion • EAI is a strategic platform for information exchange between functional areas, within and external to an enterprise • Promoted by Procurement for connecting to External Marketplace System and need to reduce costs • Extended to support the outsourcing of HR Services • EAI approach allows modular (component) building of a system that has a degree of dynamic reconfigurability to meet business need of delivering capability for a contract • Minimal investment costs • Only one new MTO Adapter (& may be an update to Uploader, dependent upon requirements) • But it is at a price – Adapter writing – approx. 10 days effort – Specification and understanding of the business rules – approx. 8 weeks • Clearly software is NOT a problem – Business understanding - Modelling is 3/19/2018 5: 26 AM 5864_ER_AERO 19
Discussion Anne H Waywell awaywell@csc. com Tel. No. +44 7769 725749 5864_ER_AERO
Experience. Results. 5864_ER_AERO
e4ff9b92fbef0c4f951838b86ae630bb.ppt