Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #26 Plenary From: Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #26 Plenary From: Matt Maki / DCL Trials Lead Date: 08. 22. 2013 Federal Aviation Administration

DTAP SW Patch 5. 1 Update • Included Requirements: SID NONE MAINT ALT NONE DTAP SW Patch 5. 1 Update • Included Requirements: SID NONE MAINT ALT NONE Double TO Dual Contact/Drop Down Remarks • Thales development work on-going • Expected delivery to FAA for initial WJHTC testing late Sept, early Oct • Functional Testing, SAT at MEM, EWR planning Federal Aviation Administration 2

Build 7 Update • Down selected Requirements Proposal Evaluation Underway • Budget, Scope, Cost Build 7 Update • Down selected Requirements Proposal Evaluation Underway • Budget, Scope, Cost Considerations • Arrival Procedure Processing Consideration Federal Aviation Administration 3

MEM/EWR Trials Schedule • MEM FDX Full Fleet 24 x 7 Trials Starts Sept. MEM/EWR Trials Schedule • MEM FDX Full Fleet 24 x 7 Trials Starts Sept. 3, 2013: B 777 (15) and MD-11 (20) completed minimum successful ops during Limited Trials B 777 full functionality, MD-11 CAF only until DTAP Patch 5 SW implemented in Oct FDX CMO Paperwork Complete, ATC Training Starts 8/26 • EWR Limited Trials to continue thru SWAP: - BAW, UPS, FDX, UAL, DLH participating SAS currently standing down over Airbus CLR 7+ FMS Issue Federal Aviation Administration 4

Initial UAL EWR DCL Ops • UAL Starting Limited Trials B 767 Ops at Initial UAL EWR DCL Ops • UAL Starting Limited Trials B 767 Ops at EWR Sept. 3 (3 -5 flights): Initial CMO paperwork complete EWR CMO Update to Planned initial 3 -5 daily flights (8/21 Trent) UAL 956 - 1755 GVA * (Pending FANS retrofit) UAL 964 - 1820 AMS * (Pending FANS retrofit) UAL 992 - 1845 ZRH UAL 904 - 1915 IST UAL 847 - 2155 EZE • Trials Ops Support on site at EWR Sept 3 -5 • UAL planning ~20 B 777 EWR domestic/international operations on rolling basis starting post SWAP Federal Aviation Administration 5

DCL Ops Reporting • Currently manual ops reports from MEM/EWR, HADDS • Long Term DCL Ops Reporting • Currently manual ops reports from MEM/EWR, HADDS • Long Term automated ops reporting implementation (Harris/Boeing planning) • Needed for ops tracking during 24 x 7 full Trials Federal Aviation Administration 6

8/22 z EWR DTAP Alert Federal Aviation Administration 7 8/22 z EWR DTAP Alert Federal Aviation Administration 7

8/22 z FDX 1202 Federal Aviation Administration 8 8/22 z FDX 1202 Federal Aviation Administration 8

MEM DCL Ops Since 4/17/13 – Start of Limited Ops Trials CAF Initial UM MEM DCL Ops Since 4/17/13 – Start of Limited Ops Trials CAF Initial UM 79 Initial UM 80 UM 79 Rev UM 80 Rev Total UM WILCO Aircraft Airline Total DCL Flights MD 11 FDX 35 34 0 1 9 5 49 B 777 FDX 16 14 1 1 6 2 24 Current Up Thru 8/21/13 Federal Aviation Administration 9

MEM DCL Ops Since 4/17/13 Lessons Learned Unplanned Voice Clearance/ PDC Issued FRC DCL MEM DCL Ops Since 4/17/13 Lessons Learned Unplanned Voice Clearance/ PDC Issued FRC DCL Filing Issues (Not Filed or Within First 22 Characters) and/or Crew Status (Not DCL Approved) DTAP Automation – FANS Avionics Issues/Testing HADDS/ CSP/ Network Issues ATC/FD Coordination AC Mechanical/ Diversions 27 14 6 2 4 1 Current Up Thru 8/21/13 Federal Aviation Administration 10

EWR DCL Ops Since 5/16/13 - Start of Limited Ops Trials CAF Initial UM EWR DCL Ops Since 5/16/13 - Start of Limited Ops Trials CAF Initial UM 79 Initial UM 80 UM 79 Rev UM 80 Rev Total UM WILCO 14 12 0 2 5 4 23 FDX 3 2 1 0 0 0 3 BAW 15 15 0 0 15 FDX 3 3 0 0 3 UPS 2 1 1 0 0 0 2 UAL 0 0 0 0 A 333 SAS 2 1 1 0 0 0 2 A 343/6 DLH* 52 52 0 0 1 0 53 Aircraft MD 11 B 777 B 767 Airline Total DCL Flights UPS Current Up Thru 8/21/13 * HADDS Check Federal Aviation Administration 11

EWR DCL Ops Since 5/16/13 Lessons Learned Unplanned Voice Clearance/ PDC Issued FRC DCL EWR DCL Ops Since 5/16/13 Lessons Learned Unplanned Voice Clearance/ PDC Issued FRC DCL Filing Issues (Not Filed or Within First 22 Characters) and/or Crew Status (Not DCL Approved) DTAP Automation – FANS Avionics Issues/Testing HADDS/ CSP/ Network Issues ATC/FD Coordination AC Mechanical/ Diversions 51 35 9 3 2 2 Current Up Thru 8/21/13 Federal Aviation Administration 12

MEM FDIO Test NCP Update • Case File approved thru CMRT • Aug CCB MEM FDIO Test NCP Update • Case File approved thru CMRT • Aug CCB board approval expected Federal Aviation Administration 13

Questions ? KUSA Federal Aviation Administration Questions ? KUSA Federal Aviation Administration